# US 2022/0294662 A1 · Building data platform with graph based permissions

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0294662 A1
- Document ID: US20220294662A1
- Status: Published application
- Kind: A1
- Application number: 17/828,887
- Filed: 2022-05-31
- Published: 2022-09-15
- Earliest claimed: 2019-12-31
- Assignees: Johnson Controls Tyco IP Holdings LLP
- Applicants: Johnson Controls Tyco IP Holdings LLP
- Inventors: Justin J. Ploegert; Dominick James O'Dierno; Brian Scott Otto
- Web page: https://patentgrep.com/patent/US20220294662A1

## CPC

- G06F 16/288: {Entity relationship models}
- G05B 13/0265: {the criterion being a learning criterion}
- G05B 13/041: {in which a variable is automatically adjusted to optimise the performance}
- G05B 13/047: {the criterion being a time optimal performance criterion}
- G05B 15/02: electric
- G05B 17/02: electric
- G05B 19/0428: {Safety, monitoring (G05B19/0423 takes precedence)}
- G06F 9/542: {Event management; Broadcasting; Multicasting; Notifications}
- G06F 9/547: {Remote procedure calls [RPC]; Web services}
- G06F 16/212: {with details for data modelling support}
- G06F 16/2358: {Change logging, detection, and notification (replication G06F16/27)}
- G06F 16/24526: {Internal representations for queries}
- G06F 16/24575: {using context}
- G06F 16/258: {Data format conversion from or to a database}
- G06F 16/27: Replication, distribution or synchronisation of data between databases or within a distributed database system; Distributed database system architectures therefor
- G06F 16/9024: {Graphs; Linked lists (G06F16/9027 takes precedence)}
- G06F 21/60: Protecting data
- G06F 30/13: Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
- G06Q 30/04: Billing or invoicing
- G06Q 50/00: Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism (healthcare informatics G16H)
- G06Q 50/06: Energy or water supply
- H04L 12/282: {based on user interaction within the home (receiver circuitry for displaying additional information being controlled by a remote control apparatus H04N21/42204)}
- H04L 12/2827: {Reporting to a device within the home network; wherein the reception of the information reported automatically triggers the execution of a home appliance functionality}
- H04L 67/12: specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
- H04L 67/561: Adding application-functional data or data for application control, e.g. adding metadata
- G05B 2219/163: Domotique, domestic, home control, automation, smart, intelligent house
- G05B 2219/25011: Domotique, I-O bus, home automation, building automation
- G05B 2219/2614: HVAC, heating, ventillation, climate control
- G05B 2219/2642: Domotique, domestic, home control, automation, smart house
- G05B 2219/2652: Medical scanner
- H04L 12/2803: {Home automation networks}
- H04L 12/2807: {Exchanging configuration information on appliance services in a home automation network (arrangements for maintenance or administration involving network analysis for automatically determining the actual topology of a network H04L41/12; hardware or software tools for network management using graphical user interfaces H04L41/22; address allocation H04L61/50)}
- H04L 43/062: related to network traffic
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

A building system of a building including one or more memory devices having instructions thereon, that, when executed by one or more processors, cause the one or more processors to receive a request to access a portion of a building graph of the building from a system, the building graph including a plurality of nodes and a plurality of edges, the plurality of nodes representing entities of the building and the plurality of edges representing relationships between the entities of the building. The instructions cause one or more processors to determine whether the system has access to the portion of the building graph based on a policy indicated by the plurality of nodes and edges of the building graph and provide the portion of the building graph to the system in response to a determination that the system has access to the portion of the building graph.

## Claims

### Claim 1

A building system of a building comprising one or more memory devices having instructions thereon, that, when executed by one or more processors, cause the one or more processors to:
receive, from a system, a request to read a portion of a building graph of the building, the building graph including a plurality of nodes and a plurality of edges, the plurality of nodes representing entities of the building and the plurality of edges representing relationships between the entities of the building;
determine that the system has permission to read the portion of the building graph based on one or more nodes of the plurality of nodes and one or more edges of the plurality of edges, wherein the building graph represents the permission to read the portion of the building graph within the building graph itself via the one or more nodes and the one or more edges; and
provide the portion of the building graph to the system in response to a determination that the system has permission to read the portion of the building graph.

### Claim 2 (depends on 1)

The building system of claim 1, wherein a first node of the plurality of nodes represents the permission to read the portion of the building graph;
wherein a second node of the plurality of nodes indicates a command permission to send commands to devices represented by the portion of the building graph.

### Claim 3 (depends on 1)

The building system of claim 1, wherein the instructions cause the one or more processors to determine that the system has permission to read the portion of the building graph by:
identifying a first node of the plurality of nodes representing the system; and
identifying an edge of the plurality of of edges between the first node and a second node of the plurality of nodes representing the permission to read the portion of the building graph.

### Claim 4 (depends on 1)

The building system of claim 1, wherein the permission to read the portion of the building graph is a permission to read events associated with a particular entity;
wherein the plurality of nodes include a first node representing the permission and the plurality of nodes include a second node representing the particular entity;
wherein an edge of the plurality of edges links the first node to the second node.

### Claim 5 (depends on 1)

The building system of claim 1, wherein the permission to read the portion of the building graph is a permission to read events associated with particular entities that are linked to an entity;
wherein the plurality of nodes include a first node representing the permission and the plurality of nodes include a second node representing a particular entity;
wherein an edge of the plurality of edges links the first node to the second node;
wherein the plurality of nodes include a plurality of third nodes representing the particular entities;
wherein the plurality of edges include second edges relating the third nodes to the second node.

### Claim 6 (depends on 1)

The building system of claim 1, wherein the instructions cause the one or more processors to:
receive a command to perform an action for an entity from the system;
identify that the system has a command permission to make the command to perform the action based on the building graph by:
identifying a first node of the plurality of nodes representing the system; and
identifying one or more particular edges between the first node and a second node of the plurality of nodes representing the command permission to make the command.

### Claim 7 (depends on 1)

The building system of claim 1, wherein the instructions cause the one or more processors to:
receive, from the system, a request to write one or more values to the portion of the building graph;
determine that the system has permission to write to the portion of the building graph based on one or more second nodes and one or more second edges of the building graph that represent the permission to write to the portion of the building graph; and
write the one or more values to the portion of the building graph in response to a determination that the system has permission to write to the portion of the building graph.

### Claim 8 (depends on 1)

The building system of claim 1, wherein the instructions cause the one or more processors to:
receive, from the system, a command value for one or more particular nodes and write the command value in the one or more nodes of the building graph responsive to identifying a write permission for the system; and
operate a piece of building equipment to perform a command indicated by the command value.

### Claim 9 (depends on 1)

The building system of claim 1, wherein the instructions cause the one or more processors to:
determine that the system has a read or write permission to read one or more first nodes or write data to the one or more first nodes of the building graph by:
identifying a permission for the system to read or write to a second node indicated by the plurality of nodes and edges of the building graph and by identifying that the read or write permission cascades from the second node to the one or more first nodes by identifying that the one or more first nodes depend from the second node via one or more particular edges of the building graph;
wherein other nodes that depend from the second node receive the read or write permission based on their dependence from the second node indicating that the system has permission to read or write to the other nodes.

### Claim 10

A method comprising:
receiving, by a processing circuit, from a system, a request to read a portion of a building graph of a building, the building graph including a plurality of nodes and a plurality of edges, the plurality of nodes representing entities of the building and the plurality of edges representing relationships between the entities of the building;
determining, by the processing circuit, that the system has permission to read the portion of the building graph based on one or more nodes of the plurality of nodes and one or more edges of the plurality of edges, wherein the building graph represents the permission to read the portion of the building graph within the building graph itself via the one or more nodes and the one or more edges; and
providing, by the processing circuit, the portion of the building graph to the system in response to a determination that the system has permission to read the portion of the building graph.

### Claim 11 (depends on 10)

The method of claim 10, wherein a first node of the plurality of nodes represents the permission to read the portion of the building graph;
wherein a second node of the plurality of nodes indicates a command permission to send commands to devices represented by the portion of the building graph.

### Claim 12 (depends on 10)

The method of claim 10, wherein determining, by the processing circuit, that the system has permission to read the portion of the building graph by:
identifying a first node of the plurality of nodes representing the system; and
identifying an edge of the plurality of edges between the first node and a second node of the plurality of nodes representing the permission to read the portion of the building graph.

### Claim 13 (depends on 10)

The method of claim 10, wherein the permission to read the portion of the building graph is a permission to read events associated with a particular entity;
wherein the plurality of nodes include a first node representing the permission and the plurality of nodes include a second node representing the particular entity;
wherein an edge of the plurality of edges links the first node to the second node.

### Claim 14 (depends on 10)

The method of claim 10, wherein the permission to read the portion of the building graph is a permission to read events associated with particular entities that are linked to an entity;
wherein the plurality of nodes include a first node representing the permission and the plurality of nodes include a second node representing a particular entity;
wherein an edge of the plurality of edges links the first node to the second node;
wherein the plurality of nodes include a plurality of third nodes representing the particular entities;
wherein the plurality of edges include second edges relating the third nodes to the second node.

### Claim 15 (depends on 10)

The method of claim 10, further comprising:
receiving, by the processing circuit, a command to perform an action for an entity from the system;
identifying, by the processing circuit, that the system has a command permission to make the command to perform the action based on the building graph by:
identifying a first node of the plurality of nodes representing the system; and
identifying one or more particular edges between the first node and a second node of the plurality of nodes representing the command permission to make the command.

### Claim 16 (depends on 10)

The method of claim 10, further comprising:
receiving, by the processing circuit, from the system, a request to write one or more values to the portion of the building graph;
determining, by the processing circuit, that the system has permission to write to the portion of the building graph based on one or more second nodes and one or more second edges of the building graph that represent the permission to write to the portion of the building graph; and
writing, by the processing circuit, the one or more values to the portion of the building graph in response to a determination that the system has permission to write to the portion of the building graph.

### Claim 17 (depends on 10)

The method of claim 10, further comprising:
receiving, by the processing circuit, from the system, a command value for one or more particular nodes and write the command value in the one or more nodes of the building graph responsive to identifying a write permission for the system; and
operating, by the processing circuit, a piece of building equipment to perform a command indicated by the command value.

### Claim 18 (depends on 10)

The method of claim 10, further comprising:
determining, by the processing circuit, that the system has a read or write permission to read one or more first nodes or write data to the one or more first nodes of the building graph by:
identifying a permission for the system to read or write to a second node indicated by the plurality of nodes and edges of the building graph and by identifying that the read or write permission cascades from the second node to the one or more first nodes by identifying that the one or more first nodes depend from the second node via one or more particular edges of the building graph;
wherein other nodes that depend from the second node receive the read or write permission based on their dependence from the second node indicating that the system has permission to read or write to the other nodes.

### Claim 19

One or more storage medium storing instructions thereon that, when executed by one or more processors, cause the one or more processors to:
receive, from a system, a request to read a portion of a building graph of a building, the building graph including a plurality of nodes and a plurality of edges, the plurality of nodes representing entities of the building and the plurality of edges representing relationships between the entities of the building;
determine that the system has permission to read the portion of the building graph based on one or more nodes of the plurality of nodes and one or more edges of the plurality of edges, wherein the building graph represents the permission to read the portion of the building graph within the building graph itself via the one or more nodes and the one or more edges; and
provide the portion of the building graph to the system in response to a determination that the system has permission to read the portion of the building graph.

### Claim 20 (depends on 19)

The one or more storage medium of claim 19, wherein the instructions cause the one or more processors to:
determine that the system has a read or write permission to read one or more first nodes or write data to the one or more first nodes of the building graph by:
identifying a permission for the system to read or write to a second node indicated by the plurality of nodes and edges of the building graph and by identifying that the read or write permission cascades from the second node to the one or more first nodes by identifying that the one or more first nodes depend from the second node via one or more particular edges of the building graph;
wherein other nodes that depend from the second node receive the read or write permission based on their dependence from the second node indicating that the system has permission to read or write to the other nodes.
