# US 2023/0058683 A1 · Well construction optimization techniques

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0058683 A1
- Document ID: US20230058683A1
- Status: Published application
- Kind: A1
- Application number: 17/404,446
- Filed: 2021-08-17
- Published: 2023-02-23
- Earliest claimed: 2021-08-17
- Assignees: Landmark Graphics Corporation
- Applicants: Landmark Graphics Corporation
- Inventors: Paulo Alves Braz; Roger David Marin Martinez; Gabriel Tirado; Marcelo Gomes de Souza; Damian Martinez; Henrique de Azevedo Araujo; Cristian Fattori
- Web page: https://patentgrep.com/patent/US20230058683A1

## CPC

- E21B 44/00: Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
- G06Q 10/06: Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q 10/0639: Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q 50/02: Agriculture; Fishing; Forestry; Mining
- E21B 2200/20: Computer models or simulations, e.g. for reservoirs under production, drill bits
- E21B 2200/22: Fuzzy logic, artificial intelligence, neural networks or the like
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A method includes acquiring historical well construction data associated with a set of historical wells. The method also includes developing a well construction model using the corpus of historical well construction data. Additionally, the method includes acquiring real-time well construction data during a well construction operation and applying the well construction model to the real-time well construction data to identify changes to a well construction parameter. Further, the method includes outputting a command to update the well construction operation using the changes to the well construction parameter.

## Claims

### Claim 1

A method comprising:
acquiring a corpus of historical well construction data associated with a set of historical wells;
developing a well construction model using the corpus of historical well construction data;
acquiring real-time well construction data during a well construction operation;
applying the well construction model to the real-time well construction data to (i) identify well construction inefficiencies and (ii) generate changes to a well construction parameter; and
outputting a command to update the well construction operation using the changes to the well construction parameter.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
identifying a technical limit of well construction timing using the corpus of historical well construction data, wherein the well construction model is further developed using the technical limit of well construction timing.

### Claim 3 (depends on 1)

The method of claim 1, further comprising:
updating the well construction model using the real-time well construction data and the changes to the well construction parameter.

### Claim 4 (depends on 1)

The method of claim 1, wherein the well construction parameter comprises drilling parameters of the well construction operation.

### Claim 5 (depends on 1)

The method of claim 1, wherein applying the well construction model to the real-time well construction data further identifies causes of the well construction inefficiencies of the well construction operation.

### Claim 6 (depends on 1)

The method of claim 1, wherein developing the well construction model comprises training a machine-learning model using the corpus of historical well construction data.

### Claim 7 (depends on 1)

The method of claim 1, further comprising:
updating the corpus of historical well construction data to remove a set of well construction data that is not compatible with a well system constructed by the well construction operation.

### Claim 8

A system comprising:
a processor; and
a non-transitory memory device communicatively coupled to the processor comprising instructions that are executable by the processor to cause the processor to perform operations comprising:
acquiring a corpus of historical well construction data associated with a set of historical wells;
developing a well construction model using the corpus of historical well construction data;
acquiring real-time well construction data during a well construction operation;
applying the well construction model to the real-time well construction data to (i) identify well construction inefficiencies and (ii) generate changes to a well construction parameter; and
outputting a command to update the well construction operation using the changes to the well construction parameter.

### Claim 9 (depends on 8)

The system of claim 8, wherein the operations further comprise:
identifying a technical limit of well construction timing using the corpus of historical well construction data, wherein the well construction model is further developed using the technical limit of well construction timing.

### Claim 10 (depends on 9)

The system of claim 9, wherein the operations further comprise:
updating the well construction model using the real-time well construction data and the changes to the well construction parameter.

### Claim 11 (depends on 9)

The system of claim 9, wherein the well construction parameter comprises drilling parameters of the well construction operation.

### Claim 12 (depends on 9)

The system of claim 9, wherein applying the well construction model to the real-time well construction data further identifies causes of the well construction inefficiencies of the well construction operation.

### Claim 13 (depends on 9)

The system of claim 9, wherein developing the well construction model comprises training a machine-learning model using the corpus of historical well construction data.

### Claim 14 (depends on 9)

The system of claim 9, further comprising:
updating the corpus of historical well construction data to remove a set of well construction data that is not compatible with a well system constructed by the well construction operation.

### Claim 15

A non-transitory computer-readable medium that includes instructions that are executable by a processing device to perform operations comprising:
acquiring a corpus of historical well construction data associated with a set of historical wells;
developing a well construction model using the corpus of historical well construction data;
acquiring real-time well construction data during a well construction operation;
applying the well construction model to the real-time well construction data to (i) identify well construction inefficiencies and (ii) generate changes to a well construction parameter; and
outputting a command to update the well construction operation using the changes to the well construction parameter.

### Claim 16 (depends on 15)

The non-transitory computer-readable medium of claim 15, the operations further comprising:
identifying a technical limit of well construction timing using the corpus of historical well construction data, wherein the well construction model is further developed using the technical limit of well construction timing.

### Claim 17 (depends on 15)

The non-transitory computer-readable medium of claim 15, the operations further comprising:
updating the well construction model using the real-time well construction data and the changes to the well construction parameter.

### Claim 18 (depends on 15)

The non-transitory computer-readable medium of claim 15, wherein the well construction parameter comprises drilling parameters of the well construction operation.

### Claim 19 (depends on 15)

The non-transitory computer-readable medium of claim 15, wherein applying the well construction model to the real-time well construction data further identifies causes of the well construction inefficiencies of the well construction operation.

### Claim 20 (depends on 15)

The non-transitory computer-readable medium of claim 15, wherein developing the well construction model comprises training a machine-learning model using the corpus of historical well construction data.