# US 2023/0058165 A1 · Power headroom report for multiple uplink carriers

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0058165 A1
- Document ID: US20230058165A1
- Status: Published application
- Kind: A1
- Application number: 17/982,422
- Filed: 2022-11-07
- Published: 2023-02-23
- Earliest claimed: 2018-04-05
- Assignees: Lenovo (Singapore) Pte. Ltd.
- Applicants: Lenovo (Singapore) PTE. LTD.
- Inventors: Ebrahim MolavianJazi; Joachim Loehr; Hyejung Jung; Vijay Nangia; Prateek Basu Mallick
- Web page: https://patentgrep.com/patent/US20230058165A1

## CPC

- H04W 52/146: {Uplink power control}
- H04W 52/08: Closed loop power control
- H04W 52/281: {taking into account user or data type priority}
- H04W 52/365: {Power headroom reporting}
- H04W 52/367: {Power values between minimum and maximum limits, e.g. dynamic range}
- H04W 52/44: in connection with interruption of transmission
- H04W 52/50: at the moment of starting communication in a multiple access environment
- H04W 52/346: {distributing total power among users or channels}
- H04W 74/002: {Transmission of channel access control information}
- H04W 74/0833: Random access procedures, e.g. with 4-step access
- H04W 76/27: Transitions between radio resource control [RRC] states
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

Apparatuses, methods, and systems are disclosed for transmission power prioritization. One apparatus includes a processor coupled to a memory and a transceiver, where the processor is configured to identify a first pending transmission corresponding to a non-supplementary uplink carrier; identify a second pending transmission corresponding to a supplementary uplink carrier, wherein the first and second pending transmissions at least partially overlap in time; prioritize power allocation to the non-supplementary uplink carrier in response to the non-supplementary uplink carrier being configured to transmit a PUCCH; prioritize power allocation to the supplementary uplink carrier in response to the supplementary uplink carrier being configured to transmit the PUCCH; and prioritize power allocation to the non-supplementary uplink carrier in response to neither the supplementary uplink carrier nor the non-supplementary uplink carrier being configured to transmit the PUCCH.

## Claims

### Claim 1

An apparatus comprising:
a processor; and
a memory coupled with the processor, the processor configured to:
determine that the apparatus is in a power limited state;
identify a first transmission corresponding to a non-supplementary uplink carrier;
identify a second transmission corresponding to a supplementary uplink carrier, wherein the first and second transmissions at least partially overlap in time;
prioritize power allocation to a transmission on the non-supplementary uplink carrier in response to the non-supplementary uplink carrier being configured to transmit a Physical Uplink Control Channel (“PUCCH”), and in response to the apparatus being in the power limited state;
prioritize power allocation to a transmission on the supplementary uplink carrier in response to the supplementary uplink carrier being configured to transmit the PUCCH, and in response to the apparatus being in the power limited state; and
prioritize power allocation to a transmission on the non-supplementary uplink carrier in response to neither the supplementary uplink carrier nor the non-supplementary uplink carrier being configured to transmit the PUCCH, and in response to the apparatus being in the power limited state.

### Claim 2 (depends on 1)

The apparatus of claim 1, wherein the first and second pending transmissions correspond to a same priority level.

### Claim 3 (depends on 1)

The apparatus of claim 1, wherein the first and second pending transmissions correspond to Sounding Reference Signal (“SRS”) transmission having a same time-domain periodicity.

### Claim 4 (depends on 1)

The apparatus of claim 1, wherein the first and second pending transmissions correspond to Physical Uplink Shared Channel (“PUSCH”) transmissions without Uplink Control Information (“UCI”).

### Claim 5 (depends on 1)

The apparatus of claim 1, wherein a location of PUCCH in the first or second transmissions is semi-statically configured by higher layer signaling.

### Claim 6 (depends on 1)

The apparatus of claim 1, wherein to prioritize power allocation to the supplementary uplink carrier, the processor is configured to cause the apparatus to reduce power of transmissions on the non-supplementary uplink carrier, wherein a total User Equipment (“UE”) transmission power is less than or equal to a configured maximum transmit power.

### Claim 7 (depends on 1)

The apparatus of claim 1, wherein to prioritize power allocation to the supplementary uplink carrier, the processor is configured to cause the apparatus to drop one or more transmissions on the non-supplementary uplink carrier.

### Claim 8 (depends on 1)

The apparatus of claim 1, wherein to prioritize power allocation to the non-supplementary uplink carrier, the processor is configured to cause the apparatus to reduce power of transmissions on the supplementary uplink carrier, wherein a total User Equipment (“UE”) transmission power is less than or equal to a configured maximum transmit power.

### Claim 9 (depends on 1)

The apparatus of claim 1, wherein to prioritize power allocation to the non-supplementary uplink carrier, the processor is configured to cause the apparatus to drop one or more transmissions on the supplementary uplink carrier.

### Claim 10

A method of a user equipment (“UE”), the method comprising:
determining that the UE is in a power limited state;
identifying a first transmission corresponding to a non-supplementary uplink carrier;
identifying a second transmission corresponding to a supplementary uplink carrier, wherein the first and second transmissions at least partially overlap in time;
prioritizing power allocation to the first transmission corresponding to the non-supplementary uplink carrier in response to the non-supplementary uplink carrier being configured to transmit a Physical Uplink Control Channel (“PUCCH”), and in response to the apparatus being in the power limited state;
prioritizing power allocation to the second transmission corresponding to the supplementary uplink carrier in response to the supplementary uplink carrier being configured to transmit the PUCCH, and in response to the apparatus being in the power limited state; and
prioritizing power allocation to the first transmission corresponding to the non-supplementary uplink carrier in response to neither the supplementary uplink carrier nor the non-supplementary uplink carrier being configured to transmit the PUCCH, and in response to the apparatus being in the power limited state.

### Claim 11 (depends on 10)

The method of claim 10, wherein the first and second transmissions correspond to a same priority level.

### Claim 12 (depends on 10)

The method of claim 10, wherein the first and second transmissions correspond to Sounding Reference Signal (“SRS”) transmission having a same time-domain periodicity.

### Claim 13 (depends on 10)

The method of claim 10, wherein the first and second transmissions correspond to Physical Uplink Shared Channel (“PUSCH”) transmissions without Uplink Control Information (“UCI”).

### Claim 14 (depends on 10)

The method of claim 10, wherein a location of PUCCH in the first or second transmissions is semi-statically configured by higher layer signaling.

### Claim 15 (depends on 10)

The method of claim 10, wherein prioritizing power allocation to the supplementary uplink carrier comprises reducing power of transmissions on the non-supplementary uplink carrier, wherein a total UE transmission power is less than or equal to a configured maximum transmit power.

### Claim 16 (depends on 10)

The method of claim 10, wherein prioritizing power allocation to the supplementary uplink carrier comprises dropping one or more transmissions on the non-supplementary uplink carrier.

### Claim 17 (depends on 10)

The method of claim 10, wherein prioritizing power allocation to the supplementary uplink carrier comprises reducing power of transmissions on the supplementary uplink carrier, wherein a total UE transmission power is less than or equal to a configured maximum transmit power.

### Claim 18 (depends on 10)

The method of claim 10, wherein prioritizing power allocation to the supplementary uplink carrier comprise dropping one or more transmissions on the supplementary uplink carrier.

### Claim 19 (depends on 1)

The apparatus of claim 1, wherein the apparatus comprises a User Equipment (“UE”), wherein the processor is configured to determine that the apparatus is in the power limited state in response to a ULE transmit power exceeding a maximum allowed UE transmission power.

### Claim 20 (depends on 10)

The method of claim 10, wherein determining that the UE is in the power limited state comprises determining that a ULE transmit power exceeds a maximum allowed UE transmission power.
