# US 2023/0055168 A1 · Project management system, method of operating project management system, and non-transitory computer-readable medium

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0055168 A1
- Document ID: US20230055168A1
- Status: Published application
- Kind: A1
- Application number: 17/900,660
- Filed: 2022-08-31
- Published: 2023-02-23
- Earliest claimed: 2020-03-10
- Assignees: Management Solutions Co., Ltd.
- Applicants: Management Solutions Co., Ltd.
- Inventors: Akira KANEKO
- Web page: https://patentgrep.com/patent/US20230055168A1

## CPC

- G06Q 10/103: {Workflow collaboration or project management}
- G06Q 10/06: Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q 10/063114: {Status monitoring or status determination for a person or group}
- G06T 11/26: Drawing of charts or graphs
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06T: IMAGE DATA PROCESSING OR GENERATION, IN GENERAL

## Abstract

Provided is a project management system including a process identifying information holding unit that holds process identifying information for identifying processes of a project, an influencing circumstantial situation information holding unit that holds a plurality of pieces of influencing circumstantial situation information that is information indicating an influencing circumstance being a circumstance influencing progress of the project recognized in the processes of the project, a per-process influencing circumstantial situation information input reception unit that receives per-process influencing circumstantial situation information that is information associating the influencing circumstantial situation information being held and the process identifying information of the process in which the circumstantial situation indicated by the influencing circumstantial situation information is recognized, and a graphical output unit that outputs graphically the per-process influencing circumstantial situation information.

## Claims

### Claim 1

A project management system comprising:
a memory;
a processor coupled to the memory and the processor configured to:
hold executor identification information that identifies an executor of a project;
hold a plurality of types of influencing circumstance identification information that identifies an influencing circumstance which is a circumstance that influences the progress of the project recognized in a phase of the project;
hold status identification information that identifies a status which is information indicating a status of resolution to an influencing circumstance identified by the influencing circumstance identification information;
hold execution manager identification information that identifies an execution manager as an executor who is responsible for executing a workaround to avoid an adverse influence on the project due to the influencing circumstance;
hold phase identification information that identifies a phase of the project;
receive an input of influencing circumstance situation information which is information that associates, with each other, the held influencing circumstance identification information, the phase identification information of the phase in which the influencing circumstance identified by the influencing circumstance identification information is recognized, recognized timing thereof, the execution manager identification information that identifies the execution manager as the executor who is responsible for executing the workaround to avoid the adverse influence on the project due to the influencing circumstance, an influence degree to which the influencing circumstance influences the project, the status identification information of the status which is information indicating the status of resolution to the influencing circumstance;
hold the received influencing circumstance situation information;
output the held influencing circumstance situation information; and
graphically output a graph with one axis as timing and another axis as the recognized number of pieces of influencing circumstance situation information using the held influencing circumstance situation information.

### Claim 2 (depends on 1)

The project management system according to claim 1, wherein the processor is further configured to graphically output a graph with the one axis as the timing and the another axis as the number of recognitions per influence degree of the influencing circumstance situation information, using received per-phase influencing circumstance situation information.

### Claim 3 (depends on 1)

The project management system according to claim 1, wherein the processor is further configured to graphically outputting a graph with the one axis as the timing and the another axis as the number of cases per status of the influencing circumstance situation information, using received per-phase influencing circumstance situation information.

### Claim 4 (depends on 1)

The project management system according to claim 1, wherein the processor is further configured to display a graphical output per phase identified by the phase identification information included in the influencing circumstance situation information.

### Claim 5 (depends on 1)

The project management system according to claim 1, wherein the processor is further configured to display a graphical output per execution manager identified by the execution manager identification information included in the influencing circumstance situation information.

### Claim 6

A project management system comprising:
a memory;
a processor coupled to the memory and the processor configured to:
hold executor identification information that identifies an executor of a proj ect;
hold a plurality of types of influencing circumstance identification information that identifies an influencing circumstance which is a circumstance that influences the progress of the project recognized in a phase of the project;
hold status identification information that identifies a status which is information indicating a status of resolution to an influencing circumstance identified by the influencing circumstance identification information;
hold execution manager identification information that identifies an execution manager as an executor who is responsible for executing a workaround to avoid an adverse influence on the project due to the influencing circumstance;
hold phase identification information that identifies a phase of the project;
receive an input of influencing circumstance situation information which is information that associates, with each other, the held influencing circumstance identification information, the phase identification information of the phase in which the influencing circumstance identified by the influencing circumstance identification information is recognized, recognized timing thereof, the execution manager identification information that identifies the execution manager as the executor who is responsible for executing the workaround to avoid the adverse influence on the project due to the influencing circumstance, an influence degree to which the influencing circumstance influences the project, the status identification information of the status which is information indicating the status of resolution to the influencing circumstance;
hold the received influencing circumstance situation information;
output the held influencing circumstance situation information; and
output a pie chart indicating the number of pieces of influencing circumstance situation information per status as a ratio by setting the total number of pieces of held influencing circumstance situation information as a whole.

### Claim 7 (depends on 6)

The project management system according to claim 6, wherein the processor is further configured to output a pie chart indicating the number of pieces of influencing circumstance situation information per influence degree as a ratio by setting the total number of pieces of held influencing circumstance situation information as a whole.

### Claim 8 (depends on 6)

The project management system according to claim 6, wherein the processor is further configured to output a pie chart indicating the number of pieces of influencing circumstance situation information per occurrence phase which is an occurred phase as a ratio by setting the total number of pieces of held influencing circumstance situation information as a whole.

### Claim 9 (depends on 6)

The project management system according to claim 6, wherein the processor is further configured to display, with a pie chart, an influence degree of the held influencing circumstance situation information per execution manager identified by the execution manager identification information.

### Claim 10 (depends on 6)

The project management system according to claim 6, wherein the processor is further configured to display, with a pie chart, an influence degree of the held influencing circumstance situation information per status identified by the status identification information.

### Claim 11

A method of operating a project management system executed by a computer to execute a process, the process comprising:
holding executor identification information that identifies an executor of a project;
holding a plurality of types of influencing circumstance identification information that identifies an influencing circumstance which is a circumstance that influences the progress of the project recognized in a phase of the project;
holding status identification information that identifies a status which is information indicating a status of resolution to an influencing circumstance identified by the influencing circumstance identification information;
holding execution manager identification information that identifies an execution manager as an executor who is responsible for executing a workaround to avoid an adverse influence on the project due to the influencing circumstance;
holding phase identification information that identifies a phase of the project;
receiving an input of influencing circumstance situation information which is information that associates, with each other, the held influencing circumstance identification information, the phase identification information of the phase in which the influencing circumstance identified by the influencing circumstance identification information is recognized, recognized timing thereof, the execution manager identification information that identifies the execution manager as the executor who is responsible for executing the workaround to avoid the adverse influence on the project due to the influencing circumstance, an influence degree to which the influencing circumstance influences the project, the status identification information of the status which is information indicating the status of resolution to the influencing circumstance;
holding the received influencing circumstance situation information;
outputting the held influencing circumstance situation information; and
graphically outputting a graph with one axis as timing and another axis as the recognized number of pieces of influencing circumstance situation information using the held influencing circumstance situation information.

### Claim 12 (depends on 11)

The method of operating the project management system according to claim 11, wherein
the graphically outputting the graph is further configured to graphically output a graph with the one axis as the timing and the another axis as the number of recognitions per influence degree of the influencing circumstance situation information, using received per-phase influencing circumstance situation information.

### Claim 13 (depends on 11)

The method of operating the project management system according to claim 11, wherein
the graphically outputting the graph is further configured to graphically outputting a graph with the one axis as the timing and the another axis as the number of cases per status of the influencing circumstance situation information, using received per-phase influencing circumstance situation information.

### Claim 14 (depends on 11)

The method of operating the project management system according to claim 11, wherein
the graphically outputting the graph is further configured to display a graphical output per phase identified by the phase identification information included in the influencing circumstance situation information.

### Claim 15 (depends on 11)

The method of operating the project management system according to claim 11, wherein
the graphically outputting the graph is further configured to display a graphical output per execution manager identified by the execution manager identification information included in the influencing circumstance situation information.

### Claim 16

A method of operating a project management system executed by a computer to execute a process, the process comprising:
holding executor identification information that identifies an executor of a proj ect;
holding a plurality of types of influencing circumstance identification information that identifies an influencing circumstance which is a circumstance that influences the progress of the project recognized in a phase of the project;
holding status identification information that identifies a status which is information indicating a status of resolution to an influencing circumstance identified by the influencing circumstance identification information;
holding execution manager identification information that identifies an execution manager as an executor who is responsible for executing a workaround to avoid an adverse influence on the project due to the influencing circumstance;
holding phase identification information that identifies a phase of the project;
receiving an input of influencing circumstance situation information which is information that associates, with each other, the held influencing circumstance identification information, the phase identification information of the phase in which the influencing circumstance identified by the influencing circumstance identification information is recognized, recognized timing thereof, the execution manager identification information that identifies the execution manager as the executor who is responsible for executing the workaround to avoid the adverse influence on the project due to the influencing circumstance, an influence degree to which the influencing circumstance influences the project, the status identification information of the status which is information indicating the status of resolution to the influencing circumstance;
holding the received influencing circumstance situation information;
outputting the held influencing circumstance situation information; and
outputting a pie chart indicating the number of pieces of influencing circumstance situation information per status as a ratio by setting the total number of pieces of held influencing circumstance situation information as a whole.

### Claim 17 (depends on 16)

The method of operating the project management system according to claim 16, wherein
the outputting the pie chart is further configured to output a pie chart indicating the number of pieces of influencing circumstance situation information per influence degree as a ratio by setting the total number of pieces of held influencing circumstance situation information as a whole.

### Claim 18 (depends on 16)

The method of operating the project management system according to claim 16, wherein
the outputting the pie chart is further configured to output a pie chart indicating the number of pieces of influencing circumstance situation information per occurrence phase which is an occurred phase as a ratio by setting the total number of pieces of held influencing circumstance situation information as a whole.

### Claim 19 (depends on 16)

The method of operating the project management system according to claim 16, wherein
the outputting the pie chart is further configured to display, with a pie chart, an influence degree of the held influencing circumstance situation information per execution manager identified by the execution manager identification information.

### Claim 20 (depends on 16)

The method of operating the project management system according to claim 16, wherein
the outputting the pie chart is further configured to display, with a pie chart, an influence degree of the held influencing circumstance situation information per status identified by the status identification information.

### Claim 21

A non-transitory computer-readable medium having stored therein a program for causing a computer to execute a process, the process comprising:
holding executor identification information that identifies an executor of a project;
holding a plurality of types of influencing circumstance identification information that identifies an influencing circumstance which is a circumstance that influences the progress of the project recognized in a phase of the project;
holding status identification information that identifies a status which is information indicating a status of resolution to an influencing circumstance identified by the influencing circumstance identification information;
holding execution manager identification information that identifies an execution manager as an executor who is responsible for executing a workaround to avoid an adverse influence on the project due to the influencing circumstance;
holding phase identification information that identifies a phase of the project;
receiving an input of influencing circumstance situation information which is information that associates, with each other, the held influencing circumstance identification information, the phase identification information of the phase in which the influencing circumstance identified by the influencing circumstance identification information is recognized, recognized timing thereof, the execution manager identification information that identifies the execution manager as the executor who is responsible for executing the workaround to avoid the adverse influence on the project due to the influencing circumstance, an influence degree to which the influencing circumstance influences the project, the status identification information of the status which is information indicating the status of resolution to the influencing circumstance;
holding the received influencing circumstance situation information;
outputting the held influencing circumstance situation information; and
graphically outputting a graph with one axis as timing and another axis as the recognized number of pieces of influencing circumstance situation information using the held influencing circumstance situation information.

### Claim 22 (depends on 21)

The non-transitory computer-readable medium according to claim 21, wherein
the graphically outputting the graph is further configured to graphically output a graph with the one axis as the timing and the another axis as the number of recognitions per influence degree of the influencing circumstance situation information, using received per-phase influencing circumstance situation information.

### Claim 23 (depends on 21)

The non-transitory computer-readable medium according to claim 21, wherein
the graphically outputting the graph is further configured to graphically outputting a graph with the one axis as the timing and the another axis as the number of cases per status of the influencing circumstance situation information, using received per-phase influencing circumstance situation information.

### Claim 24 (depends on 21)

The non-transitory computer-readable medium according to claim 21, wherein
the graphically outputting the graph is further configured to display a graphical output per phase identified by the phase identification information included in the influencing circumstance situation information.

### Claim 25 (depends on 21)

The non-transitory computer-readable medium according to claim 21, wherein
the graphically outputting the graph is further configured to display a graphical output per execution manager identified by the execution manager identification information included in the influencing circumstance situation information.

### Claim 26

A non-transitory computer-readable medium having stored therein a program for causing a computer to execute a process, the process comprising:
holding executor identification information that identifies an executor of a proj ect;
holding a plurality of types of influencing circumstance identification information that identifies an influencing circumstance which is a circumstance that influences the progress of the project recognized in a phase of the project;
holding status identification information that identifies a status which is information indicating a status of resolution to an influencing circumstance identified by the influencing circumstance identification information;
holding execution manager identification information that identifies an execution manager as an executor who is responsible for executing a workaround to avoid an adverse influence on the project due to the influencing circumstance;
holding phase identification information that identifies a phase of the project;
receiving an input of influencing circumstance situation information which is information that associates, with each other, the held influencing circumstance identification information, the phase identification information of the phase in which the influencing circumstance identified by the influencing circumstance identification information is recognized, recognized timing thereof, the execution manager identification information that identifies the execution manager as the executor who is responsible for executing the workaround to avoid the adverse influence on the project due to the influencing circumstance, an influence degree to which the influencing circumstance influences the project, the status identification information of the status which is information indicating the status of resolution to the influencing circumstance;
holding the received influencing circumstance situation information;
outputting the held influencing circumstance situation information; and
outputting a pie chart indicating the number of pieces of influencing circumstance situation information per status as a ratio by setting the total number of pieces of held influencing circumstance situation information as a whole.

### Claim 27 (depends on 26)

The non-transitory computer-readable medium according to claim 26, wherein
the outputting the pie chart is further configured to output a pie chart indicating the number of pieces of influencing circumstance situation information per influence degree as a ratio by setting the total number of pieces of held influencing circumstance situation information as a whole.

### Claim 28 (depends on 26)

The non-transitory computer-readable medium according to claim 26, wherein
the outputting the pie chart is further configured to output a pie chart indicating the number of pieces of influencing circumstance situation information per occurrence phase which is an occurred phase as a ratio by setting the total number of pieces of held influencing circumstance situation information as a whole.

### Claim 29 (depends on 26)

The non-transitory computer-readable medium according to claim 26, wherein
the outputting the pie chart is further configured to display, with a pie chart, an influence degree of the held influencing circumstance situation information per execution manager identified by the execution manager identification information.

### Claim 30 (depends on 26)

The non-transitory computer-readable medium according to claim 26, wherein
the outputting the pie chart is further configured to display, with a pie chart, an influence degree of the held influencing circumstance situation information per status identified by the status identification information.

### Claim 31

A project management system comprising:
a memory;
a processor coupled to the memory and the processor configured to:
hold process identification information that identifies a process of a project;
hold a plurality of types of influencing circumstance situation information, each of which expressing an influencing circumstance which is a circumstance that influences the progress of the project recognized in the process of the project;
receive an input of per-process influencing circumstance situation information which is information that associates the held influencing circumstance situation information with process identification information of a process in which an influencing circumstance indicated by the influencing circumstance situation information is recognized; and
graphically output the per-process influencing circumstance situation information.

### Claim 32 (depends on 31)

The project management system according to claim 31, wherein
the processor is further configured to graphically output the per-process influencing circumstance situation information with a matrix of the process and the influencing circumstance.

### Claim 33 (depends on 31)

The project management system according to claim 31, wherein
the processor is further configured to acquire time information, further acquire per-time process influencing situation circumstance information which is information that associates the acquired time information with the per-process influencing situation circumstance information, and indicate a change in the influencing situation on a time axis.

### Claim 34 (depends on 31)

The project management system according to claim 31, wherein
the type of the influencing circumstance in the influencing situation circumstance information includes information indicating an influence degree of the influencing circumstance on the completion of the project or process.

### Claim 35 (depends on 31)

The project management system according to claim 31, wherein
the type of the influencing circumstance in the influencing situation circumstance information includes information indicating a possibility of appearance of the influencing circumstance on a negative side.

### Claim 36 (depends on 31)

The project management system according to claim 31, wherein
the processor is further configured to hold issue information, which is information indicating an issue which hinders the complete execution of the process recognized in the process, as the influencing circumstance.

### Claim 37 (depends on 31)

The project management system according to claim 31, wherein
the processor is further configured to hold essential work information, which is information indicating a work that must be processed indispensably for the complete execution of the process recognized in the process, as the influencing circumstance.

### Claim 38 (depends on 31)

The project management system according to claim 31, wherein
the processor is further configured to hold change request information, which is information indicating a matter that is required to be changed for the complete execution of the process recognized in the process, as the influencing circumstance.

### Claim 39 (depends on 31)

The project management system according to claim 31, wherein
the processor is further configured to hold the risk information, which is information indicating a risk recognized in the process, as the influencing circumstance.

### Claim 40

A method of operating a project management system executed by a computer to execute a process, the process comprising:
holding process identification information that identifies a process of a project;
holding a plurality of types of influencing circumstance situation information, each of which expressing an influencing circumstance which is a circumstance that influences the progress of the project recognized in the process of the project;
receiving an input of per-process influencing circumstance situation information which is information that associates the held influencing circumstance situation information with process identification information of a process in which an influencing circumstance indicated by the influencing circumstance situation information is recognized; and
graphically outputting the per-process influencing circumstance situation information.

### Claim 41 (depends on 40)

The method of operating the project management system according to claim 40, wherein
the graphically outputting is further configured to graphically output the per-process influencing circumstance situation information with a matrix of the process and the influencing circumstance.

### Claim 42 (depends on 40)

The method of operating the project management system according to claim 40, wherein
the process includes acquiring time information, and acquiring per-time process influencing situation circumstance information which is information that associates the acquired time information with the per-process influencing situation circumstance information, and
the graphically outputting includes indicating a change in the influencing situation on a time axis.

### Claim 43 (depends on 40)

The method of operating the project management system according to claim 40, wherein
the type of the influencing circumstance in the influencing situation circumstance information includes information indicating an influence degree of the influencing circumstance on the completion of the project or process.

### Claim 44 (depends on 40)

The method of operating the project management system according to claim 40, wherein
the type of the influencing circumstance in the influencing situation circumstance information includes information indicating a possibility of appearance of the influencing circumstance on a negative side.

### Claim 45 (depends on 40)

The method of operating the project management system according to claim 40, wherein
the holding the plurality of types of influencing circumstance situation information includes holding issue information, which is information indicating an issue which hinders the complete execution of the process recognized in the process, as the influencing circumstance.

### Claim 46 (depends on 40)

The method of operating the project management system according to claim 40, wherein
the holding the plurality of types of influencing circumstance situation information includes holding essential work information, which is information indicating a work that must be processed indispensably for the complete execution of the process recognized in the process, as the influencing circumstance.

### Claim 47 (depends on 40)

The method of operating the project management system according to claim 40, wherein
the holding the plurality of types of influencing circumstance situation information includes holding change request information, which is information indicating a matter that is required to be changed for the complete execution of the process recognized in the process, as the influencing circumstance.

### Claim 48 (depends on 40)

The method of operating the project management system according to claim 40, wherein
the holding the plurality of types of influencing circumstance situation information includes holding the risk information, which is information indicating a risk recognized in the process, as the influencing circumstance.

### Claim 49

A non-transitory computer-readable medium having stored therein a program for causing a computer to execute a process, the process comprising:
holding process identification information that identifies a process of a project;
holding a plurality of types of influencing circumstance situation information, each of which expressing an influencing circumstance which is a circumstance that influences the progress of the project recognized in the process of the project;
receiving an input of per-process influencing circumstance situation information which is information that associates the held influencing circumstance situation information with process identification information of a process in which an influencing circumstance indicated by the influencing circumstance situation information is recognized; and
graphically outputting the per-process influencing circumstance situation information.

### Claim 50 (depends on 49)

The non-transitory computer-readable medium according to claim 49, wherein
the graphically outputting is further configured to graphically output the per-process influencing circumstance situation information with a matrix of the process and the influencing circumstance.

### Claim 51 (depends on 49)

The non-transitory computer-readable medium according to claim 49, wherein
the process includes acquiring time information, and acquiring per-time process influencing situation circumstance information which is information that associates the acquired time information with the per-process influencing situation circumstance information, and
the graphically outputting includes indicating a change in the influencing situation on a time axis.

### Claim 52 (depends on 49)

The non-transitory computer-readable medium according to claim 49, wherein
the type of the influencing circumstance in the influencing situation circumstance information includes information indicating an influence degree of the influencing circumstance on the completion of the project or process.

### Claim 53 (depends on 49)

The non-transitory computer-readable medium according to claim 49, wherein
the type of the influencing circumstance in the influencing situation circumstance information includes information indicating a possibility of appearance of the influencing circumstance on a negative side.

### Claim 54 (depends on 49)

The non-transitory computer-readable medium according to claim 49, wherein
the holding the plurality of types of influencing circumstance situation information includes holding issue information, which is information indicating an issue which hinders the complete execution of the process recognized in the process, as the influencing circumstance.

### Claim 55 (depends on 49)

The non-transitory computer-readable medium according to claim 49, wherein
the holding the plurality of types of influencing circumstance situation information includes holding essential work information, which is information indicating a work that must be processed indispensably for the complete execution of the process recognized in the process, as the influencing circumstance.

### Claim 56 (depends on 49)

The non-transitory computer-readable medium according to claim 49, wherein
the holding the plurality of types of influencing circumstance situation information includes holding change request information, which is information indicating a matter that is required to be changed for the complete execution of the process recognized in the process, as the influencing circumstance.

### Claim 57 (depends on 49)

The non-transitory computer-readable medium according to claim 49, wherein
the holding the plurality of types of influencing circumstance situation information includes holding the risk information, which is information indicating a risk recognized in the process, as the influencing circumstance.