# US 2022/0396007 A1 · Formwork device

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0396007 A1
- Document ID: US20220396007A1
- Status: Published application
- Kind: A1
- Application number: 17/755,312
- Filed: 2020-10-30
- Published: 2022-12-15
- Earliest claimed: 2019-10-31
- Assignees: Umdasch Group Newcon GmbH
- Applicants: Umdasch Group NewCon GmbH
- Inventors: Christian Heuboeck; Richard Markus Leutgeb
- Web page: https://patentgrep.com/patent/US20220396007A1

## CPC

- B28B 7/245: {using transportable mould batteries}
- B28B 7/002: {using magnets}
- B28B 7/082: {Tiltable moulding tables or similar moulding surfaces (specially for casting and erecting walls or parts thereof during construction work E04G11/32)}
- B28B 7/243: {for making plates, panels or similar sheet- or disc-shaped objects}
- B28B: SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER (foundry moulding B22C; working stone or stone-like material B28D; shaping of substances in a plastic state, in general B29C; making layered products not composed wholly of these substances B32B)

## Abstract

The disclosure relates to a formwork device, in particular for arrangement between two bulkhead partitions of a battery mould, for manufacturing construction elements, in particular precast concrete elements, said formwork device comprising two formwork elements which each have a formwork front side for applying concrete and a formwork rear side, wherein the formwork elements are pivotably connected to one another at first end regions so that the formwork elements can be transferred from a vertical state into a horizontal state. The formwork device also comprises a spreading device for spreading apart second end regions of the formwork elements starting from the vertical state of the formwork elements, said second end regions being opposite the articulated connection. The disclosure also relates to: a battery mould comprising two bulkhead partitions and a formwork device according to the disclosure; a method for manufacturing a precast concrete element with the aid of the formwork device according to the disclosure; and a method for preparing the manufacture of a precast concrete element with the aid of the formwork device according to the disclosure.

## Claims

### Claim 1

A formwork device, for the manufacture of construction elements, comprising:
two formwork elements, each of which comprises a formwork front side for concrete to be applied, and a formwork rear side, wherein the formwork elements are pivotably connected to each other at the first end regions so that the formwork elements can be transferred from a standing state to a lying state, and a spreading device for spreading apart of second end regions of the formwork elements starting from the standing state of the formwork elements, said second end regions being opposite to the first end regions.

### Claim 2 (depends on 1)

The formwork device according to claim 1, wherein the spreading device comprises a force deflection device engaging at the second end regions of the formwork elements, which force deflection device converts a lowering of the formwork elements into the spreading apart of the second end regions of the formwork elements.

### Claim 3 (depends on 2)

The formwork device according to claim 2, wherein the force deflection device comprises two lever elements, which are connected to each other via a pivot bearing, with a pivot axis which is essentially stationary when spreading apart the formwork elements.

### Claim 4 (depends on 3)

The formwork device according to claim 3, wherein the pivot bearing comprises an essentially horizontal contact surface for support on the substrate when lowering the formwork elements with the spreading device attached to it.

### Claim 5 (depends on 3)

The formwork device according to claim 3, wherein the lever elements comprise receiving recesses for accommodating corresponding guide elements at the second end regions of the formwork elements.

### Claim 6 (depends on 3)

The formwork device according to claim 3, wherein a tensioning device is provided for pre-tensioning the lever elements in the direction of a resting position of the lever elements before spreading apart the second end regions of the formwork elements.

### Claim 7 (depends on 3)

The formwork device according to claim 3, wherein a releasable locking device for blocking the pivoting of the lever elements in their resting position is provided.

### Claim 8 (depends on 1)

The formwork device according to claim 1, wherein an opening device for transferring the formwork elements from the spread-apart state of the second end regions into the lying state of the formwork elements is provided.

### Claim 9 (depends on 8)

The formwork device according to claim 8, wherein the opening device comprises at least one guide path for guiding support elements at the second end regions of the formwork elements.

### Claim 10 (depends on 9)

The formwork device according to claim 9, wherein the at least one guide path comprises at least one sloping transfer section for receiving the support elements.

### Claim 11 (depends on 1)

A battery mould comprising:
two bulkhead partitions,
a formwork device according to claim 1.

### Claim 12 (depends on 11)

A method for manufacturing a precast concrete element comprising the steps:
providing a battery mould according to claim 11,
arranging the formwork elements in a concreting position in an interior space between the two bulkhead partitions,
casting of the precast concrete element in the interior space,
removal of the formwork elements with the precast concrete element from the interior space of the battery mould,
connecting the spreading device to the second end regions of the formwork elements, and
arranging the formwork elements with the precast concrete element and the spreading device at the second end regions of the formwork elements in a drying position on a substrate outside the interior space of the battery mould, wherein the second end regions of the formwork elements are spread apart by the spreading device.

### Claim 13 (depends on 12)

The method according to claim 12, wherein, when arranging on the substrate, the lowering motion of the formwork elements is converted into the spreading apart of the second end regions of the formwork elements.

### Claim 14 (depends on 8)

A method for preparing the manufacture of a precast concrete element comprising the steps:
providing a formwork device according to any one of the claim 8,
arranging the formwork elements in the standing state above a substrate,
arranging the spreading device on the substrate,
lowering the formwork elements onto the spreading device onto the substrate, spreading apart the second end regions of the formwork elements by means of the spreading device.

### Claim 15 (depends on 14)

The method according to claim 14, comprising the further steps:
moving the formwork elements from the spread-apart state of the second end regions by means of an opening device into the lying state of the formwork elements.

### Claim 16 (depends on 1)

The formwork device according to claim 1, wherein the formwork device is for-the arrangement between two bulkhead partitions of a battery mould, for the manufacture of precast concrete elements.

### Claim 17 (depends on 5)

The formwork device according to claim 5, wherein the guide elements are guide bolts.

### Claim 18 (depends on 6)

The formwork device according to claim 6, wherein the tensioning device is a spring.

### Claim 19 (depends on 9)

The formwork device according to claim 9, wherein the support elements are support rollers.