# US 2022/0294194 A1 · Power distribution device, power distribution trailer, electric drive system and operation method thereof

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0294194 A1
- Document ID: US20220294194A1
- Status: Published application
- Kind: A1
- Application number: 17/245,989
- Filed: 2021-04-30
- Published: 2022-09-15
- Earliest claimed: 2021-03-10
- Assignees: Yantai Jereh Petroleum Equipment & Technologies Co., Ltd.
- Applicants: Yantai Jereh Petroleum Equipment & Technologies Co., Ltd.
- Inventors: Huijuan CAO; Yannan LIU; Tao KOU; Honly WANG; Ligong WU; Dekun TIAN; Libin ZHOU
- Web page: https://patentgrep.com/patent/US20220294194A1

## CPC

- H02B 7/06: Distribution substations, e.g. for urban network (H02B7/01 takes precedence)
- H02B 13/035: Gas-insulated switchgear
- H02B 1/202: {Cable lay-outs}
- H02B 1/30: Cabinet-type casings; Parts thereof or accessories therefor
- H02H 1/0007: {concerning the detecting means (in general G01R or other subclasses of G01; reed switches H01H71/2445)}
- H02H 7/222: {for switches}
- Y02B 70/30: Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B 90/20: Smart grids as enabling technology in buildings sector (smart grids supporting the management or operation of end-user stationary applications in general, or like technologies with no associated climate change mitigation effect Y04S20/00)
- Y04S 20/12: Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages
- Y04S 20/248: UPS systems or standby or emergency generators
- Y04S 40/12: characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- H02B: BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02H: EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS (indicating or signalling undesired working conditions G01R, e.g. G01R31/00, G08B; locating faults along lines G01R31/08; emergency protective devices H01H)
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A power distribution device, a power distribution trailer, an electric drive system and an operation method of the electric drive system are provided, the power distribution device includes: a starting power source, a switchgear room, and a tool room sequentially arranged along a first direction, the switchgear room includes a power inlet-line cabinet and a load feed outlet-line cabinet that are sequentially arranged along the first direction; at least one of the power inlet-line cabinet and the load feed outlet-line cabinet is a gas insulated switch cabinet, a cable terminal of at least one gas insulated switch cabinet is provided with a cable crimping copper bar, the gas insulated switch cabinet is matched with the cable crimping copper bar, a common cold shrinkable terminal connector can be combined with the cable crimping copper bar to realize the connection of an external device to the gas insulated switch cabinet through the cold shrinkable terminal connector.

## Claims

### Claim 1

A power distribution device, comprising: a starting power source, a switchgear room, and a tool room sequentially arranged along a first direction, wherein:
the switchgear room comprises a power inlet-line cabinet and a load feed outlet-line cabinet that are sequentially arranged along the first direction;
at least one of the power inlet-line cabinet and the load feed outlet-line cabinet is a gas insulated switch cabinet, and a cable terminal of at least one gas insulated switch cabinet is provided with a cable crimping copper bar.

### Claim 2 (depends on 1)

The power distribution device according to claim 1, wherein the power inlet-line cabinet comprises a first power inlet-line cabinet and a second power inlet-line cabinet; and the load feed outlet-line cabinet comprises a first load feed outlet-line cabinet, a second load feed outlet-line cabinet, and a third load feed outlet-line cabinet.

### Claim 3 (depends on 2)

The power distribution device according to claim 2, wherein the first power inlet-line cabinet is the gas insulated switch cabinet, a cable terminal of the first power inlet-line cabinet comprises a first cable terminal and a second cable terminal that are arranged oppositely along a second direction, the first power inlet-line cabinet is configured to be connected to a first power source through the first cable terminal or the second cable terminal, and the second direction is parallel to a plane where the switchgear room is located and is perpendicular to the first direction.

### Claim 4 (depends on 3)

The power distribution device according to claim 3, wherein at least one of the first cable terminal and the second cable terminal is provided with the cable crimping copper bar, and the first power inlet-line cabinet is configured to be electrically connected to the first power source through the cable crimping copper bar.

### Claim 5 (depends on 3)

The power distribution device according to claim 3, wherein the second power inlet-line cabinet is the gas insulated switch cabinet, and a cable terminal of the second power inlet-line cabinet comprises a third cable terminal and a fourth cable terminal that are arranged oppositely along the second direction, the second power inlet-line cabinet is configured to be connected to a second power source through the third cable terminal or the fourth cable terminal.

### Claim 6 (depends on 5)

The power distribution device according to claim 5, wherein at least one of the third cable terminal and the fourth cable terminal is provided with the cable crimping copper bar, and the second power inlet-line cabinet is configured to be electrically connected to the second power source through the cable crimping copper bar.

### Claim 7 (depends on 5)

The power distribution device according to claim 5, wherein:
each of the first load feed outlet-line cabinet, the second load feed outlet-line cabinet, and the third load feed outlet-line cabinet is the gas insulated switch cabinet;
each of a cable terminal of the first load feed outlet-line cabinet, a cable terminal of the second load feed outlet-line cabinet, and a cable terminal of the third load feed outlet-line cabinet is provided with the cable crimping copper bar, and is configured to be electrically connected to a load equipment through the cable crimping copper bar.

### Claim 8 (depends on 1)

The power distribution device according to claim 1, further comprising at least one of a temperature adjustment component and an alarm component in the switchgear room, wherein:
the temperature adjustment component is configured to adjust temperature of the switchgear room; and
the alarm component is configured to generate an alarm signal in a case where a fire occurs.

### Claim 9 (depends on 1)

The power distribution device according to claim 1, wherein the tool room is a cable storage room, the cable storage room has a plurality of cables and a cable reel, the plurality of cables are on a same cable reel, the cable reel is provided with a partition, the partition separates the plurality of cables, and fixes a cable terminal of each of the plurality of cables.

### Claim 10 (depends on 1)

The power distribution device according to claim 1, further comprising a bus-line voltage mutual inductor cabinet, wherein the power inlet-line cabinet and the load feed outlet-line cabinet are both provided with a protection relay, and the bus-line voltage mutual inductor cabinet is configured to provide voltage signals to the protection relays of the power inlet-line cabinet and the load feed outlet-line cabinet.

### Claim 11 (depends on 1)

A power distribution trailer, comprising: the power distribution device according to claim 1 and a movable trailer, wherein the power distribution device is on a bearing surface of the movable trailer.

### Claim 12 (depends on 11)

An electric drive system, comprising the power distribution trailer according to claim 11, a first power source, and a load equipment, wherein the first power source is on a first side surface of the power distribution trailer, and the load equipment is on a second side surface of the distribution trailer, the first side surface and the second side surface are opposite surfaces.

### Claim 13 (depends on 12)

The power distribution device according to claim 12, further comprising a second power source, wherein the second power source is on the movable trailer and on a side of the starting power source away from the switchgear room.

### Claim 14 (depends on 12)

The power distribution device according to claim 12, wherein the load equipment comprises an electric drive fracturing equipment.

### Claim 15 (depends on 12)

An operation method of an electric drive system according to claim 12, wherein:
the electric drive system further comprises a second power source, and the power inlet-line cabinet comprises a first power inlet-line cabinet connected to the first power source, and a second power source inlet-line cabinet connected to the second power source, the first power source comprises a first generator outlet switch and a first synchronization device, the first power inlet-line cabinet comprises a first power inlet-line circuit breaker, and the second power source comprises a second generator outlet switch and a second synchronization device, and the second power inlet-line cabinet comprises a second power inlet-line circuit breaker,
the operation method comprises: allowing at least one of the first power source and the second power to operate,
in a case where only the first power source operates: allowing the first generator outlet switch to be in an open state, closing the first power inlet-line circuit breaker, and then closing the first generator outlet switch synchronously through the first synchronous device.

### Claim 16 (depends on 15)

The operation method according to claim 15, wherein in a case where only the second power source operates: allowing the second generator outlet switch to be in an open state, closing the second power inlet-line circuit breaker, and then closing the second generator outlet switch synchronously through the second synchronous device.

### Claim 17 (depends on 15)

The operation method according to claim 15, wherein in a case where both the first power source and the second power source operate:
connecting a close state of the first power inlet-line circuit breaker in series with a close circuit of the first generator outlet switch, and connecting an open state of the first generator outlet switch in series with a close circuit of the first power inlet-line circuit breaker; and
connecting a close state of the second power inlet-line circuit breaker in series with a close circuit of the second generator outlet switch, and connecting an open state of the second generator outlet switch in series with a close circuit of the second power inlet-line circuit breaker.

### Claim 18 (depends on 17)

The operation method according to claim 17, wherein in a case where both the first power source and the second power source operate normally, and the first power source suddenly stops operating:
performing a protection fault action to jump the first power inlet-line circuit breaker first; after the fault is resolved, allowing the first power source to be parallel to a bus line of the power distribution device, separating the first generator outlet switch, closing the first power inlet-line circuit breaker, and closing the first generator outlet switch synchronously through the first synchronization device; or,
performing a protection fault action to jump the first generator outlet switch; after the fault is resolved, allowing the first power source to be parallel to a bus line of the power distribution device, and closing the first generator outlet switch synchronously through the first synchronization device.

### Claim 19 (depends on 17)

The operation method according to claim 17, wherein in a case where both the first power source and the second power source operate normally, and the second power source suddenly stops operating:
performing a protection fault action to jump the second power inlet-line circuit breaker first; after the fault is resolved, allowing the second power source to be parallel to a bus line of the power distribution device, separating the second generator outlet switch, closing the second power inlet-line circuit breaker, and closing the second generator outlet switch synchronously through the second synchronization device; or,
performing a protection fault action to jump the second generator outlet switch; after the fault is resolved, allowing the second power source to be parallel to a bus line of the power distribution device, and closing the second generator outlet switch synchronously through the second synchronization device.

### Claim 20 (depends on 15)

The operation method according to claim 15, wherein:
the load equipment comprises a first load equipment and a second load equipment, and the load feed outlet-line cabinet comprises a first load feed outlet-line cabinet, a second load feed outlet-line cabinet, and a third load feed outlet-line cabinet; the first load equipment is connected to a circuit in the first load feed outlet-line cabinet, the second load device is connected to a circuit in the second load feed outlet-line cabinet, and the third load feed outlet-line cabinet is a spare load feed outlet-line cabinet,
in a case where the first load feed outlet-line cabinet has a fault, the first load equipment is connected to a circuit in the third load feed outlet-line cabinet; or,
in a case where the second load feed outlet-line cabinet has a fault, the second load equipment is connected to the circuit in the third load feed outlet-line cabinet.