# US 2023/0056711 A1 · Power converter with adaptive active clamp

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0056711 A1
- Document ID: US20230056711A1
- Status: Published application
- Kind: A1
- Application number: 17/445,719
- Filed: 2021-08-23
- Published: 2023-02-23
- Earliest claimed: 2021-08-23
- Assignees: Dialog Semiconductor GmbH
- Applicants: Dialog Semiconductor Inc.
- Inventors: Xiaoyong ZHANG
- Web page: https://patentgrep.com/patent/US20230056711A1

## CPC

- H02M 3/33507: {with automatic control of the output voltage or current, e.g. flyback converters (H02M3/33561, H02M3/33569 take precedence)}
- H02M 1/083: {for the ignition at the zero crossing of the voltage or the current}
- H02M 1/32: Means for protecting converters other than automatic disconnection
- H02M 1/346: {Passive non-dissipative snubbers}
- H02M 3/33569: {having several active switching elements (H02M3/3353 takes precedence)}
- Y02B 70/10: Technologies improving the efficiency by using switched-mode power supplies [SMPS], i.e. efficient power electronics conversion e.g. power factor correction or reduction of losses in power supplies or efficient standby modes
- H02M: APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF (transformers H01F; dynamo-electric converters H02K47/00; controlling transformers, reactors or choke coils, control or regulation of electric motors, generators or dynamo-electric converters H02P)
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS

## Abstract

An active-clamp flyback converter is provided with improved active-clamp switch control that switches on an active-clamp switch at an active-clamp switch on-time that equals a power switch on-time minus a peak charge time for an active-clamp capacitor. The peak charge time is the duration between the switching off of the power switch transistor and when the charging current through the active-clamp capacitor falls to zero. The controller measures this peak charge time following the switching off of the power switch transistor and then applies it to the subsequent switching on of the active-clamp switch so that the active-clamp switch is switched on at the power switch on-time minus the peak charge time.

## Claims

### Claim 1

An active-clamp flyback converter, comprising:
a power switch;
an active-clamp switch;
an active-clamp capacitor in series with the active-clamp switch; and
an active-clamp controller configured to measure a peak charge time of the active-clamp capacitor and to switch on the active-clamp switch at a time equaling a difference between a turn-on time for the power switch and the peak charge time.

### Claim 2 (depends on 1)

The active-clamp flyback converter of claim 1, wherein the active-clamp controller is configured to measure the peak charge time of the active-clamp capacitor at a startup of the active-clamp flyback converter.

### Claim 3 (depends on 1)

The active-clamp flyback converter of claim 1, wherein the active-clamp switch is a PMOS transistor having a source coupled to a first plate of the active-clamp capacitor.

### Claim 4 (depends on 3)

The active-clamp flyback converter of claim 3, wherein the power switch is an NMOS transistor having a drain coupled to a primary winding of a transformer, and wherein a second plate of the active-clamp capacitor is coupled to the drain of the NMOS transistor.

### Claim 5 (depends on 3)

The active-clamp flyback converter of claim 3, wherein the PMOS transistor includes a body diode configured to conduct a charging current following an off-time of the power switch.

### Claim 6 (depends on 1)

The active-clamp flyback converter of claim 1, wherein the active-clamp controller is further configured to switch on the active-clamp switch for the peak charge time in response to a switch off of the power switch.

### Claim 7 (depends on 3)

The active-clamp flyback converter of claim 3, wherein a drain of the PMOS transistor is coupled to ground through an active-clamp resistor.

### Claim 8 (depends on 7)

The active-clamp flyback converter of claim 7, wherein the active-clamp controller includes:
a comparator configured to compare a voltage across the active-clamp resistor to a threshold voltage; and
a counter configured to provide a count representing the peak charge time, the counter being further configured to stop a counting of the count in response to an output signal from the comparator indicating that the voltage across the active-clamp resistor equals the threshold voltage.

### Claim 9 (depends on 8)

The active-clamp flyback converter of claim 8, wherein the threshold voltage is ground.

### Claim 10 (depends on 8)

The active-clamp flyback converter of claim 8, wherein the counter is further configured to begin a counting of the count responsive to the power switch cycling off.

### Claim 11

A method of operation for an active-clamp flyback converter, comprising:
measuring a peak charge time period during which an active-clamp capacitor charges to a peak charge in response to a switching off of a power switch transistor;
during an off-time of the power switch transistor after the active-clamp capacitor is charged to the peak charge, switching on an active-clamp switch transistor at an active-clamp on-time that equals a difference between a subsequent power switch on-time of the power switch transistor and the peak charge time period;
switching off the active-clamp switch transistor at an active-clamp off-time that equals the active-clamp on-time plus the peak charge time period; and
switching on the power switch transistor at the subsequent power switch on-time.

### Claim 12 (depends on 11)

The method of claim 11, wherein charging the active-clamp capacitor to the peak charge over the peak charge time period comprises conducting a charging current through a body diode of the active-clamp switch transistor while the active-clamp switch transistor is off

### Claim 13 (depends on 11)

The method of claim 11, wherein charging the active-clamp capacitor to the peak charge over the peak charge time period comprises switching on the active-clamp switch transistor for the peak charge time period.

### Claim 14

(canceled)

### Claim 15 (depends on 11)

The method of claim 11, wherein measuring the peak charge time period comprises determining when a charging current stops conducting through the active-clamp capacitor.

### Claim 16 (depends on 15)

The method of claim 15, wherein determining when the charging current stops conducting comprises comparing a voltage across an active-clamp resistor to a threshold voltage.

### Claim 17 (depends on 16)

The method of claim 16, wherein the threshold voltage is approximately zero volts.

### Claim 18

An active-clamp controller for an active-clamp flyback converter, comprising:
a comparator configured to compare a voltage across an active-clamp resistor to a threshold voltage;
a counter configured to provide a count representing a peak charge time of an active-clamp capacitor, the counter being further configured to stop a counting of the count in response to an output signal from the comparator indicating that the voltage across the active-clamp resistor equals the threshold voltage; and
an active-clamp switch transistor gate driver configured to switch on an active-clamp switch transistor at an active-clamp on-time that equals an on-time of a power switch transistor minus the peak charge time.

### Claim 19 (depends on 18)

The active-clamp controller of claim 18, wherein the counter is further configured to begin the counting of the count responsive to a cycling on of the power switch transistor at a startup of the active-clamp flyback converter.

### Claim 20 (depends on 19)

The active-clamp controller of claim 19, wherein the counter is configured to increment the count responsive to cycles of a clock signal.
