# US 2022/0294263 A1 · Method and arrangement for ascertaining a load flow map within an ac-voltage power supply grid

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0294263 A1
- Document ID: US20220294263A1
- Status: Published application
- Kind: A1
- Application number: 17/831,767
- Filed: 2022-06-03
- Published: 2022-09-15
- Earliest claimed: 2019-12-06
- Assignees: SMA Solar Technology AG
- Applicants: SMA Solar Technology AG
- Inventors: Andreas Falk
- Web page: https://patentgrep.com/patent/US20220294263A1

## CPC

- H02J 13/12: Monitoring network conditions, e.g. electrical magnitudes or operational status
- H02J 3/0012: characterised by the contingency detection means in AC networks, e.g. using phasor measurement units [PMU], synchrophasors or contingency analysis
- H02J 2103/35: Grid-level management of power transmission or distribution systems, e.g. load flow analysis or active network management
- Y04S 10/30: State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A method for ascertaining a load flow map within an AC-voltage power supply grid, wherein a plurality of grid subscribers are each arranged at a respective grid connection point in the power supply grid, includes ascertaining, by each of the plurality of grid subscribers, a respective value reflecting an individual phase angle (ϕ) of the AC voltage of the power supply grid at the respective grid connection point of each of the plurality of grid subscribers. The method also includes transmitting the respective values in the form of data from the respective plurality of grid subscribers to a superordinate data receiver; and evaluating the data and generating a load flow map based on the values reflecting the individual phase angles (ϕ).

## Claims

### Claim 1

A method for ascertaining a load flow map within a power supply grid, wherein a plurality of grid subscribers are each arranged at a respective grid connection point in the power supply grid, comprising:
ascertaining, by each of the plurality of grid subscribers, a respective value reflecting an individual phase angle (ϕ) of an AC voltage of the power supply grid at the respective grid connection point of each of the plurality of grid subscribers;
transmitting the respective values in the form of data from the respective plurality of grid subscribers to a superordinate data receiver; and
evaluating the data and generating a load flow map based on the values reflecting the individual phase angles (ϕ).

### Claim 2 (depends on 1)

The method as claimed in claim 1, wherein ascertaining the respective values reflecting the individual phase angles (ϕ) of the AC voltage of the power supply grid at the respective grid connection points comprises:
providing a reference signal containing a reference time assigned to a reference phase angle (ϕr) of an AC voltage in the power supply grid at a reference point;
receiving, by each of the plurality of grid subscribers, the reference signal;
ascertaining, by the plurality of grid subscribers, the respective individual phase angles (ϕ) of the AC voltage of the power supply grid at the respective grid connection points;
comparing the respective individual phase angle (ϕ) with the reference phase angle (ϕr), and ascertaining a respective phase shift (Δϕ) between the respective individual phase angle (ϕ) and the reference phase angle (ϕr) as the transmitted value reflecting the individual phase angle (ϕ) of the AC voltage of the power supply grid at the respective grid connection point.

### Claim 3 (depends on 2)

The method as claimed in claim 2, wherein the reference signal is provided by a reference signal transmitter connected to a superordinate section of the power supply grid with respect to the plurality of grid subscribers, and the method further comprising determining the reference phase angle (ϕr) based on an AC voltage in the superordinate section of the power supply grid.

### Claim 4 (depends on 2)

The method as claimed in claim 2, wherein the reference signal is provided by a reference signal transmitter, wherein the reference signal transmitter receives the plurality of phase shifts (Δϕ) from a superordinate data receiver and averages the plurality of phase shifts (Δϕ) in order to determine the reference phase angle (ϕr).

### Claim 5 (depends on 2)

The method as claimed in claim 2, wherein the determination of the reference phase angle (ϕr) and the individual phase angles (ϕ) comprises receiving a time signal from the reference signal transmitter and the respective plurality of grid subscribers.

### Claim 6 (depends on 1)

The method as claimed in claim 1, wherein ascertaining the respective value reflecting the individual phase angle (ϕ) of the AC voltage of the power supply grid at the respective grid connection point comprises:
providing a time signal that defines an absolute and common time for the power supply grid;
receiving the time signal from a reference signal transmitter and from the plurality of grid subscribers;
ascertaining a reference time which reflects a reference phase angle (ϕr) of an AC voltage in the power supply grid at the reference signal transmitter;
ascertaining, by the plurality of grid subscribers, a respective individual phase time which reflects an individual phase angle (ϕ) of the AC voltage of the power supply grid at the respective grid connection point for each of the plurality of grid subscribers;
transmitting the reference time and the individual phase times to the superordinate data receiver;
ascertaining a respective individual phase shift (Δϕ) based on the reference time and the individual phase times for each of the plurality of grid subscribers;
wherein the load flow map is generated based on the individual phase shifts (Δϕ).

### Claim 7 (depends on 5)

The method as claimed in claim 5, wherein the time signal is a GPS signal.

### Claim 8 (depends on 1)

The method as claimed in claim 1, wherein ascertaining the respective value reflecting the individual phase angles (ϕ) of the AC voltage of the power supply grid at the respective grid connection points of the plurality of grid subscribers comprises:
ascertaining, by each of the plurality of grid subscribers, an individual phase angle (ϕ) reflecting the AC voltage of the power supply grid at the respective grid connection points;
averaging the individual phase angles (ϕ) for each of the plurality of grid subscribers over a predetermined period of time and establishing an average value as an individual phase reference angle; and
ascertaining a respective individual phase shift (Δϕ) based on the individual phase reference angle and each of the respective individual phase angles;
wherein the load flow map is generated based on the individual phase shifts (Δϕ).

### Claim 9 (depends on 8)

The method as claimed in claim 8, wherein averaging the individual phase angles (ϕ), establishing an average value as the individual phase reference angle, and ascertaining the respective individual phase shifts (Δϕ) at the plurality of grid connection points are performed, whereupon the ascertained respective phase shifts (Δϕ) are transmitted to the superordinate data receiver.

### Claim 10 (depends on 8)

The method as claimed in claim 8, further comprising transmitting the individual phase angles (ϕ) from the respective plurality of grid connection points to the superordinate data receiver, and thereupon averaging the individual phase angles (ϕ), establishing an average value as the individual phase reference angle, and ascertaining the respective phase shifts (Δϕ) is performed in the superordinate data receiver.

### Claim 11 (depends on 1)

The method as claimed in claim 1, further comprising sending characteristic geographic coordinates of each of the plurality of grid subscribers to the superordinate data receiver.

### Claim 12 (depends on 11)

The method as claimed in claim 11, wherein the time signal is a GPS signal, and wherein the characteristic geographic coordinates are ascertained from the GPS signal.

### Claim 13 (depends on 11)

The method as claimed in claim 11, wherein ascertaining the respective values reflecting the individual phase angles (ϕ) of the AC voltage of the power supply grid at the respective grid connection points comprises:
providing a reference signal containing a reference time assigned to a reference phase angle (ϕr) of an AC voltage in the power supply grid at a reference point;
receiving, by each of the plurality of grid subscribers, the reference signal;
ascertaining, by the plurality of grid subscribers, the respective individual phase angles (ϕ) of the AC voltage of the power supply grid at the respective grid connection points;
comparing the respective individual phase angle (ϕ) with the reference phase angle (ϕr), and ascertaining a respective phase shift (Δϕ) between the respective individual phase angle (ϕ) and the reference phase angle (ϕr) as the transmitted value reflecting the individual phase angle (ϕ) of the AC voltage of the power supply grid at the respective grid connection point,
wherein, in the load flow map, the phase shifts (Δϕ) received or determined by the superordinate data receiver are assigned to the characteristic geographic coordinates.

### Claim 14 (depends on 1)

The method as claimed in claim 1, wherein ascertaining the respective values reflecting the individual phase angles (ϕ) of the AC voltage of the power supply grid at the respective grid connection points comprises:
providing a reference signal containing a reference time assigned to a reference phase angle (ϕr) of an AC voltage in the power supply grid at a reference point;
receiving, by each of the plurality of grid subscribers, the reference signal;
ascertaining, by the plurality of grid subscribers, the respective individual phase angles (ϕ) of the AC voltage of the power supply grid at the respective grid connection points;
comparing the respective individual phase angle (ϕ) with the reference phase angle (ϕr), and ascertaining a respective phase shift (Δϕ) between the respective individual phase angle (ϕ) and the reference phase angle (ϕr) as the transmitted value reflecting the individual phase angle (ϕ) of the AC voltage of the power supply grid at the respective grid connection point,
wherein, in the load flow map, the phase shifts (Δϕ) received by the superordinate data receiver are assigned to structural coordinates of the power supply system.

### Claim 15 (depends on 2)

The method as claimed in claim 2, wherein for ascertaining the phase shift (Δϕ), a component caused by transformer vector groups or systems for power factor correction that are arranged between any of the plurality of grid connection points of the grid subscribers and the superordinate section of the power supply grid are ignored.

### Claim 16 (depends on 2)

The method as claimed in claim 2, wherein for determining the phase shift (Δϕ), any component stemming from the reference phase angle (ϕr) and the individual phase angle (ϕ) being determined on different phase conductors of the power supply grid are ignored.

### Claim 17 (depends on 1)

The method as claimed in claim 1, wherein ascertaining the respective value reflecting the individual phase angles (ϕ) of the AC voltage of the power supply grid at the respective grid connection points comprises measuring a grid voltage.

### Claim 18 (depends on 17)

The method as claimed in claim 17, further comprising compensating for an influence of the amplitude of the grid voltage on the determined value of the phase shifts (Δϕ).

### Claim 19 (depends on 1)

An arrangement of a plurality of grid subscribers and of at least one reference signal transmitter configured to ascertain a load flow map within a power supply grid, wherein the plurality of grid subscribers and the reference signal transmitter are configured to perform a method as claimed in claim 1.
