# US 2022/0291419 A1 · Methods and systems for monitoring wellbore integrity throughout a wellbore lifecycle using modeling techniques

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0291419 A1
- Document ID: US20220291419A1
- Status: Published application
- Kind: A1
- Application number: 17/691,181
- Filed: 2022-03-10
- Published: 2022-09-15
- Earliest claimed: 2021-03-11
- Assignees: Saudi Arabian Oil Company
- Applicants: Saudi Arabian Oil Company
- Inventors: Arpita P. Bathija; Timothy Eric Moellendick; Abdullah S. Yami; Hussain Albahrani
- Web page: https://patentgrep.com/patent/US20220291419A1

## CPC

- E21B 44/00: Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
- E21B 47/00: Survey of boreholes or wells (monitoring pressure or flow of drilling fluid E21B21/08)
- E21B 49/003: {by analysing drilling variables or conditions (E21B49/005 takes precedence; systems specially adapted for monitoring a plurality of drilling variables or conditions E21B44/00)}
- E21B 49/006: {Measuring wall stresses in the borehole}
- G06F 30/20: Design optimisation, verification or simulation (optimisation, verification or simulation of circuit designs G06F30/30)
- E21B 21/00: Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor (freeing objects stuck in boreholes by flushing E21B31/03)
- E21B 34/02: in well heads
- E21B 43/20: Displacing by water
- E21B 47/005: Monitoring or checking of cementation quality or level
- E21B 2200/20: Computer models or simulations, e.g. for reservoirs under production, drill bits
- G06F 2113/08: Fluids
- G06F 2119/02: Reliability analysis or reliability optimisation; Failure analysis, e.g. worst case scenario performance, failure mode and effects analysis [FMEA]
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

Embodiments provided herein include systems and methods for monitoring wellbore integrity throughout a wellbore lifecycle. These embodiments include creating an initial wellbore integrity model that determines a geomechanical stability of a wellbore for drilling, the wellbore for harvesting fluid hydrocarbons, where creating the initial wellbore integrity model includes determining the wellbore and determining first input data of a subsurface into which the wellbore is planned. Some embodiments include drilling the wellbore as s part of a drilling phase of a life cycle of the wellbore and performing drilling phase analysis. Some embodiments include determining drilling in-situ stresses of the wellbore during the drilling phase, determining a drilling phase mud window, creating an updated wellbore integrity model, and predicting from the updated wellbore integrity model whether there is a first issue with the wellbore.

## Claims

### Claim 1

A method for monitoring wellbore integrity throughout a wellbore lifecycle using modeling techniques comprising:
creating an initial wellbore integrity model that determines a geomechanical stability of a wellbore for drilling, the wellbore for harvesting fluid hydrocarbons, wherein creating the initial wellbore integrity model includes determining the wellbore and determining first input data of a subsurface into which the wellbore is planned;
drilling the wellbore, wherein drilling is part of a drilling phase of a life cycle of the wellbore, wherein the life cycle of the wellbore includes the drilling phase, a completion phase, a stimulation phase, a production phase, and an injection phase;
performing drilling phase analysis, wherein drilling phase analysis includes determining second input data associated with the wellbore;
determining drilling in-situ stresses of the wellbore during the drilling phase;
determining a drilling phase mud window;
utilizing the drilling in-situ stresses and the drilling phase mud window to create an updated wellbore integrity model;
predicting from the updated wellbore integrity model whether there is a first issue with the wellbore, wherein the updated wellbore integrity model utilizes at least one of the following: soil mechanics, fluid flow, or thermal expansion to predict the first issue;
in response to predicting the first issue with the wellbore, performing a first corrective action to the first issue;
performing a second phase of the wellbore; and
performing second phase analysis, wherein the second phase analysis includes determining third input data associated with the wellbore during at least one of the following: the completion phase, the stimulation phase, the production phase, or the injection phase.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
determining second phase in-situ stresses of the wellbore during the drilling phase;
determining a second phase mud window;
updating the updated wellbore integrity model based on the third input data, the second phase in-situ stresses, and the second phase mud window;
predicting from the updated wellbore integrity model whether there is a second issue with the wellbore during the second phase; and
in response to predicting the second issue with the wellbore, performing a second corrective action to correct the second issue.

### Claim 3 (depends on 1)

The method of claim 1, wherein the second phase includes at least one of the following:
the completion phase, the stimulation phase, the production phase, or the injection phase.

### Claim 4 (depends on 1)

The method of claim 1, wherein the first corrective action includes at least one of the following: providing computer output depicting hoop stress around the wellbore, providing computer output depicting radial stress around the wellbore, providing computer output depicting an overburden stress around the wellbore, providing computer output depicting strain distribution around the wellbore, providing computer output estimating the pressure along a depth of the wellbore, introducing fluid into the wellbore to alter mud weight of mud in the wellbore, injecting fluid into the wellbore to displace hydrocarbon and facilitate additional hydrocarbon withdraw, or determining a number of casings to place in the wellbore and a depth of a casing in the wellbore.

### Claim 5 (depends on 1)

The method of claim 1, wherein the second input data includes at least one of the following taken during the drilling phase: wellbore depth data, dimension data of a casing in the wellbore, dimension data of cement in the wellbore, minimum horizontal stress gradient data, maximum horizontal stress gradient data, overburden stress gradient data, pore pressure gradient data, fluid pressure gradient data, mud weight gradient data, seismic data, shear acoustic velocity data, compressive acoustic velocity data, porosity data, density data, elastic moduli data, Young's modulus data, Poisson's ratio data, rock strength data, or rock stress data.

### Claim 6 (depends on 1)

The method of claim 1, wherein creating the updated wellbore integrity model includes benchmarking at least one of the following: geometry, boundary conditions, and mesh distribution to publish analytical solutions, and wherein the updated wellbore integrity model includes forecasts of stimulation and production decline curves to estimate the pressure along a predetermined depth of the wellbore over time.

### Claim 7 (depends on 1)

The method of claim 1, further comprising determining a mud weight window for the wellbore along a depth of the wellbore during the drilling phase, and wherein the mud weight window is utilized to update the updated wellbore integrity model.

### Claim 8 (depends on 1)

The method of claim 1, wherein the second phase is the completion phase and wherein the third input data includes data for the completion phase, including at least one of the following: post drill hole shape data, stress distribution data, material properties of a casing in the wellbore, material properties of cement in the wellbore, fluid properties data stress data based on fluid changes and stress data independent of fluid changes.

### Claim 9 (depends on 1)

The method of claim 1, wherein the second phase is the injection phase and wherein the method further comprises determining injection in-situ stresses along a depth of the wellbore during the injection phase, wherein the injection in-situ stresses include at least one of the following: an overburden stress in the wellbore, minimum horizontal stress, maximum horizontal stress, orientation of horizontal stresses, or pore pressure.

### Claim 10 (depends on 1)

The method of claim 1, wherein performing the drilling phase analysis, determining the drilling in-situ stresses, determining the drilling phase mud window, creating the updated wellbore integrity model, and predicting whether there is the first issue with the wellbore are repeated throughout the drilling phase.

### Claim 11 (depends on 1)

The method of claim 1, further comprising updating the updated wellbore integrity model for each phase of the life cycle of the wellbore.

### Claim 12

A system for monitoring wellbore integrity throughout a wellbore lifecycle using modeling techniques comprising:
a wellbore drill for drilling a wellbore to harvest fluid hydrocarbons;
a sensor for detecting a characteristic of the wellbore;
a fluid introduction device for introducing fluid into the wellbore; and
a computing device that is coupled to the wellbore drill, wherein the computing device stores logic, that when executed by the computing device, causes the system to perform at least the following:
create an initial wellbore integrity model that determines a geomechanical stability of the wellbore for drilling, wherein creating the initial wellbore integrity model includes determining the wellbore and determining first input data of a subsurface into which the wellbore is planned, wherein at least a portion of the first input data is received from the sensor;
cause the wellbore drill to drill the wellbore, wherein drilling is part of a drilling phase of a life cycle of the wellbore, wherein the life cycle of the wellbore includes the drilling phase, a completion phase, a stimulation phase, a production phase, and an injection phase;
perform drilling phase analysis, wherein the drilling phase analysis includes determining second input data associated with the wellbore;
determine drilling in-situ stresses of the wellbore during the drilling phase;
determine a drilling phase mud window;
utilize the drilling in-situ stresses and the drilling phase mud window to create an updated wellbore integrity model;
predict from the updated wellbore integrity model whether there is a first issue with the wellbore, wherein the updated wellbore integrity model utilizes at least one of the following: soil mechanics, fluid flow, or thermal expansion to predict the first issue;
in response to predicting the first issue with the wellbore, perform a first corrective action to the first issue;
perform a second phase of the wellbore; and
perform second phase analysis, wherein the second phase analysis includes determining third input data associated with the wellbore during at least one of the following: the completion phase, the stimulation phase, the production phase, or the injection phase.

### Claim 13 (depends on 12)

The system of claim 12, wherein the logic further causes the system to perform at least the following:
determine second phase in-situ stresses of the wellbore during the drilling phase;
determine a second phase mud window;
update the updated wellbore integrity model based on the third input data, the second phase in-situ stresses, and the second phase mud window;
predict from the updated wellbore integrity model whether there is a second issue with the wellbore during the second phase; and
in response to predicting the second issue with the wellbore, perform a second corrective action to correct the second issue.

### Claim 14 (depends on 12)

The system of claim 12, further comprising a well tree that is coupled to the wellbore, the well tree including a shut-in valve to control flow of production fluids from the wellbore.

### Claim 15 (depends on 12)

The system of claim 12, wherein the sensor includes at least one of the following: a pressure sensor, a chemical sensor, an acoustic sensor, a temperature sensor, an optical sensor, or a piezoelectric sensor.

### Claim 16 (depends on 12)

The system of claim 12, wherein the second phase includes at least one of the following: the completion phase, the stimulation phase, the production phase, or the injection phase.

### Claim 17 (depends on 12)

The system of claim 12, wherein the first corrective action includes at least one of the following: providing computer output depicting hoop stress around the wellbore, providing computer output depicting radial stress around the wellbore, providing computer output depicting an overburden stress around the wellbore, providing computer output depicting strain distribution around the wellbore, providing computer output estimating the pressure along a depth of the wellbore, introducing fluid into the wellbore to alter mud weight of mud in the wellbore, injecting fluid into the wellbore to displace hydrocarbon and facilitate additional hydrocarbon withdraw, or determining a number of casings to place in the wellbore and a depth of a casing in the wellbore.

### Claim 18

A non-transitory computer-readable medium for monitoring wellbore integrity throughout a wellbore lifecycle using modeling techniques that stores logic that, when executed by a computing device, causes the computing device to perform at least the following:
create an initial wellbore integrity model that determines a geomechanical stability of a wellbore for drilling and harvesting fluid hydrocarbons, wherein creating the initial wellbore integrity model includes determining the wellbore and determining first input data of a subsurface into which the wellbore is planned;
cause a wellbore drill to drill the wellbore, wherein drilling is part of a drilling phase of a life cycle of the wellbore, wherein the life cycle of the wellbore includes the drilling phase, a completion phase, a stimulation phase, a production phase, and an injection phase;
perform drilling phase analysis, wherein the drilling phase analysis includes determining second input data associated with the wellbore;
determine drilling in-situ stresses of the wellbore during the drilling phase;
determine a drilling phase mud window;
utilize the drilling in-situ stresses and the drilling phase mud window to create an updated wellbore integrity model;
predict from the initial wellbore integrity model whether there is a first issue with the wellbore, wherein the updated wellbore integrity model utilizes at least one of the following: soil mechanics, fluid flow, or thermal expansion to predict the first issue, and wherein performing drilling phase analysis, determining drilling in-situ stresses, determining the drilling phase mud window, creating the updated wellbore integrity model, and predicting whether there is the first issue with the wellbore are repeated throughout the drilling phase;
in response to predicting the first issue with the wellbore, perform a first corrective action to the first issue;
perform a second phase of the wellbore; and
perform second phase analysis, wherein the second phase analysis includes determining third input data associated with the wellbore during at least one of the following: the completion phase, the stimulation phase, the production phase, or the injection phase,
wherein the updated wellbore integrity model is updated throughout the life cycle of the wellbore.

### Claim 19 (depends on 18)

The non-transitory computer-readable medium of claim 18, wherein the second phase includes at least one of the following: the completion phase, the stimulation phase, the production phase, or the injection phase.

### Claim 20 (depends on 18)

The non-transitory computer-readable medium of claim 18, wherein the first corrective action includes at least one of the following: providing computer output depicting hoop stress around the wellbore, providing computer output depicting radial stress around the wellbore, providing computer output depicting an overburden stress around the wellbore, providing computer output depicting strain distribution around the wellbore, providing computer output estimating the pressure along a depth of the wellbore, introducing fluid into the wellbore to alter mud weight of mud in the wellbore, injecting fluid into the wellbore to displace hydrocarbon and facilitate additional hydrocarbon withdraw, or determining a number of casings to place in the wellbore and a depth of a casing in the wellbore.
