# US 2023/0066892 A1 · Production schedule estimation method and system of semiconductor process

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0066892 A1
- Document ID: US20230066892A1
- Status: Published application
- Kind: A1
- Application number: 17/491,502
- Filed: 2021-09-30
- Published: 2023-03-02
- Earliest claimed: 2021-08-26
- Assignees: Powerchip Semiconductor Manufacturing Corporation
- Applicants: Powerchip Semiconductor Manufacturing Corporation
- Inventors: Chih-Neng Liu; Chih-Chuen Huang; Chia-Jen Fu; Chih-Hsiang Chang
- Web page: https://patentgrep.com/patent/US20230066892A1

## CPC

- G05B 19/41865: {characterised by job scheduling, process planning, material flow}
- G06N 20/00: Machine learning
- G05B 2219/32252: Scheduling production, machining, job shop
- G05B 2219/45031: Manufacturing semiconductor wafers
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS

## Abstract

A production schedule estimation method and a production schedule estimation system are provided. The production schedule estimation method includes the following steps. Current-day work-in-process data, machine group cycle time data of a machine group, and productivity data of the machine group are obtained. The current-day work-in-process data, the cycle time data of the machine group, and the productivity data of the machine group are inputted into a prediction model. Current-day cycle time data and a current-day move volume for each of multiple stations in the machine group are calculated through the prediction model. And, current-day move data is calculated according to the current-day cycle time data and the current-day move volume for each of the multiple stations in the machine group.

## Claims

### Claim 1

A production schedule estimation method of a semiconductor process, comprising:
obtaining a current-day work-in-process data, a cycle time data of a machine group, and a productivity data of the machine group;
inputting the current-day work-in-process data, the cycle time data of the machine group, and the productivity data of the machine group into a prediction model;
calculating a current-day cycle time data and a current-day move volume for each of a plurality of stations in the machine group through the prediction model; and
calculating a current-day move data according to the current-day cycle time data and the current-day move volume for the each of the plurality of stations in the machine group.

### Claim 2 (depends on 1)

The production schedule estimation method according to claim 1, further comprising:
calculating a next-day work-in-process data according to the current-day cycle time data and the current-day move volume for the each of the plurality of stations in the machine group, and recursively executing the prediction model, so as to obtain a product production time and a quantity of a product produced.

### Claim 3 (depends on 2)

The production schedule estimation method according to claim 2, wherein the current-day move data comprises a type of a work-in-process and a current-day move volume after the work-in-process has been processed by the plurality of stations in the machine group on the current day.

### Claim 4 (depends on 1)

The production schedule estimation method according to claim 1, wherein the quantity of the product produced is a sum of a plurality of move volumes corresponding to every of the plurality of stations in a plurality of machine groups on different days generated during recursive execution of the production schedule estimation method.

### Claim 5 (depends on 1)

The production schedule estimation method according to claim 1, wherein a plurality of cycle time data corresponding to different days generated during recursive execution of the production schedule estimation method are a plurality of dynamic cycle times of a machine.

### Claim 6 (depends on 1)

The production schedule estimation method according to claim 1, wherein the step of obtaining the cycle time data of the machine group and the productivity data of the machine group comprises:
obtaining a work-in-process historical data and a machine historical data;
performing a feature extraction on the work-in-process historical data and the machine historical data, so as to obtain a plurality of feature data; and
inputting the plurality of feature data into a machine learning module, to enable the machine learning module to perform a prediction to output the cycle time data of the machine group and the productivity data of the machine group.

### Claim 7 (depends on 6)

The production schedule estimation method according to claim 6, wherein the cycle time data of the machine group comprises a plurality of cycle times of the machine group corresponding to a plurality of stations of a same machine type for different quantities of work-in-process and different types of the work-in-process.

### Claim 8 (depends on 6)

The production schedule estimation method according to claim 6, wherein the productivity data of the machine group comprises at least one of a plurality of move volume data, a plurality of up-time data, a plurality of mean time between failures data, and a plurality of mean time to recovery data corresponding to a plurality of stations of a same machine type for different quantities of work-in-process and different types of the work-in-process inputted.

### Claim 9 (depends on 6)

The production schedule estimation method according to claim 6, wherein the plurality of feature data comprises a daily move data, an up-time data, a down-time data, a mean time between failures data, and a mean time to recovery data of different stations.

### Claim 10 (depends on 6)

The production schedule estimation method according to claim 6, wherein the plurality of feature data comprises stagnation time data of different quantities of a work-in-process and different types of the work-in-process respectively of different stations.

### Claim 11

A production schedule estimation system of a semiconductor process, comprising:
a storage device, configured to store a prediction model; and
a processing device, coupled to the storage device and configured to execute the prediction model,
wherein the processing device obtains a current-day work-in-process data, a cycle time data of a machine group, and a productivity data of the machine group, inputs the current-day work-in-process data, the cycle time data of the machine group, and the productivity data of the machine group into the prediction model, and calculates a current-day cycle time data and a current-day move volume for each of a plurality of stations in the machine group through the prediction model,
wherein the processing device calculates a current-day move data according to the current-day cycle time data and the current-day move volume for the each of the plurality of stations in the machine group.

### Claim 12 (depends on 11)

The production schedule estimation system according to claim 11, wherein the processing device calculate a next-day work-in-process data according to the current-day cycle time data and the current-day move volume for the each of the plurality of stations in the machine group, and recursively executes the prediction model, so as to obtain a product production time and a quantity of a product produced.

### Claim 13 (depends on 12)

The production schedule estimation system according to claim 12, wherein the current-day move data comprises a type of a work-in-process and a current-day move volume after the work-in-process has been processed by the plurality of stations in the machine group on the current day.

### Claim 14 (depends on 11)

The production schedule estimation system according to claim 11, wherein the quantity of the product produced is a sum of a plurality of move volumes corresponding to every of the plurality of stations in a plurality of machine groups on different days generated during recursive execution of the production schedule estimation method.

### Claim 15 (depends on 11)

The production schedule estimation system according to claim 11, wherein a plurality of cycle time data corresponding to different days generated during recursive execution of the production schedule estimation method are a plurality of dynamic cycle times of a machine.

### Claim 16 (depends on 11)

The production schedule estimation system according to claim 11, wherein the processing device obtains a work-in-process historical data and a machine historical data, and the processing device performs a feature extraction on the work-in-process historical data and the machine historical data, so as to obtain a plurality of feature data,
wherein the processing device inputs the plurality of feature data into a machine learning module, to enable the machine learning module to perform a prediction to output the cycle time data of the machine group and the productivity data of the machine group.

### Claim 17 (depends on 16)

The production schedule estimation system according to claim 16, wherein the cycle time data of the machine group comprises a plurality of cycle times of the machine group corresponding to a plurality of stations of a same machine type for different quantities of work-in-process and different types of the work-in-process.

### Claim 18 (depends on 16)

The production schedule estimation system according to claim 16, wherein the productivity data of the machine group comprises at least one of a plurality of move volume data, a plurality of up-time data, a plurality of mean time between failures data, and a plurality of mean time to recovery data corresponding to a plurality of stations of a same machine type for different quantities of work-in-process and different types of the work-in-process inputted.

### Claim 19 (depends on 16)

The production schedule estimation system according to claim 16, wherein the plurality of feature data comprises a daily move data, an up-time data, a down-time data, a mean time between failures data, and a mean time to recovery data of different stations.

### Claim 20 (depends on 16)

The production schedule estimation system according to claim 16, wherein the plurality of feature data comprises stagnation time data of different quantities of a work-in-process and different types of the work-in-process respectively of different stations.