# US 2022/0292408 A1 · Ensemble forecast storm damage response system for critical infrastructure

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0292408 A1
- Document ID: US20220292408A1
- Status: Published application
- Kind: A1
- Application number: 17/831,752
- Filed: 2022-06-03
- Published: 2022-09-15
- Earliest claimed: 2018-04-09
- Assignees: Florida Power & Light Company
- Applicants: Florida Power & Light Company
- Inventors: Paul R. Hynes; Matthew R. Moxley; Jason S. Price; Thomas W. Gwaltney; Iliana M. Rentz; Jose Luis Medina
- Web page: https://patentgrep.com/patent/US20220292408A1

## CPC

- G06N 20/20: Ensemble learning
- G01W 1/10: Devices for predicting weather conditions (computers per se G06; display devices G09)
- G06F 16/25: Integrating or interfacing systems involving database management systems
- G06N 7/01: Probabilistic graphical models, e.g. probabilistic networks
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G01W: METEOROLOGY (radar, sonar, lidar or analogous systems, designed for meteorological use G01S13/95, G01S15/88, G01S17/95)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A storm damage response system includes a storm ensemble database that stores ensemble forecast models associated with potential storm paths of a storm across a geographic area and an inventory database that stores inventory data associated with location and characteristics of power-providing equipment in the geographic area. A storm damage model algorithm generates a storm response plan comprising an operational procedure for repairing or maintaining power transmission and distribution electric systems to mitigate storm damage impact based on generating a probabilistic model for each of the ensemble forecast models based on the inventory data and calculating a statistical impact value associated with the probabilistic model based on an aggregate of iterative probabilistic simulations for the respective ensemble forecast model. The storm response plan can be generated based on the relative statistical impact value of the probabilistic model of each of the ensemble forecast models.

## Claims

### Claim 1

A storm damage response system comprising:
a storm ensemble database configured to store a plurality of ensemble forecast models associated with respective potential storm paths of a given storm across a geographic area, as provided from and updated by a weather forecasting service;
an inventory database configured to store inventory data associated with location and characteristics associated with power-providing equipment in the geographic area with respect to power generator systems; and
a storm damage model control system configured to implement a storm damage model algorithm to generate a predictive storm response plan comprising an operational procedure for repairing or maintaining the power generator systems to mitigate storm damage impact, the storm damage model algorithm being configured to generate a probabilistic model for each of the plurality of ensemble forecast models based on the inventory data and to calculate a statistical impact value associated with the probabilistic model based on an aggregate of a plurality of iterative probabilistic simulations for the probabilistic model associated with the respective one of the plurality of ensemble forecast models, the storm damage model control system being configured to generate the predictive storm response plan based on the relative statistical impact value of the probabilistic model of each of the plurality of ensemble forecast models.

### Claim 2 (depends on 1)

The system of claim 1, wherein the inventory data comprises vegetation data, the vegetation data comprising geographic locations and characteristics of each of a plurality of greenery regions in the geographic area, the characteristics of each of the greenery regions comprising a relationship of the respective one of the greenery regions with location and characteristics associated with power-providing equipment in the geographic area.

### Claim 3 (depends on 2)

The system of claim 2, wherein the inventory data comprises maintenance data, the maintenance data comprising information corresponding to at least one of when the power-providing equipment was last repaired or maintained, a current state of repair, a proximity or relationship with features of the geographic area, and times of last trimming of trees that are proximal to the power-providing equipment.

### Claim 4 (depends on 1)

The system of claim 1, wherein the storm damage model control system is configured to receive actual windspeed data corresponding to measured actual windspeed from a past storm and damage assessment data corresponding to actual damage to the power-providing equipment resulting from the past storm at the measured actual windspeed, wherein the storm damage model algorithm is configured to generate the probabilistic model for each of the plurality of ensemble forecast models based on the inventory data, the actual windspeed data, and the damage assessment data.

### Claim 5 (depends on 1)

The system of claim 1, wherein the storm damage model control system comprises a model generator configured to generate the probabilistic model associated with each of the plurality of ensemble forecast models, the probabilistic model comprising probabilistic data associated with operational failure of the power-providing equipment, as defined by the inventory data, based on a portion of the geographic area that is associated with the potential storm path of the respective one of the plurality of ensemble forecast models, wherein the storm damage model control system is further configured to assign a predetermined percentage of failure of each of at least a portion of the power-providing equipment over a range of storm characteristics based on maintenance data of the power-providing equipment associated with the inventory data, wherein the maintenance data comprises information corresponding to at least one of when the power-providing equipment was last repaired or maintained, a current state of repair, and a proximity or relationship with features of the geographic area, wherein the probabilistic data is generated based on the predetermined percentage of failure of each of the at least a portion of the power-providing equipment with respect to the given storm.

### Claim 6 (depends on 5)

The system of claim 5, wherein the storm damage model control system further comprises a simulator system configured to implement the plurality of iterative probabilistic simulations on the probabilistic model associated with each of the plurality of ensemble forecast models to generate the statistical impact value for the respective probabilistic model based on the plurality of iterative probabilistic simulations, the statistical impact value being indicative of a cost-based resource allocation estimate based on the probabilistic data associated with the operational failure of the power-providing equipment relative to at least one of time, cost, resource availability, and storm severity constraints.

### Claim 7 (depends on 6)

The system of claim 6, wherein the storm damage model control system further comprises:
a scenario comparator configured to select the probabilistic model associated with a respective one of the plurality of ensemble forecast models based on the statistical impact value; and
a plan generator configured to generate the predictive storm response plan based on the inventory data associated with the selected probabilistic model, the predictive storm response plan comprises:
an operational level response plan associated with the selected probabilistic model, the operational response level plan comprising geographic-based resource allocation and inventory repair action plans based on the inventory data and the respective one of the plurality of ensemble forecast models; and
an executive level response plan comprising a total estimated resources and an estimated timeline for providing recovery for affected customer outages resulting from the storm damage impact with respect to the power generator systems based on an aggregate impact scenario associated with the plurality of ensemble forecast models.

### Claim 8 (depends on 1)

The system of claim 1, wherein the statistical impact value is indicative of a cost-based resource allocation estimate based on the probabilistic data associated with the operational failure of the power-providing equipment relative to time, cost, resource availability, and storm severity constraints, wherein the system further comprises a scenario comparator configured to select the probabilistic model associated with a respective one of the plurality of ensemble forecast models based on the statistical impact value associated with each of the plurality of ensemble forecast models to generate the predictive storm response plan.

### Claim 9 (depends on 8)

The system of claim 8, wherein the scenario comparator is configured to select the probabilistic model based on a predetermined set of criteria, wherein the predetermined set of criteria comprises a weighted importance associated with at least one of the time, the cost, and the resource availability associated with the statistical impact value.

### Claim 10

A method for generating a storm response plan comprising an operational procedure for repairing or maintaining power generator systems to mitigate storm damage impact, the method comprising:
providing a plurality of ensemble forecast models associated with respective potential storm paths of a given storm across a geographic area via a storm ensemble database;
providing inventory data associated with location and characteristics associated with power-providing equipment in the geographic area with respect to the power generator systems via an inventory database;
providing actual windspeed data corresponding to measured actual windspeed from a past storm;
providing damage assessment data corresponding to actual damage to the power-providing equipment resulting from the past storm at the measured actual windspeed;
generating a probabilistic model for each of the plurality of ensemble forecast models, the probabilistic model comprising probabilistic data associated with operational failure of the power-providing equipment, as defined by the inventory data, based on a portion of the geographic area that is associated with the potential storm path of the respective one of the plurality of ensemble forecast models and based on the actual windspeed data and the damage assessment data;
implementing a plurality of iterative probabilistic simulations for the probabilistic model associated with each of the plurality of ensemble forecast models;
calculating a statistical impact value associated with the probabilistic model associated with each of the plurality of ensemble forecast models;
generating the storm response plan based on the relative statistical impact value of the probabilistic model of each of the plurality of ensemble forecast models; and
publishing the storm response plan to at least one organization associated with the power generator systems to disseminate at least a portion of the operational procedure to each of the at least one organization.

### Claim 11 (depends on 10)

The method of claim 10, wherein generating the storm recover plan comprises:
generating an operational level response plan comprising geographic-based resource allocation and inventory repair action plans; and
generating an executive level response plan comprising a total resource cost and a timeline for providing recovery for affected customer outages resulting from the storm damage impact with respect to the power generator systems.

### Claim 12 (depends on 10)

The method of claim 10, wherein providing the inventory data comprises providing vegetation data, the vegetation data comprising geographic locations and characteristics of each of a plurality of greenery regions in the geographic area, the characteristics of each of the greenery regions comprising a relationship of the respective one of the greenery regions with location and characteristics associated with power-providing equipment in the geographic area.

### Claim 13 (depends on 10)

The method of claim 10, wherein calculating the statistical impact value comprises calculating the statistical impact value to be indicative of a cost-based resource allocation estimate based on the probabilistic data associated with the operational failure of the power-providing equipment relative to at least one of time, cost, resource availability, and storm severity constraints.

### Claim 14 (depends on 10)

The method of claim 10, further comprising assigning a predetermined percentage of failure of each of at least a portion of the power-providing equipment over a range of storm characteristics based on maintenance data of the power-providing equipment associated with the inventory data, wherein the maintenance data comprises information corresponding to at least one of when the power-providing equipment was last repaired or maintained, a current state of repair, and a proximity or relationship with features of the geographic area, wherein generating the probabilistic model comprises generating the probabilistic data based on the predetermined percentage of failure of each of the at least a portion of the power-providing equipment with respect to the given storm.

### Claim 15

A storm damage response system comprising:
a storm ensemble database configured to store a plurality of ensemble forecast models associated with respective potential storm paths of a given storm across a geographic area;
an inventory database configured to store inventory data associated with location and characteristics associated with power-providing equipment in the geographic area with respect to power generator systems, the inventory data comprising vegetation data, the vegetation data comprising geographic locations and characteristics of each of a plurality of greenery regions in the geographic area, the characteristics of each of the greenery regions comprising a relationship of the respective one of the greenery regions with location and characteristics associated with power-providing equipment in the geographic area;
a storm damage model control system configured to implement a storm damage model algorithm to generate a storm response plan comprising an operational procedure for repairing or maintaining the power generator systems to mitigate storm damage impact, the storm damage model algorithm being configured to generate a probabilistic model for each of the plurality of ensemble forecast models based on a predetermined percentage of failure of each of the at least a portion of the power-providing equipment with respect to the given storm, and to calculate a statistical impact value associated with the probabilistic model based on an aggregate of a plurality of iterative probabilistic simulations for the probabilistic model associated with the respective one of the plurality of ensemble forecast models, the storm damage model control system being configured to generate the storm response plan based on the relative statistical impact value of the probabilistic model of each of the plurality of ensemble forecast models, the storm response plan comprising an operational level response plan comprising geographic-based resource allocation and inventory repair action plans and an executive level response plan comprising a total resource cost and a timeline for providing recovery for affected customer outages resulting from the storm damage impact with respect to the power generator systems.

### Claim 16 (depends on 15)

The system of claim 15, further comprising a response plan reporting system configured to publish the storm response plan to a plurality of organizations associated with the power generator systems to disseminate at least a portion of the operational procedure to each of the plurality of organizations.

### Claim 17 (depends on 15)

The system of claim 15, wherein the storm ensemble database is configured to store the plurality of ensemble forecast models as at least one of simulated and historical storms associated with the geographic area to provide the storm response plan as a prophylactic maintenance plan for the power generator systems.

### Claim 18 (depends on 15)

The system of claim 15, wherein the storm damage model control system comprises a model generator configured to generate the probabilistic model associated with each of the plurality of ensemble forecast models, the probabilistic model comprising probabilistic data associated with operational failure of the power-providing equipment, as defined by the inventory data, based on a portion of the geographic area that is associated with the potential storm path of the respective one of the plurality of ensemble forecast models.

### Claim 19 (depends on 18)

The system of claim 18, wherein the storm damage model control system further comprises a simulator system configured to implement the plurality of iterative probabilistic simulations on the probabilistic model associated with each of the plurality of ensemble forecast models to generate the statistical impact value for the respective probabilistic model based on the plurality of iterative probabilistic simulations, the statistical impact value being indicative of a cost-based resource allocation estimate based on the probabilistic data associated with the operational failure of the power-providing equipment relative to at least one of time, cost, resource availability, and storm severity constraints.

### Claim 20 (depends on 15)

The system of claim 15, wherein the storm damage model control system is configured to receive actual windspeed data corresponding to measured actual windspeed from a past storm and damage assessment data corresponding to actual damage to the power-providing equipment resulting from the past storm at the measured actual windspeed, wherein the storm damage model algorithm is configured to generate the probabilistic model for each of the plurality of ensemble forecast models based on the inventory data, the actual windspeed data, and the damage assessment data.