# US 2023/0056663 A1 · Refrigeration cycle system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0056663 A1
- Document ID: US20230056663A1
- Status: Published application
- Kind: A1
- Application number: 17/981,268
- Filed: 2022-11-04
- Published: 2023-02-23
- Earliest claimed: 2020-05-08
- Assignees: Daikin Industries, Ltd.
- Applicants: Daikin Industries, Ltd.
- Inventors: Yoshiki YAMANOI; Yuuta IYOSHI
- Web page: https://patentgrep.com/patent/US20230056663A1

## CPC

- F25B 7/00: Compression machines, plants or systems, with cascade operation, i.e. with two or more circuits, the heat from the condenser of one circuit being absorbed by the evaporator of the next circuit (F25B9/00 takes precedence)
- F25B 9/10: with several cooling stages
- F25B 9/008: {the refrigerant being carbon dioxide}
- F25B 13/00: Compression machines, plants or systems, with reversible cycle (defrosting cycles F25B47/02)
- F25B 49/02: for compression type machines, plants or systems
- F25B 49/022: {Compressor control arrangements}
- F25B 2313/007: three pipes connecting the outdoor side to the indoor side with multiple indoor units
- F25B 2313/0231: with simultaneous cooling and heating
- F25B 2313/02791: using shut-off valves
- F25B 2313/0314: Temperature sensors near the indoor heat exchanger
- F25B 2500/26: characterised by the startup of the refrigeration cycle
- F25B 2600/0261: external to the compressor
- F25B 2600/2501: Bypass valves
- F25B 2700/1931: Discharge pressures
- F25B 2700/2104: of an indoor room or compartment
- F25B 2700/2106: of fresh outdoor air
- F25B 2700/21152: at the discharge side of the compressor
- F25B: REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS

## Abstract

A refrigeration cycle system includes a first cycle and a second cycle. The first cycle is connected with a first compressor, a cascade heat exchanger, a first expansion unit, and a first heat exchanger, and includes a first flow path that connects the first compressor to the cascade heat exchanger, a second flow path that connects the cascade heat exchanger to the first expansion unit, a third flow path that connects the first heat exchanger to the first compressor, and a bypass flow path that connects at least one of the first flow path and the second flow path to the third flow path. The second cycle includes the cascade heat exchanger. In a case of using the cascade heat exchanger as a radiator of the first cycle and a heat sink of the second cycle, the first compressor of the first cycle is started after a flow of a heat medium generates in the cascade heat exchanger in the second cycle.

## Claims

### Claim 1

A refrigeration cycle system comprising:
a first cycle; and
a second cycle,
wherein
the first cycle is connected with a first compressor, a cascade heat exchanger, a first expansion unit, and a first heat exchanger, has a carbon dioxide refrigerant circulating through the first cycle, and includes a first flow path that connects the first compressor to the cascade heat exchanger, a second flow path that connects the cascade heat exchanger to the first expansion unit, a third flow path that connects the first heat exchanger to the first compressor, and a bypass flow path that connects at least one of the first flow path and the second flow path to the third flow path,
the second cycle includes the cascade heat exchanger, and has a heat medium different from the carbon dioxide refrigerant circulating through the second cycle, and
in a case of using the cascade heat exchanger as a radiator of the first cycle and a heat sink of the second cycle, the first compressor of the first cycle is started after a flow of the heat medium generates in the cascade heat exchanger in the second cycle.

### Claim 2 (depends on 1)

The refrigeration cycle system according to claim 1, wherein
the second cycle includes a second compressor, and
in the case of using the cascade heat exchanger as the radiator of the first cycle and the heat sink of the second cycle, the first compressor is started after the second compressor is started.

### Claim 3 (depends on 1)

The refrigeration cycle system according to claim 1, further comprising a sensor that detects a refrigerant pressure or a refrigerant temperature in the third flow path,
wherein in the case of using the cascade heat exchanger as the radiator of the first cycle and the heat sink of the second cycle, the first compressor is started when a detection value of the sensor is a predetermined value or less.

### Claim 4 (depends on 1)

The refrigeration cycle system according to claim 1, further comprising a sensor that detects a refrigerant pressure or a refrigerant temperature in the third flow path,
wherein in the case of using the cascade heat exchanger as the radiator of the first cycle and the heat sink of the second cycle, the first compressor is started when either of a detection value of the sensor is a predetermined value or less, and a predetermined time has elapsed after the heat medium starts to flow in the cascade heat exchanger in the second cycle, is satisfied.

### Claim 5 (depends on 1)

The refrigeration cycle system according to claim 1, wherein the bypass flow path includes a decompression mechanism that decompresses the refrigerant.

### Claim 6 (depends on 1)

The refrigeration cycle system according to claim 1, wherein
the bypass flow path includes an on-off valve that can be opened and closed, and
in the case of using the cascade heat exchanger as the radiator of the first cycle and the heat sink of the second cycle, the on-off valve is in an open state from after the heat medium starts to flow in the cascade heat exchanger in the second cycle until the first compressor is started, and the on-off valve is switched to a close state when or after the first compressor is started.

### Claim 7 (depends on 1)

The refrigeration cycle system according to claim 1, wherein
the first cycle further includes a switching mechanism,
the switching mechanism switches between a state of sending the refrigerant discharged from the first compressor to the cascade heat exchanger and a state of sending the refrigerant discharged from the first compressor to the first heat exchanger,
the third flow path includes a suction flow path that connects the switching mechanism to the first compressor,
the bypass flow path connects at least one of the first flow path and the second flow path to the suction flow path, and
in a case where the switching mechanism is in the state of sending the refrigerant discharged from the first compressor to the cascade heat exchanger, the cascade heat exchanger is started to operate as the radiator of the first cycle and as the heat sink of the second cycle.

### Claim 8 (depends on 2)

The refrigeration cycle system according to claim 2, further comprising a sensor that detects a refrigerant pressure or a refrigerant temperature in the third flow path,
wherein in the case of using the cascade heat exchanger as the radiator of the first cycle and the heat sink of the second cycle, the first compressor is started when a detection value of the sensor is a predetermined value or less.

### Claim 9 (depends on 2)

The refrigeration cycle system according to claim 2, further comprising a sensor that detects a refrigerant pressure or a refrigerant temperature in the third flow path,
wherein in the case of using the cascade heat exchanger as the radiator of the first cycle and the heat sink of the second cycle, the first compressor is started when either of a detection value of the sensor is a predetermined value or less, and a predetermined time has elapsed after the heat medium starts to flow in the cascade heat exchanger in the second cycle, is satisfied.

### Claim 10 (depends on 2)

The refrigeration cycle system according to claim 2, wherein the bypass flow path includes a decompression mechanism that decompresses the refrigerant.

### Claim 11 (depends on 3)

The refrigeration cycle system according to claim 3, wherein the bypass flow path includes a decompression mechanism that decompresses the refrigerant.

### Claim 12 (depends on 4)

The refrigeration cycle system according to claim 4, wherein the bypass flow path includes a decompression mechanism that decompresses the refrigerant.

### Claim 13 (depends on 2)

The refrigeration cycle system according to claim 2, wherein
the bypass flow path includes an on-off valve that can be opened and closed, and
in the case of using the cascade heat exchanger as the radiator of the first cycle and the heat sink of the second cycle, the on-off valve is in an open state from after the heat medium starts to flow in the cascade heat exchanger in the second cycle until the first compressor is started, and the on-off valve is switched to a close state when or after the first compressor is started.

### Claim 14 (depends on 3)

The refrigeration cycle system according to claim 3, wherein
the bypass flow path includes an on-off valve that can be opened and closed, and
in the case of using the cascade heat exchanger as the radiator of the first cycle and the heat sink of the second cycle, the on-off valve is in an open state from after the heat medium starts to flow in the cascade heat exchanger in the second cycle until the first compressor is started, and the on-off valve is switched to a close state when or after the first compressor is started.

### Claim 15 (depends on 4)

The refrigeration cycle system according to claim 4, wherein
the bypass flow path includes an on-off valve that can be opened and closed, and
in the case of using the cascade heat exchanger as the radiator of the first cycle and the heat sink of the second cycle, the on-off valve is in an open state from after the heat medium starts to flow in the cascade heat exchanger in the second cycle until the first compressor is started, and the on-off valve is switched to a close state when or after the first compressor is started.

### Claim 16 (depends on 5)

The refrigeration cycle system according to claim 5, wherein
the bypass flow path includes an on-off valve that can be opened and closed, and
in the case of using the cascade heat exchanger as the radiator of the first cycle and the heat sink of the second cycle, the on-off valve is in an open state from after the heat medium starts to flow in the cascade heat exchanger in the second cycle until the first compressor is started, and the on-off valve is switched to a close state when or after the first compressor is started.

### Claim 17 (depends on 2)

The refrigeration cycle system according to claim 2, wherein
the first cycle further includes a switching mechanism,
the switching mechanism switches between a state of sending the refrigerant discharged from the first compressor to the cascade heat exchanger and a state of sending the refrigerant discharged from the first compressor to the first heat exchanger,
the third flow path includes a suction flow path that connects the switching mechanism to the first compressor,
the bypass flow path connects at least one of the first flow path and the second flow path to the suction flow path, and
in a case where the switching mechanism is in the state of sending the refrigerant discharged from the first compressor to the cascade heat exchanger, the cascade heat exchanger is started to operate as the radiator of the first cycle and as the heat sink of the second cycle.

### Claim 18 (depends on 3)

The refrigeration cycle system according to claim 3, wherein
the first cycle further includes a switching mechanism,
the switching mechanism switches between a state of sending the refrigerant discharged from the first compressor to the cascade heat exchanger and a state of sending the refrigerant discharged from the first compressor to the first heat exchanger,
the third flow path includes a suction flow path that connects the switching mechanism to the first compressor,
the bypass flow path connects at least one of the first flow path and the second flow path to the suction flow path, and
in a case where the switching mechanism is in the state of sending the refrigerant discharged from the first compressor to the cascade heat exchanger, the cascade heat exchanger is started to operate as the radiator of the first cycle and as the heat sink of the second cycle.

### Claim 19 (depends on 4)

The refrigeration cycle system according to claim 4, wherein
the first cycle further includes a switching mechanism,
the switching mechanism switches between a state of sending the refrigerant discharged from the first compressor to the cascade heat exchanger and a state of sending the refrigerant discharged from the first compressor to the first heat exchanger,
the third flow path includes a suction flow path that connects the switching mechanism to the first compressor,
the bypass flow path connects at least one of the first flow path and the second flow path to the suction flow path, and
in a case where the switching mechanism is in the state of sending the refrigerant discharged from the first compressor to the cascade heat exchanger, the cascade heat exchanger is started to operate as the radiator of the first cycle and as the heat sink of the second cycle.

### Claim 20 (depends on 5)

The refrigeration cycle system according to claim 5, wherein
the first cycle further includes a switching mechanism,
the switching mechanism switches between a state of sending the refrigerant discharged from the first compressor to the cascade heat exchanger and a state of sending the refrigerant discharged from the first compressor to the first heat exchanger,
the third flow path includes a suction flow path that connects the switching mechanism to the first compressor,
the bypass flow path connects at least one of the first flow path and the second flow path to the suction flow path, and
in a case where the switching mechanism is in the state of sending the refrigerant discharged from the first compressor to the cascade heat exchanger, the cascade heat exchanger is started to operate as the radiator of the first cycle and as the heat sink of the second cycle.
