# US 2023/0002277 A1 · Method of producing cement clinker and a second calcined material

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2023/0002277 A1
- Document ID: US20230002277A1
- Status: Published application
- Kind: A1
- Application number: 17/781,634
- Filed: 2020-12-18
- Published: 2023-01-05
- Earliest claimed: 2019-12-18
- Assignees: Holcim Technology Ltd
- Applicants: Holcim Technology Ltd
- Inventors: Michael WEIHRAUCH; Ernst BUCHER; Andreas SPULER; Peter KRUSPAN; Rudy BLUM
- Web page: https://patentgrep.com/patent/US20230002277A1

## CPC

- C04B 7/13: Mixtures thereof with inorganic cementitious materials, e.g. Portland cements
- C04B 7/475: {using the waste heat, e.g. of the cooled clinker, in an other way than by simple heat exchange in the cement production line, e.g. for generating steam}
- C04B 7/246: {from waste building materials, e.g. waste asbestos-cement products, demolition waste}
- C04B 7/26: from raw materials containing flue dust {, i.e. fly ash (C04B7/243 takes precedence)}
- C04B 7/28: from combustion residues, {e.g. ashes or slags from waste incineration}({C04B7/243} , C04B7/26 take precedence)
- C04B 7/432: {Preheating without addition of fuel}
- C04B 7/44: Burning; Melting
- C04B 7/522: {After-treatment of ground cement (C04B7/368 takes precedence)}
- C04B 28/04: Portland cements
- F27B 7/00: Rotary-drum furnaces, i.e. horizontal or slightly inclined
- F27B 7/2016: {Arrangements of preheating devices for the charge}
- F27B 19/04: arranged for associated working
- F27D 17/10: Arrangements for using waste heat
- C04B 2290/20: Integrated combined plants or devices, e.g. combined foundry and concrete plant
- F27D 3/08: Screw feeders; Screw dischargers
- F27D 2009/007: {Cooling of charges therein}
- F27D 2013/007: {using a rotary furnace}
- Y02W 30/91: Use of waste materials as fillers for mortars or concrete
- C04B: LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE {(roofing granules E04D7/005)}; CERAMICS (devitrified glass-ceramics C03C10/00); REFRACTORIES; TREATMENT OF NATURAL STONE
- F27B: FURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27D: DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- Y02W: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT

## Abstract

A method of producing cement clinker and a second calcined material, wherein the cement clinker is produced in a first production line and the second calcined material is produced from a raw material in a second production line by carrying out the following procedures e) optionally drying the raw material in a dryer, g) calcining the optionally dried raw material in a rotary kiln to obtain the second calcined material, wherein the sensible heat of a hot gas in the first production line is used as a heat source in the calcining step g) for calcining the raw material, and wherein the rotary kiln exhaust gas coming from the calcining step g) is introduced into the first production line for the secondary combustion of the rotary kiln exhaust gas.

## Claims

### Claim 1

A method of producing a first calcined material, which is cement clinker, and a second calcined material, wherein the cement clinker is produced in a first production line by carrying out the following steps:
a) preheating raw meal in a preheater in counter current flow to hot exhaust gases coming from a clinker furnace,
b) optionally pre-calcining the preheated raw meal in a pre-calciner,
c) calcining the preheated and optionally pre-calcined raw meal in the clinker furnace in counter current flow to combustion gases of a clinker furnace burner to obtain cement clinker,
d) cooling the cement clinker in a clinker cooler,
wherein the second calcined material is produced from a raw material in a second production line by carrying out the following steps:
e) optionally drying a raw material in a dryer,
f) optionally crushing the optionally dried raw material in a crusher,
g) calcining the optionally dried and optionally crushed raw material in a rotary kiln to obtain the second calcined material,
h) optionally cooling the second calcined material in a cooler,
wherein a sensible heat of a hot gas in the first production line is used as a heat source in the calcining step g) for calcining the raw material, and
wherein the rotary kiln exhaust gas coming from the calcining step g) is introduced into the first production line for the secondary combustion of the rotary kiln exhaust gas.

### Claim 2 (depends on 1)

The method according to claim 1, wherein a clinker cooler off-gas from the clinker cooler is used as said heat source in the calcining step g).

### Claim 3 (depends on 1)

The method according to claim 1, wherein the rotary kiln exhaust gas is introduced into the pre-calciner or the preheater of the first production line.

### Claim 4 (depends on 1)

The method according to claim 1, wherein the raw material is selected from sludges resulting from washing of sand or aggregates, asphalt, (waste) gypsum, contaminated earth, wet fly ash, other waste or demolition materials, road cleaning sludges, filter cakes from treatment processes of soil and waste washing, and combinations thereof.

### Claim 5 (depends on 1)

The method according to claim 1, wherein the raw material is dried in said drying step e) for reducing the amount of free water to <20 wt-%.

### Claim 6 (depends on 1)

The method according to claim 1, wherein the sensible heat of a hot gas in the first production line is used as a heat source in the drying step e) for drying the raw material.

### Claim 7 (depends on 1)

The method according to claim 1, wherein the dryer and the cooler of the second production line are operated in a heat exchanging relationship so that the sensible heat drawn from the second calcined material during the cooling step h) is used as a heat source for drying the raw material in the drying step e).

### Claim 8 (depends on 1)

The method according to claim 1, wherein the dryer and the cooler of the second production line are operated in a heat exchanging relationship so that the a loss of sensible heat to the raw material during the drying step e) is used as a cooling source for cooling the second calcined material in the cooling step h).

### Claim 9 (depends on 1)

The method according to claim 1, wherein a drying screw is used for drying the raw material in the drying step e).

### Claim 10 (depends on 1)

The method according to claim 1, wherein fuel is burnt in a burner of the rotary kiln for calcining the raw material in step g).

### Claim 11

A system comprising a first production line for producing a first calcined material, which is clinker, and a second production line for producing a second calcined material, wherein the first production line comprises:
a) a preheater for preheating raw meal in counter current flow to hot exhaust gases coming from a clinker furnace,
b) optionally a pre-calciner for pre-calcining the preheated raw meal,
c) a clinker furnace for calcining the preheated and optionally pre-calcined raw meal in counter current flow to combustion gases of a clinker furnace burner to obtain cement clinker,
d) a clinker cooler for cooling the cement clinker, wherein the second production line comprises:
e) optionally a dryer for drying a raw material,
f) optionally a crusher for crushing the optionally dried raw material,
g) a rotary kiln for calcining the optionally dried and optionally crushed raw material to obtain the second calcined material,
h) optionally a cooler for cooling the second calcined material,
wherein the first production line and the second production line are connected by a first heat exchanging pipe for feeding a sensible heat of a hot gas from the first production line to the rotary kiln as a heat source for calcining the raw material, and
wherein the first production line and the second production line are connected by a second pipe for introducing a rotary kiln exhaust gas coming from the rotary kiln into the first production line for the secondary combustion of the rotary kiln exhaust gas.

### Claim 12 (depends on 11)

The system according to claim 11, wherein the first heat exchanging pipe is in fluid communication with a clinker cooler of the first production line to feed a clinker cooler off-gas from the clinker cooler as said heat source into the rotary kiln of the second production line.

### Claim 13 (depends on 11)

The system according to claim 11, wherein the second pipe is in fluid communication with the pre-calciner or the preheater of the first production line for introducing the rotary kiln exhaust gas into the pre-calciner or the preheater, respectively.

### Claim 14 (depends on 11)

The system according to claim 11, wherein the first production line and the second production line are connected by a third heat exchanging pipe for feeding the sensible heat of a hot gas from the first production line to the dryer as a heat source for drying the raw material.

### Claim 15 (depends on 11)

The system according to claim 11, wherein the dryer and the cooler of the second production line are connected with each other in a heat exchanging manner so that the sensible heat drawn from the second calcined material in the cooler is used as a heat source for drying the raw material in the dryer.

### Claim 16 (depends on 11)

The system according to claim 11, wherein the dryer and the cooler of the second production line are connected with each other in a heat exchanging manner so that a loss of sensible heat to the raw material in the dryer is used as a cooling source for cooling the second calcined material in the cooler.

### Claim 17 (depends on 11)

The system according to claim 11, wherein the dryer is designed as a drying screw, comprising a screw conveyor for conveying the raw material and a heat exchanger surface for transferring heat from a heat exchanger fluid to the raw material while being conveyed.

### Claim 18 (depends on 11)

The system according to claim 11, wherein the rotary kiln comprises a burner.

### Claim 19 (depends on 11)

The system according to claim 11, wherein the cooler is designed as a cooling screw, comprising a screw conveyor for conveying the second calcined material and a heat exchanger surface for transferring heat from the second calcined material to a heat exchanger fluid.

### Claim 20 (depends on 1)

The method according to claim 1, wherein the second calcined material is a material having pozzolanic and/or latent hydraulic properties.