# US 2022/0294736 A1 · Congestion Control Method and Related Device

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0294736 A1
- Document ID: US20220294736A1
- Status: Published application
- Kind: A1
- Application number: 17/831,070
- Filed: 2022-06-02
- Published: 2022-09-15
- Earliest claimed: 2019-12-03
- Applicants: Huawei Technologies Co., Ltd.
- Inventors: Siyu Yan; Xiaolong Zheng; Weishan Deng; Yinben Xia
- Web page: https://patentgrep.com/patent/US20220294736A1

## CPC

- H04L 47/28: in relation to timing considerations
- H04L 43/0864: Round trip delays
- H04L 43/0882: Utilisation of link capacity
- H04L 47/10: Flow control; Congestion control
- H04L 47/11: Identifying congestion
- H04L 47/122: by diverting traffic away from congested entities
- H04L 47/127: by using congestion prediction
- H04L 47/25: with rate being modified by the source upon detecting a change of network conditions
- H04L 47/29: {using a combination of thresholds}
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

A congestion control method is provided. The method includes obtaining a first traffic characteristic, where the first traffic characteristic includes statistical information generated when a first device forwards traffic in a first period based on a first congestion control parameter, and the first congestion control parameter is obtained according to a first congestion control rule, obtaining a first reward value based on the first traffic characteristic, modifying the first congestion control parameter by using a first step, to obtain a second congestion control parameter, obtaining a second traffic characteristic, where the second traffic characteristic includes statistical information generated when the first device forwards traffic in a second period based on the second congestion control parameter, obtaining a second reward value based on the second traffic characteristic, and performing corresponding processing if the second reward value is greater than the first reward value.

## Claims

### Claim 1

A congestion control method, comprising:
obtaining a first traffic characteristic, wherein the first traffic characteristic comprises statistical information generated when a first device forwards traffic in a first period based on a first congestion control parameter, and wherein the first congestion control parameter is obtained according to a first congestion control rule;
obtaining a first reward value based on the first traffic characteristic;
modifying the first congestion control parameter by a first step amount to obtain a second congestion control parameter;
obtaining a second traffic characteristic, wherein the second traffic characteristic comprises statistical information generated when the first device forwards traffic in a second period based on the second congestion control parameter;
obtaining a second reward value based on the second traffic characteristic; and
performing corresponding processing if the second reward value is greater than the first reward value.

### Claim 2 (depends on 1)

The method according to claim 1, wherein the modifying the first congestion control parameter by a first step amount to obtain a second congestion control parameter comprises:
obtaining a first running value and a second running value of the first device;
determining whether a difference between the first running value and the second running value is less than a target threshold; and
modifying, based on determining the difference between the first running value and the second running value to be less than the target threshold, the first congestion control parameter by the first step amount to obtain the second congestion control parameter.

### Claim 3 (depends on 1)

The method according to claim 1, wherein the modifying the first congestion control parameter by a first step amount to obtain a second congestion control parameter comprises:
adjusting an initial congestion control parameter;
counting a quantity of consecutive adjustments to the initial congestion control parameter; and
modifying, based on the quantity of consecutive adjustments being greater than a preset threshold N, the first congestion control parameter by the first step amount to obtain the second congestion control parameter;
wherein the first congestion control parameter is obtained by adjusting the initial congestion control parameter for N+1 consecutive times according to the first congestion control rule.

### Claim 4 (depends on 1)

The method according to claim 1, wherein the first congestion control rule is a first formula, and the first formula is:
Q=F(A, B), wherein Q is a congestion control parameter, A is a rate, B is a specified latency, and F(A, B) is a function related to A and B.

### Claim 5 (depends on 4)

The method according to claim 4, wherein the first formula is:
Q=A*B.

### Claim 6 (depends on 5)

The method according to claim 5, wherein the performing corresponding processing comprises:
modifying the first formula by using the first step amount to obtain a second formula.

### Claim 7 (depends on 6)

The method according to claim 6, wherein the method further comprises:
obtaining a third congestion control parameter based on the second traffic characteristic according to the second formula, wherein the third congestion control parameter is used by the first device to control traffic forwarding.

### Claim 8 (depends on 7)

The method according to claim 7, wherein the first step amount is a percentage.

### Claim 9 (depends on 6)

The method according to claim 6, wherein the second formula is Q=A*B*(1+C), wherein C is the first step amount.

### Claim 10 (depends on 1)

The method according to claim 1, wherein the performing corresponding processing comprises:
forward-modifying the second congestion control parameter by a second step amount to obtain a third congestion control parameter;
obtaining a third traffic characteristic, wherein the third traffic characteristic comprises statistical information generated when the first device forwards traffic in a third period based on the third congestion control parameter; and
obtaining a third reward value based on the third traffic characteristic.

### Claim 11 (depends on 10)

The method according to claim 10, wherein the method further comprises:
reversely-modifying, if the third reward value is less than the second reward value, the second congestion control parameter by a third step amount to obtain a fourth congestion control parameter;
obtaining a fourth traffic characteristic, wherein the fourth traffic characteristic comprises statistical information generated when the first device forwards traffic in a fourth period based on the fourth congestion control parameter; and
obtaining a fourth reward value based on the fourth traffic characteristic.

### Claim 12 (depends on 11)

The method according to claim 11, wherein the method further comprises:
modifying, if the fourth reward value is greater than the second reward value, the first congestion control rule by using the third step amount and the first step amount to obtain a second congestion control rule.

### Claim 13 (depends on 12)

The method according to claim 12, wherein after the performing corresponding processing, the method further comprises:
generating a new congestion control parameter of the first device based on the fourth traffic characteristic according to the second congestion control rule, wherein the first device controls traffic forwarding based on the new congestion control parameter.

### Claim 14 (depends on 10)

The method according to claim 10, wherein the second step amount is greater than the first step amount.

### Claim 15 (depends on 1)

The method according to claim 1, wherein the performing corresponding processing comprises:
obtaining a fifth traffic characteristic, wherein the fifth traffic characteristic comprises statistical information generated when a second device forwards traffic in the first period based on a fifth congestion control parameter, and the fifth congestion control parameter is obtained according to a third congestion control rule;
obtaining a fifth reward value based on the fifth traffic characteristic;
modifying the fifth congestion control parameter by using a fourth step amount to obtain a sixth congestion control parameter;
obtaining a sixth traffic characteristic, wherein the sixth traffic characteristic comprises statistical information generated when the second device forwards traffic in the second period based on the sixth congestion control parameter;
obtaining a sixth reward value based on the sixth traffic characteristic; and
generating, if a sum of the sixth reward value and the second reward value is greater than a sum of the fifth reward value and the first reward value, a new congestion control parameter.

### Claim 16 (depends on 15)

The method according to claim 15, wherein generating a new congestion control parameter comprises:
modifying the third congestion control rule based on the fourth step amount; and
modifying the first congestion control rule based on the first step amount.

### Claim 17 (depends on 15)

The method according to claim 15, wherein generating a new congestion control parameter further comprises:
modifying the second congestion control parameter by using a second step amount to obtain a third congestion control parameter;
obtaining a third traffic characteristic, wherein the third traffic characteristic comprises statistical information generated when the first device forwards traffic in a third period based on the third congestion control parameter;
obtaining a third reward value based on the third traffic characteristic;
modifying the sixth congestion control parameter by using a fifth step amount to obtain a seventh congestion control parameter;
obtaining a seventh traffic characteristic, wherein the seventh traffic characteristic comprises statistical information generated when the second device forwards traffic in the third period based on the seventh congestion control parameter; and
obtaining a seventh reward value based on the seventh traffic characteristic.

### Claim 18

A congestion control device, comprising:
a processor; and
a non-transitory computer-readable memory storing a program to be executed by the processor, the program including instructions to cause the congestion control device to:
obtain a first traffic characteristic, wherein the first traffic characteristic comprises statistical information generated when a first device forwards traffic in a first period based on a first congestion control parameter, and the first congestion control parameter is obtained according to a first congestion control rule;
obtain a first reward value based on the first traffic characteristic;
modify the first congestion control parameter by a first step amount to obtain a second congestion control parameter;
obtain a second traffic characteristic, wherein the second traffic characteristic comprises statistical information generated when the first device forwards traffic in a second period based on the second congestion control parameter;
obtain a second reward value based on the second traffic characteristic; and
perform corresponding processing if the second reward value is greater than the first reward value.

### Claim 19 (depends on 18)

The congestion control device according to claim 18, wherein the instructions further cause the congestion control device to:
obtain a first running value and a second running value of the first device;
determine whether a difference between the first running value and the second running value is less than a target threshold; and
modifying, based on determining the difference between the first running value and the second running value to be than the target threshold, the first congestion control parameter by the first step amount to obtain the second congestion control parameter.

### Claim 20 (depends on 19)

The congestion control device according to claim 19, wherein the instructions further cause the congestion control device to:
adjust an initial congestion control parameter;
count a quantity of consecutive adjustments to the initial congestion control parameter; and
modify, if the quantity of consecutive adjustments is greater than a preset threshold N, the first congestion control parameter by the first step amount to obtain the second congestion control parameter;
wherein the first congestion control parameter is obtained by adjusting the initial congestion control parameter for N+1 consecutive times according to the first congestion control rule.
