# US 2022/0292523 A1 · Prediction system and prediction method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0292523 A1
- Document ID: US20220292523A1
- Status: Published application
- Kind: A1
- Application number: 17/692,311
- Filed: 2022-03-11
- Published: 2022-09-15
- Earliest claimed: 2021-03-11
- Assignees: Toyota Jidosha Kabushiki Kaisha
- Applicants: Toyota Jidosha Kabushiki Kaisha
- Inventors: Taiga YAMADA; Toru KIDOKORO; Takao IURA; Takashi SHIBATA
- Web page: https://patentgrep.com/patent/US20220292523A1

## CPC

- G06Q 30/018: Certifying business or products
- G06Q 50/26: Government or public services (business processes related to the transportation industry G06Q50/40)
- G06N 20/00: Machine learning
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS

## Abstract

An information collection server obtains relevant information relating to legislation, regulations, or standards (vehicle emissions control) from an external server group and a local server and provides the obtained relevant information to an information processing server. When the information processing server receives the relevant information from the information collection server, it performs conversion processing on each piece of information included in the relevant information in accordance with each piece of information to convert each piece of information into an index relating to a degree of influence on revision of the emissions control. The information processing server provides each resultant index to a prediction creation server. When the prediction creation server receives each resultant index from the information processing server, it predicts a stage of revision of the emissions control based on each index.

## Claims

### Claim 1

A prediction system comprising:
a first device that collects relevant information relating to revision of legislation, regulations, or standards;
a second device that performs predetermined conversion processing for converting the relevant information into an index relating to a degree of influence on the revision; and
a third device that predicts based on the index, a stage of the revision or properness of negotiation timing relating to the revision.

### Claim 2 (depends on 1)

The prediction system according to claim 1, wherein
the third device includes a first trained model trained through machine learning,
the first trained model is trained through training processing using a first training data set to provide the stage of the revision or the properness in response to an input, and
the first training data set includes a plurality of pieces of training data obtained by labeling the index with the stage of the revision or the properness.

### Claim 3 (depends on 1)

The prediction system according to claim 1, wherein
the relevant information includes prescribed information determined as motiving the revision.

### Claim 4 (depends on 3)

The prediction system according to claim 3, wherein
the prescribed information includes first information representing a result of observation of atmospheric pollution.

### Claim 5 (depends on 4)

The prediction system according to claim 4, wherein
the second device converts to the index, by using a predetermined first function, an average value for a first prescribed period of values shown in the first information.

### Claim 6 (depends on 5)

The prediction system according to claim 5, wherein
the second device sets as the index, a difference between the average value for the first prescribed period of the values shown in the first information and an average value for the first prescribed period of values shown in the first information in a previous year.

### Claim 7 (depends on 4)

The prediction system according to claim 4, wherein
the second device
calculates every second prescribed period, an excess over a reference value, of a value shown in the first information, and
sets an integrated value of excesses for a third prescribed period as the index, the third prescribed period being longer than the second prescribed period.

### Claim 8 (depends on 7)

The prediction system according to claim 7, wherein
the second device sets as the index, the number of second prescribed periods during which the value shown in the first information exceeds the reference value.

### Claim 9 (depends on 3)

The prediction system according to claim 3, wherein
the prescribed information includes second information which is information on media reports or research reports about atmospheric pollution.

### Claim 10 (depends on 9)

The prediction system according to claim 9, wherein
the second device includes a second trained model trained through machine learning,
the second trained model is trained through training processing using a second training data set to provide information representing a degree of influence on the revision in response to an input,
the second training data set includes a plurality of pieces of training data obtained by labeling information on a predetermined item with information representing the degree of influence, and
the second device
performs prescribed processing to extract the information on the predetermined item from the second information,
sets the information on the predetermined item as an input to the second trained model,
converts the information representing the degree of influence provided from the second trained model into a point by using a predetermined second function, and
sets an average value of points for a fourth prescribed period as the index.

### Claim 11 (depends on 1)

The prediction system according to claim 1, wherein
the relevant information includes third information representing an economic index of a target country to which the legislation, regulations, or standards is/are applied.

### Claim 12 (depends on 1)

The prediction system according to claim 1, wherein
the relevant information includes fourth information representing a date of revision of current legislation, regulations, or standards, and
the second device
calculates a period elapsed since revision of the current legislation, regulations, or standards based on the fourth information, and
sets the elapsed period as the index.

### Claim 13 (depends on 1)

The prediction system according to claim 1, wherein
the relevant information includes fifth information representing a control level under the legislation, regulations, or standards,
a target country is a country to which the legislation, regulations, or standards is/are applied, and
the second device
calculates, by using the fifth information, a difference between a level of the legislation, regulations, or standards and a level of legislation, regulations, or standards corresponding to the legislation, regulations, or standards in a country set as a model case by the target country, and
sets the difference as the index.

### Claim 14

A prediction method comprising:
collecting relevant information relating to revision of legislation, regulations, or standards;
performing predetermined conversion processing for converting the relevant information into an index relating to a degree of influence on the revision; and
predicting a stage of the revision or properness of negotiation timing relating to the revision based on the index.
