# US 2023/0059098 A1 · System, method, and interface for goal-allocation of resources and dynamic monitoring of progress

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0059098 A1
- Document ID: US20230059098A1
- Status: Published application
- Kind: A1
- Application number: 17/961,523
- Filed: 2022-10-06
- Published: 2023-02-23
- Earliest claimed: 2019-09-19
- Assignees: Dynamhex Technologies, LLC
- Applicants: Dynamhex Technologies, LLC
- Inventors: Sanwar Azam Sunny
- Web page: https://patentgrep.com/patent/US20230059098A1

## CPC

- H02J 3/003: {Load forecast, e.g. methods or systems for forecasting future load demand}
- G06Q 30/0206: {Price or cost determination based on market factors}
- H02J 3/004: {Generation forecast, e.g. methods or systems for forecasting future energy generation}
- H02J 13/10: characterised by displaying of information or by user interaction, e.g. supervisory control and data acquisition [SCADA] systems
- H02J 13/12: Monitoring network conditions, e.g. electrical magnitudes or operational status
- G06Q 50/06: Energy or water supply
- H02J 2101/10: Dispersed power generation using fossil fuels, e.g. diesel generators
- H02J 2101/20: Dispersed power generation using renewable energy sources
- H02J 2101/40: Hybrid power plants, i.e. a plurality of different generation technologies being operated at one power plant
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- H02J 2103/35: Grid-level management of power transmission or distribution systems, e.g. load flow analysis or active network management
- Y02E 60/00: Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y04S 10/30: State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
- Y04S 10/40: Display of information, e.g. of data or controls
- Y04S 40/20: Information technology specific aspects, e.g. CAD, simulation, modelling, system security
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

System, method, and interface for visualized resource allocation and algorithms for the reallocation of resources to achieve a goal. The system analyses an initial state of resource allocation, a cost function for undesirable resources, and a set of potential incremental improvements, each with an associated cost, and determines a step-wise path of applying the incremental improvements to achieve an ultimate resource-allocation goal in an economically feasible way. Simultaneously, a user interface depicts the state of the allocation at the beginning, at the end, and along the path, allowing an intuitive understanding of how the goal will be achieved.

## Claims

### Claim 1

One or more non-transitory computer-readable storage media storing computer-executable instructions that, when executed by at least one processor, perform a method of resource allocation of resources to achieve a goal and dynamic monitoring of progress, the method comprising:
receiving source data indicative of flow types;
receiving transformation data indicative of flow transformations,
wherein the flow types and the flow transformations are classified by region;
generating, by an interface, visualizations of the flow types based on the source data and the flow transformations based on the transformation data;
monitoring the source data and the transformation data; and
adjusting resource allocations to maintain an optimal allocation of the resources.

### Claim 2 (depends on 1)

The media of claim 1, wherein the flow types are input flow, output flow, total flow, wasted flow, and remaining flow.

### Claim 3 (depends on 2)

The media of claim 2, wherein the flow transformations are indicative of changes in public and private social infrastructure and transportation.

### Claim 4 (depends on 1)

The media of claim 1,
wherein the source data is indicative of social contributions to greenhouse gases, and
wherein the resource allocations are adjusted to reduce greenhouse effects.

### Claim 5 (depends on 4)

The media of claim 4, wherein the method further comprises adjusting coal, petroleum, and natural gas usage by residential, business, and transportation.

### Claim 6 (depends on 5)

The media of claim 5, wherein the method further comprises:
determining the region for the source data;
calculating a greenhouse cost for the social contributions to the greenhouse gases; and
calculating a resource cost for the resource allocation to reduce the greenhouse effects.

### Claim 7 (depends on 6)

The media of claim 6, wherein the method further comprises displaying, for any region or data source within the region, a processing efficiency, emissions data, and region costs.

### Claim 8 (depends on 1)

The media of claim 1,
wherein the flow types comprise a benign inflow from a benign source and a harmful inflow from a harmful source, and
wherein the method further comprises increasing the benign inflow by increments and incrementally reducing the harmful inflow.

### Claim 9 (depends on 8)

The media of claim 8, wherein the method further comprises:
tracking a cost of each of the benign inflow and the harmful inflow; and
maximizing the benign inflow with a cost constraint.

### Claim 10 (depends on 1)

The media of claim 1, wherein the method further comprises:
monitoring the region and determining resource consumption patterns across the region;
displaying, by the interface and across at least a present and a future timeline, the resource consumption patterns and a cost associated with the resource consumption patterns;
receiving, by the interface, an input changing one or more parameters along the future timeline; and
displaying, by the interface, changes to the cost and the resource allocation based on the one or more parameters.

### Claim 11 (depends on 10)

The media of claim 10, wherein the method further comprises:
evaluating the cost, a savings, and a potential cost across at least the present and the future timeline,
wherein the potential cost is a difference between a maximum cost and the cost based on the one or more parameters; and
further displaying the cost and the one or more parameters in a real-time cube view or a linear temporal view.

### Claim 12 (depends on 1)

The media of claim 1, wherein the method further comprises:
receiving the source data from a network device or a data acquisition machine,
wherein the source data is monitored continuously or periodically based on an expected quantity of the flow types.

### Claim 13

A method of resource allocation of resources to achieve a goal and dynamic monitoring of progress, the method comprising:
receiving source data indicative of flow types;
receiving transformation data indicative of flow transformations;
generating, by an interface, visualizations of the flow types based on the source data and the flow transformations based on the transformation data;
continuously monitoring the source data and the transformation data; and
adjusting resource allocations to maintain an optimal allocation of the resources.

### Claim 14 (depends on 13)

The method of claim 13, further comprising:
determining a region for the source data;
calculating a greenhouse cost for infrastructure contributions to a greenhouse gases in the region;
calculating a resource cost for the resource allocations to reduce greenhouse effects;
displaying, for any region or data source within the region, emissions data and region costs; and
adjusting the resource allocations to reduce the greenhouse effects.

### Claim 15 (depends on 13)

The method of claim 13,
wherein the flow types are input flow, output flow, total flow, wasted flow, and remaining flow, and
wherein the flow transformations are indicative of changes in public and private social infrastructure and transportation.

### Claim 16 (depends on 13)

The method of claim 13, further comprising:
receiving the source data from a network device or a data acquisition machine,
wherein the source data is monitored continuously or periodically based on an expected quantity of the flow types.

### Claim 17

One or more non-transitory computer-readable storage media storing computer-executable instructions that, when executed by at least one processor, perform a method of resource allocation of resources to achieve a goal and dynamic monitoring of progress, the method comprising:
receiving source data indicative of flow types;
receiving transformation data indicative of flow transformations;
generating, by an interface, visualizations of the flow types based on the source data and the flow transformations based on the transformation data;
continuously monitoring the source data and the transformation data; and
adjusting resource allocations to maintain an optimal allocation of the resources.

### Claim 18 (depends on 17)

The media of claim 17, wherein the method further comprises:
receiving, by the interface, an input changing one or more parameters along a timeline;
evaluating a cost, a savings, and a potential cost across the timeline;
wherein the potential cost is a difference between a maximum cost and the cost based on the one or more parameters; and
displaying, by the interface, the cost and the resource allocation based on the one or more parameters.

### Claim 19 (depends on 17)

The media of claim 17, wherein the method further comprises:
determining a region for the source data;
calculating a greenhouse cost for estimated greenhouse gases emitted by infrastructure in the region;
calculating a resource cost for the resource allocations to reduce greenhouse effects; and
displaying, for any region or data source within the region, emissions data, and region costs associated with the resource allocations.

### Claim 20 (depends on 17)

The media of claim 17, wherein the method further comprises:
receiving the source data from a network device or a data acquisition machine,
wherein the source data is monitored continuously or periodically based on an expected quantity of the flow types,
wherein the flow types are input flow, output flow, total flow, wasted flow, and remaining flow, and
wherein the flow transformations are indicative of changes in public and private social infrastructure and transportation.