# US 2022/0294823 A1 · Systems and methods for establishing a secure communication link in an electric power distribution system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0294823 A1
- Document ID: US20220294823A1
- Status: Published application
- Kind: A1
- Application number: 17/201,299
- Filed: 2021-03-15
- Published: 2022-09-15
- Earliest claimed: 2021-03-15
- Assignees: Schweitzer Engineering Laboratories, Inc.
- Applicants: Schweitzer Engineering Laboratories, Inc.
- Inventors: Ryan Bradetich; Colin Gordon; Arun Shrestha; Karen SJ Wyszczelski; Hidayatullah Ahsan
- Web page: https://patentgrep.com/patent/US20220294823A1

## CPC

- H04L 63/162: {at the data link layer}
- H04L 9/0838: {Key agreement, i.e. key establishment technique in which a shared key is derived by parties as a function of information contributed by, or associated with, each of these (network architectures or network communication protocols for key exchange in a packet data network H04L63/061)}
- H04L 63/0435: {wherein the sending and receiving network entities apply symmetric encryption, i.e. same key used for encryption and decryption (cryptographic mechanisms or cryptographic arrangements for symmetric key encryption H04L9/06)}
- H04L 63/06: {for supporting key management in a packet data network (cryptographic mechanisms or cryptographic arrangements for key management H04L9/08)}
- Y04S 40/20: Information technology specific aspects, e.g. CAD, simulation, modelling, system security
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

An intelligent electronic device (IED) of an electric power distribution system includes processing circuitry and a memory that includes a tangible, non-transitory, computer-readable comprising instructions. The instructions, when executed by the processing circuitry, are configured to cause the processing circuitry to receive operating data associated with the electric power distribution system, determine whether the operating data matches with expected operating data, generate a connectivity association key (CAK) based on the operating data in response to a determination that the operating data matches with the expected operating data, and establishing a connectivity association based on the CAK.

## Claims

### Claim 1

An intelligent electronic device (IED) of an electric power distribution system, the IED comprising:
processing circuitry; and
a memory comprising a tangible, non-transitory, computer-readable comprising instructions, wherein the instructions, when executed by the processing circuitry, are configured to cause the processing circuitry to perform operations comprising:
receiving operating data associated with the electric power distribution system;
determining whether the operating data matches with expected operating data;
generating a connectivity association key (CAK) based on the operating data in response to a determination that the operating data matches with the expected operating data; and
establishing a connectivity association based on the CAK.

### Claim 2 (depends on 1)

The IED of claim 1, wherein the instructions, when executed by the processing circuitry, are configured to cause the processing circuitry to perform operations comprising:
determining whether an additional IED possesses a copy of the CAK; and
establishing the connectivity association with the additional IED based on a determination that the additional IED possesses the copy of the CAK.

### Claim 3 (depends on 1)

The IED of claim 1, wherein the instructions, when executed by the processing circuitry, are configured to cause the processing circuitry to perform operations comprising:
generating a security association key (SAK) based on the CAK; and
establishing a media access control security (MACsec) communication link based on the SAK.

### Claim 4 (depends on 3)

The IED of claim 3, wherein the instructions, when executed by the processing circuitry, are configured to cause the processing circuitry to use the SAK to encrypt data to be transmitted via the MACsec communication link, to decrypt data received via the MACsec communication link, or both.

### Claim 5 (depends on 1)

The IED of claim 1, wherein the instructions, when executed by the processing circuitry, are configured to cause the processing circuitry to perform operations comprising:
monitoring additional operating data; and
generating the expected operating data based on the additional operating data.

### Claim 6 (depends on 5)

The IED of claim 5, wherein the operating data comprises first operating values monitored at first time intervals, the additional operating data comprises second operating values monitored at second time intervals, and the instructions, when executed by the processing circuitry, are configured to cause the processing circuitry to adjust the additional operating data based on the first operating values relative to the second operating values to generate the expected operating data.

### Claim 7 (depends on 1)

The IED of claim 1, wherein the instructions, when executed by the processing circuitry, are configured to cause the processing circuitry to flag a notification based on a determination that the operating data does not match with the expected operating data.

### Claim 8 (depends on 1)

The IED of claim 1, wherein the instructions, when executed by the processing circuitry, are configured to cause the processing circuitry to block establishment of the connectivity association in response to a determination that the operating data does not match with the expected operating data.

### Claim 9

A system, comprising:
a first intelligent electronic device (TED) configured to monitor first operating data of an electric power distribution system; and
a second IED configured to perform operations comprising:
receiving the first operating data from the first IED;
monitoring second operating data of the electric power distribution system;
determining whether the first operating data matches with expected operating data;
generating a connectivity association key (CAK) based on the first operating data and the second operating data in response to a determination that the first operating data matches with the expected operating data; and
establishing a connectivity association based on the CAK.

### Claim 10 (depends on 9)

The system of claim 9, wherein the first TED is configured to perform operation comprising:
receiving the second operating data from the second TED;
determining whether the second operating data matches with additional expected operating data;
generating an additional CAK based on the first operating data and the second operating data in response to a determination that the second operating data matches with the additional expected operating data; and
establishing an additional connectivity association based on the additional CAK.

### Claim 11 (depends on 10)

The system of claim 10, comprising a switch, wherein the connectivity association is established between the first TED and the switch, the additional connectivity association is established between the second TED and the switch, and the switch is configured to enable data communication between the first TED and the second TED using the connectivity association and the additional connectivity association.

### Claim 12 (depends on 11)

The system of claim 11, wherein the switch is configured to perform operations comprising:
receiving the first operating data from the first IED;
transmitting the first operating data to the second TED;
receiving the second operating data from the second TED; and
transmitting the second operating data to the first TED.

### Claim 13 (depends on 9)

The system of claim 9, comprising a third IED configured to monitor third operating data of the electric power distribution system, wherein the second IED is configured to perform operations comprising:
receiving the third operating data from the third IED;
determining whether the third operating data matches with additional expected operating data;
generating an additional CAK based on the first operating data and the third operating data in response to a determination that the third operating data matches with the additional expected operating data; and
establishing an additional connectivity association based on the additional CAK.

### Claim 14 (depends on 9)

The system of claim 9, comprising a third IED configured to monitor third operating data of the electric power distribution system, wherein the second IED is configured to perform operations comprising:
receiving the third operating data from the third IED;
determining whether the third operating data matches with additional expected operating data;
generating the CAK based on the first operating data, the second operating data, and the third operating data in response to a determination that the third operating data matches with the additional expected operating data; and
establishing the connectivity association based on the CAK.

### Claim 15 (depends on 9)

The system of claim 9, comprising a third IED configured to monitor third operating data of the electric power distribution system, wherein the second IED is configured to perform operations comprising:
receiving the third operating data from the third IED;
determining whether the third operating data matches with additional expected operating data; and
communicating with the first IED to cause the first IED to block an additional connectivity association from being established in response to a determination that the third operating data does not match with the additional expected operating data.

### Claim 16

A tangible, non-transitory, computer-readable medium comprising instructions, wherein the instructions, when executed by processing circuitry, are configured to cause the processing circuitry to perform operations comprising:
monitoring first operating data associated with a first section of an electric power distribution system;
receiving second operating data associated with a second section of the electric power distribution system;
determining whether the first operating data substantially matches with the second operating data;
generating a connectivity association key (CAK) based on the first operating data, the second operating data, or both, in response to a determination that the first operating data substantially matches with the second operating data; and
establishing a connectivity association based on the CAK.

### Claim 17 (depends on 16)

The tangible, non-transitory, computer-readable medium of claim 16, wherein the instructions, when executed by the processing circuitry, are configured to cause the processing circuitry to determine the first operating data substantially matches with the second operating data based on the first operating data being within a threshold of the second operating data.

### Claim 18 (depends on 16)

The tangible, non-transitory, computer-readable medium of claim 16, wherein the first operating data, the second operating data, or both, comprises a set of voltage values, a set of current values, or both.

### Claim 19 (depends on 16)

The tangible, non-transitory, computer-readable medium of claim 16, wherein the instructions, when executed by the processing circuitry, are configured to cause the processing circuitry to transmit the first operating data to an intelligent electronic device (IED) of the electric power distribution system for establishment of the connectivity association with the IED based on the CAK.

### Claim 20 (depends on 16)

The tangible, non-transitory, computer-readable medium of claim 16, wherein the instructions, when executed by the processing circuitry, are configured to cause the processing circuitry to perform operations comprising:
generating a passcode based on the first operating data, the second operating data, or both, in response to the determination that the first operating data substantially matches with the second operating data; and
generating the CAK based on the passcode.
