# US 2022/0393460 A1 · Device and process for fault detection of a power device

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0393460 A1
- Document ID: US20220393460A1
- Status: Published application
- Kind: A1
- Application number: 17/341,942
- Filed: 2021-06-08
- Published: 2022-12-08
- Earliest claimed: 2021-06-08
- Assignees: Cree, Inc.
- Applicants: Cree, Inc.
- Inventors: Adam E. ANDERS
- Web page: https://patentgrep.com/patent/US20220393460A1

## CPC

- H02H 1/0007: {concerning the detecting means (in general G01R or other subclasses of G01; reed switches H01H71/2445)}
- H02H 7/1255: {responsive to internal faults, e.g. by monitoring ripple in output voltage}
- H02H 3/202: {for DC systems}
- H02H 7/0822: {Integrated protection, motor control centres}
- H02H 7/09: against over-voltage; against reduction of voltage; against phase interruption
- H02H: EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS (indicating or signalling undesired working conditions G01R, e.g. G01R31/00, G08B; locating faults along lines G01R31/08; emergency protective devices H01H)

## Abstract

A power device fault detection circuit includes a first fault detector configured to measure an output signal of at least one power device and output a first fault signal when a voltage of the output signal of the at least one power device exceeds a first voltage reference level after a first time period; and a second fault detector configured to measure an output signal of the at least one power device and output a second fault signal when a voltage of the output signal of the at least one power device exceeds a second voltage reference level after a second time period, where the first time period implemented by the first fault detector is shorter than the second time period implemented by the second fault detector.

## Claims

### Claim 1

A power device fault detection circuit, comprising:
a first fault detector configured to measure an output signal of at least one power device and output a first fault signal when a voltage of the output signal of the at least one power device exceeds a first voltage reference level after a first time period; and
a second fault detector configured to measure an output signal of the at least one power device and output a second fault signal when a voltage of the output signal of the at least one power device exceeds a second voltage reference level after a second time period,
wherein the first time period implemented by the first fault detector is shorter than the second time period implemented by the second fault detector.

### Claim 2 (depends on 1)

The power device fault detection circuit according to claim 1 wherein the first fault detector is configured to be operational prior to the second fault detector being operational.

### Claim 3

(canceled)

### Claim 4 (depends on 1)

The power device fault detection circuit according to claim 1 wherein the first voltage reference level implemented by the first fault detector is higher than the second voltage reference level implemented by the second fault detector.

### Claim 5 (depends on 1)

The power device fault detection circuit according to claim 1 wherein the first fault detector comprises at least one of the following: a first Leading Edge Blanking (LEB), a first measurement device, and a first filtering time function.

### Claim 6

(canceled)

### Claim 7 (depends on 5)

The power device fault detection circuit according to claim 5 wherein the first measurement device is configured to determine whether the output signal of the at least one power device is greater than the first voltage reference level implemented by the first fault detector.

### Claim 8 (depends on 5)

The power device fault detection circuit according to claim 5 wherein the first measurement device is configured as a comparator configured to compare the output signal of the at least one power device and the first voltage reference level implemented by the first fault detector.

### Claim 9

(canceled)

### Claim 10

(canceled)

### Claim 11 (depends on 1)

The power device fault detection circuit according to claim 1 wherein the second fault detector comprises at least one of the following: a second Leading Edge Blanking (LEB), a second measurement device, and a second filtering time function.

### Claim at position 12

-16. (canceled)

### Claim 17 (depends on 1)

The power device fault detection circuit according to claim 1 wherein the first fault detector is configured to implement in part a blanking capacitor (CBLK).

### Claim 18

(canceled)

### Claim 19 (depends on 17)

The power device fault detection circuit according to claim 17 further comprising a transistor to disconnect the blanking capacitor (CBLK).

### Claim 20 (depends on 17)

The power device fault detection circuit according to claim 17 wherein the first fault detector is further configured to determine whether a voltage on the output signal of the at least one power device is below the first voltage reference level and thereafter reconnect the blanking capacitor (CBLK).

### Claim 21

(canceled)

### Claim 22 (depends on 1)

The power device fault detection circuit according to claim 1 wherein the at least one power device comprises a SiC MOSFET.

### Claim 23 (depends on 1)

A system comprising the power device fault detection circuit according to claim 1, the system configured as one of the following: an inverter, a power system, a motor system, a converter, and an AC-DC power supply.

### Claim 24 (depends on 1)

A system comprising the power device fault detection circuit according to claim 1, and the system further comprising a plurality of the at least one power device arranged in a power module.

### Claim 25

A process of implementing a power device fault detection circuit, comprising:
generating with a first fault detector a first fault signal when a voltage of an output signal of at least one power device exceeds a first voltage reference level after a first time period; and
generating with a second fault detector a second fault signal when a voltage of the output signal of the at least one power device exceeds a second voltage reference level after a second time period,
wherein the first time period implemented by the first fault detector is shorter than the second time period implemented by the second fault detector.

### Claim 26 (depends on 25)

The process of implementing a power device fault detection circuit according to claim 25 further comprising operating the first fault detector prior to operating the second fault detector.

### Claim 27 (depends on 25)

The process of implementing a power device fault detection circuit according to claim 25 further comprising the first fault detector is configured to be operational while disabling the second fault detector.

### Claim 28 (depends on 25)

The process of implementing a power device fault detection circuit according to claim 25 wherein the first voltage reference level implemented by the first fault detector is higher than the second voltage reference level implemented by the second fault detector.

### Claim at position 25

-46. (canceled)

### Claim 47 (depends on 25)

A process of implementing a system comprising the process of implementing a power device fault detection circuit according to claim 25, the process of implementing a system further comprising implementing the system as one of the following: an inverter, a power system, a motor system, a converter, and an AC-DC power supply.

### Claim 48

(canceled)

### Claim 49

A power device fault detection circuit, comprising:
a first fault detector comprising a first Leading Edge Blanking (LEB), a first measurement device, and a first filtering time function;
the first fault detector configured to measure an output signal of at least one power device and output a first fault signal;
a second fault detector comprising a second Leading Edge Blanking (LEB), a second measurement device, and a second filtering time function; and
the second fault detector configured to measure an output signal of the at least one power device and output a second fault signal.

### Claim 50 (depends on 49)

The power device fault detection circuit according to claim 49 wherein the first fault detector is configured to be operational prior to the second fault detector being operational.

### Claim 51 (depends on 49)

The power device fault detection circuit according to claim 49 wherein the first fault detector is configured to be operational while the second fault detector is disabled.

### Claim 52 (depends on 49)

The power device fault detection circuit according to claim 49 wherein:
the first fault detector is configured to measure the output signal of at least one power device and output the first fault signal when a voltage of the output signal of the at least one power device exceeds a first voltage reference level after a first time period; and
the second fault detector is configured to measure the output signal of the at least one power device and output the second fault signal when a voltage of the output signal of the at least one power device exceeds a second voltage reference level after a second time period,
wherein the first time period implemented by the first fault detector is shorter than the second time period implemented by the second fault detector.

### Claim 53 (depends on 52)

The power device fault detection circuit according to claim 52 wherein the first voltage reference level implemented by the first fault detector is higher than the second voltage reference level implemented by the second fault detector.

### Claim 54 (depends on 52)

The power device fault detection circuit according to claim 52 wherein the first Leading Edge Blanking (LEB) is configured to implement at least in part the first time period of the first fault detector.

### Claim 55 (depends on 52)

The power device fault detection circuit according to claim 52 wherein the first measurement device is configured to determine whether the output signal of the at least one power device is greater than the first voltage reference level implemented by the first fault detector.

### Claim 56 (depends on 52)

The power device fault detection circuit according to claim 52 wherein the first measurement device is configured as a comparator configured to compare the output signal of the at least one power device and the first voltage reference level implemented by the first fault detector.

### Claim 57 (depends on 52)

The power device fault detection circuit according to claim 52 wherein the first measurement device is configured to measure a voltage of the output signal of the at least one power device.

### Claim at position 37

-71. (canceled)
