# US 2022/0290920 A1 · Method to detect tube leakage in shell and tube thermosiphon reboilers

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0290920 A1
- Document ID: US20220290920A1
- Status: Published application
- Kind: A1
- Application number: 17/196,811
- Filed: 2021-03-09
- Published: 2022-09-15
- Earliest claimed: 2021-03-09
- Assignees: Saudi Arabian Oil Company
- Applicants: Saudi Arabian Oil Company
- Inventors: Haider A. Bashir; Mubarak F. Al-Rashid; Omar A. Dubayan
- Web page: https://patentgrep.com/patent/US20220290920A1

## CPC

- F25J 3/0295: {Start-up or control of the process; Details of the apparatus used, e.g. sieve plates, packings}
- B01D 3/322: {Reboiler specifications}
- B01D 3/4211: {of columns}
- B01D 3/4294: {Feed stream}
- G01M 3/2846: {for tubes (G01M3/30 takes precedence)}
- F25J 2280/50: Advanced process control, e.g. adaptive or multivariable control
- F28D 7/16: the conduits being arranged in parallel spaced relation ({F28D7/0008 - F28D7/0058 take precedence}; F28D7/02 - F28D7/10 take precedence)
- F28F 27/00: Control arrangements or safety devices specially adapted for heat-exchange or heat-transfer apparatus (control arrangements in general G05)
- F28F 2265/16: for preventing leakage
- F25J: LIQUEFACTION, SOLIDIFICATION OR SEPARATION OF GASES OR GASEOUS {OR LIQUEFIED GASEOUS} MIXTURES BY PRESSURE AND COLD TREATMENT {OR BY BRINGING THEM INTO THE SUPERCRITICAL STATE (cryogenic pumps F04B37/08; gas storage vessels, gas holders F17; filing vessels with, or discharging from vessels, compressed, liquefied or solidified gases F17C; refrigeration machines, plants, or systems F25B)}
- B01D: SEPARATION (separating solids from solids by wet methods B03B, B03D; by pneumatic jigs or tables B03B; by other dry methods B07; magnetic or electrostatic separation of solid materials from solid materials or fluids, separation by high-voltage electric fields B03C; centrifuges, vortex apparatus B04; presses per se for squeezing-out liquid from liquid-containing material B30B9/02; treatment of water C02F, e.g. softening by ion-exchange C02F1/42; {arrangements of air intake cleaners in gas turbine plants F02C7/05} ; arrangements or mounting of filters in air-conditioning, air-humidification or ventilation F24F13/28)
- G01M: TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- F28D: HEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT (fluid heaters having heat generating means and heat transferring means F24H; furnaces F27; details of heat-exchange apparatus of general)
- F28F: DETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION (water and air traps, air venting F16)

## Abstract

A method to continuously monitor for tube leakage in a shell and tube thermosiphon reboiler for heating feedstock in a fractionating column includes: determining the column is in service by continuously monitoring an input flow of the feedstock into the column; determining the reboiler is inactive by continuously monitoring an output valve of tube-side heating fluid from the reboiler; determining the reboiler is losing the heating fluid by continuously monitoring an output flow of the heating fluid from the reboiler; determining the reboiler is heat exchanging by continuously monitoring a temperature difference between input and output flows of shell-side bottoms fluid with the column; and determining the tube leakage in the reboiler is taking place when the column is determined to be in service, the reboiler is determined to be inactive, the reboiler is determined to be losing the heating fluid, and the reboiler is determined to be heat exchanging.

## Claims

### Claim 1

An automated method of detecting tube leakage in a shell and tube thermosiphon reboiler used to drive a fractionating column, the method comprising:
controlling, by a control circuit using process data, a fractionating process in the fractionating column using the shell and tube thermosiphon reboiler;
continuously receiving, by the control circuit, first and second data of the process data from respective first and second devices for monitoring different aspects of an input flow of feedstock into the fractionating column;
continuously determining, by the control circuit using the received first and second data, that the column is in service or not in service;
continuously receiving, by the control circuit, third and fourth data of the process data from respective third and fourth devices for monitoring different aspects of an output flow of tube-side heating fluid from the reboiler;
continuously determining, by the control circuit using the received third data, that the shell and tube thermosiphon reboiler is inactive or active;
continuously determining, by the control circuit using the received fourth data, that the reboiler is losing or not losing the heating fluid;
continuously receiving, by the control circuit, fifth and sixth data of the process data from respective fifth and sixth devices for monitoring temperatures of shell-side bottoms fluid respectively input to and output from the reboiler by a thermosiphon process in the reboiler;
continuously determining, by the control circuit using the received fifth and sixth data, that the reboiler is heat exchanging or not heat exchanging;
continuously determining, by the control circuit, that the tube leakage in the reboiler is taking place when the column is determined to be in service, the reboiler is determined to be inactive, the reboiler is determined to be losing the heating fluid, and the reboiler is determined to be heat exchanging, and is not taking place otherwise; and
generating an alert, by the control circuit, when the tube leakage in the reboiler is determined to be taking place.

### Claim 2 (depends on 1)

The method of claim 1, wherein:
the first device monitors a position of a first valve that controls a flow rate of the feedstock into the column, and outputs the monitored first valve position as the first data;
the second device monitors the flow rate of the feedstock into the column, and outputs the monitored feedstock flow rate as the second data; and
continuously determining that the column is in service comprises determining when both the received first data exceeds a first threshold and the received second data exceeds a second threshold, and is not in service otherwise.

### Claim 3 (depends on 1)

The method of claim 1, wherein:
the third device monitors a position of a second valve that controls a flow rate of the heating fluid from the tube side of the reboiler, and outputs the monitored second valve position as the third data;
continuously receiving the third data comprises setting a first start time to the present time at a beginning of the continuous receiving of the third data and when the received third data exceeds a third threshold; and
continuously determining that the reboiler is inactive comprises determining when the difference between the current time and the first start time is at least a fourth threshold, and is active otherwise.

### Claim 4 (depends on 1)

The method of claim 1, wherein:
the fourth device monitors a flow rate of the heating fluid output from the tube side of the reboiler, and outputs the monitored output heating fluid flow rate as the fourth data;
continuously receiving the fourth data comprises setting a second start time to the present time at a beginning of the continuous receiving of the fourth data and when the received fourth data exceeds a fifth threshold; and
continuously determining that the reboiler is losing the heating fluid comprises determining when the difference between the current time and the second start time is at least a sixth threshold, and is not losing the heating fluid otherwise.

### Claim 5 (depends on 1)

The method of claim 1, wherein:
the fifth device monitors a temperature of a flow of bottoms fluid from the column and input to the shell side of the reboiler, and outputs the monitored input bottoms fluid temperature as the fifth data;
the sixth device monitors a temperature of a flow of bottoms fluid output from the shell side of the reboiler into the column, and outputs the monitored output bottoms fluid temperature as the sixth data; and
continuously determining that the reboiler is heat exchanging comprises determining when the difference between the received sixth data and the received fifth data is at least a seventh threshold, and is not heat exchanging otherwise.

### Claim 6 (depends on 1)

The method of claim 1, further comprising shutting down, by the control circuit, the reboiler when the tube leakage in the reboiler is determined to be taking place.

### Claim 7 (depends on 1)

The method of claim 1, wherein the feedstock is petroleum, the column is a crude oil stabilizer, and the heating fluid is steam or water.

### Claim 8

A control circuit to detect tube leakage in a shell and tube thermosiphon reboiler used to drive a fractionating column, the control circuit comprising:
logic to control a fractionating process using process data, the fractionating process taking place in the fractionating column using the shell and tube thermosiphon reboiler;
logic to continuously receive first and second data of the process data from respective first and second devices for monitoring different aspects of an input flow of feedstock into the fractionating column;
logic to continuously determine, using the received first and second data, that the column is in service or not in service;
logic to continuously receive third and fourth data of the process data from respective third and fourth devices for monitoring different aspects of an output flow of tube-side heating fluid from the reboiler;
logic to continuously determine, using the received third data, that the shell and tube thermosiphon reboiler is inactive or active;
logic to continuously determine, using the received fourth data, that the reboiler is losing or not losing the heating fluid;
logic to continuously receive fifth and sixth data of the process data from respective fifth and sixth devices for monitoring temperatures of shell-side bottoms fluid respectively input to and output from the reboiler by a thermosiphon process in the reboiler;
logic to continuously determine, using the received fifth and sixth data, that the reboiler is heat exchanging or not heat exchanging;
logic to continuously determine that the tube leakage in the reboiler is taking place when the column is determined to be in service, the reboiler is determined to be inactive, the reboiler is determined to be losing the heating fluid, and the reboiler is determined to be heat exchanging, and is not taking place otherwise; and
logic to generate an alert when the tube leakage in the reboiler is determined to be taking place.

### Claim 9 (depends on 8)

The control circuit of claim 8, wherein:
the first device monitors a position of a first valve that controls a flow rate of the feedstock into the column, and outputs the monitored first valve position as the first data;
the second device monitors the flow rate of the feedstock into the column, and outputs the monitored feedstock flow rate as the second data; and
the logic to continuously determine that the column is in service comprises logic to determine that the column is in service when both the received first data exceeds a first threshold and the received second data exceeds a second threshold, and is not in service otherwise.

### Claim 10 (depends on 8)

The control circuit of claim 8, wherein:
the third device monitors a position of a second valve that controls a flow rate of the heating fluid from the tube side of the reboiler, and outputs the monitored second valve position as the third data;
the logic to continuously receive the third data comprises logic to set a first start time to the present time at a beginning of the continuous receiving of the third data and when the received third data exceeds a third threshold; and
the logic to continuously determine that the reboiler is inactive comprises logic to determine that the reboiler is inactive when the difference between the current time and the first start time is at least a fourth threshold, and is active otherwise.

### Claim 11 (depends on 8)

The control circuit of claim 8, wherein:
the fourth device monitors a flow rate of the heating fluid output from the tube side of the reboiler, and outputs the monitored output heating fluid flow rate as the fourth data;
the logic to continuously receive the fourth data comprises logic to set a second start time to the present time at a beginning of the continuous receiving of the fourth data and when the received fourth data exceeds a fifth threshold; and
the logic to continuously determine that the reboiler is losing the heating fluid comprises logic to determine that the reboiler is losing the heating fluid when the difference between the current time and the second start time is at least a sixth threshold, and is not losing the heating fluid otherwise.

### Claim 12 (depends on 8)

The control circuit of claim 8, wherein:
the fifth device monitors a temperature of a flow of bottoms fluid from the column and input to the shell side of the reboiler, and outputs the monitored input bottoms fluid temperature as the fifth data;
the sixth device monitors a temperature of a flow of bottoms fluid output from the shell side of the reboiler into the column, and outputs the monitored output bottoms fluid temperature as the sixth data; and
the logic to continuously determine that the reboiler is heat exchanging comprises logic to determine that the reboiler is heat exchanging when the difference between the received sixth data and the received fifth data is at least a seventh threshold, and is not heat exchanging otherwise.

### Claim 13 (depends on 8)

The control circuit of claim 8, further comprising logic to shut down the reboiler when the tube leakage in the reboiler is determined to be taking place.

### Claim 14 (depends on 8)

The control circuit of claim 8, wherein the feedstock is petroleum, the column is a crude oil stabilizer, and the heating fluid is steam or water.

### Claim 15

A non-transitory computer readable medium (CRM) having computer instructions stored therein that, when executed by a processing circuit, cause the processing circuit to carry out an automated process of detecting tube leakage in a shell and tube thermosiphon reboiler used to drive a fractionating column, the process comprising:
controlling a fractionating process using process data, the fractionating process taking place in the fractionating column using the shell and tube thermosiphon reboiler;
continuously receiving first and second data of the process data from respective first and second devices for monitoring different aspects of an input flow of feedstock into the fractionating column;
continuously determining, using the received first and second data, that the column is in service or not in service;
continuously receiving third and fourth data of the process data from respective third and fourth devices for monitoring different aspects of an output flow of tube-side heating fluid from the reboiler;
continuously determining, using the received third data, that the shell and tube thermosiphon reboiler is inactive or active;
continuously determining, using the received fourth data, that the reboiler is losing or not losing the heating fluid;
continuously receiving fifth and sixth data of the process data from respective fifth and sixth devices for monitoring temperatures of shell-side bottoms fluid respectively input to and output from the reboiler by a thermosiphon process in the reboiler;
continuously determining, using the received fifth and sixth data, that the reboiler is heat exchanging or not heat exchanging;
continuously determining that the tube leakage in the reboiler is taking place when the column is determined to be in service, the reboiler is determined to be inactive, the reboiler is determined to be losing the heating fluid, and the reboiler is determined to be heat exchanging, and is not taking place otherwise; and
generating an alert when the tube leakage in the reboiler is determined to be taking place.

### Claim 16 (depends on 15)

The CRM of claim 15, wherein:
the first device monitors a position of a first valve that controls a flow rate of the feedstock into the column, and outputs the monitored first valve position as the first data;
the second device monitors the flow rate of the feedstock into the column, and outputs the monitored feedstock flow rate as the second data; and
continuously determining that the column is in service comprises determining when both the received first data exceeds a first threshold and the received second data exceeds a second threshold, and is not in service otherwise.

### Claim 17 (depends on 15)

The CRM of claim 15, wherein:
the third device monitors a position of a second valve that controls a flow rate of the heating fluid from the tube side of the reboiler, and outputs the monitored second valve position as the third data;
continuously receiving the third data comprises setting a first start time to the present time at a beginning of the continuous receiving of the third data and when the received third data exceeds a third threshold; and
continuously determining that the reboiler is inactive comprises determining when the difference between the current time and the first start time is at least a fourth threshold, and is active otherwise.

### Claim 18 (depends on 15)

The CRM of claim 15, wherein:
the fourth device monitors a flow rate of the heating fluid output from the tube side of the reboiler, and outputs the monitored output heating fluid flow rate as the fourth data;
continuously receiving the fourth data comprises setting a second start time to the present time at a beginning of the continuous receiving of the fourth data and when the received fourth data exceeds a fifth threshold; and
continuously determining that the reboiler is losing the heating fluid comprises determining when the difference between the current time and the second start time is at least a sixth threshold, and is not losing the heating fluid otherwise.

### Claim 19 (depends on 15)

The CRM of claim 15, wherein:
the fifth device monitors a temperature of a flow of bottoms fluid from the column and input to the shell side of the reboiler, and outputs the monitored input bottoms fluid temperature as the fifth data;
the sixth device monitors a temperature of a flow of bottoms fluid output from the shell side of the reboiler into the column, and outputs the monitored output bottoms fluid temperature as the sixth data; and
continuously determining that the reboiler is heat exchanging comprises determining when the difference between the received sixth data and the received fifth data is at least a seventh threshold, and is not heat exchanging otherwise.

### Claim 20 (depends on 15)

The CRM of claim 15, wherein the process further comprises shutting down the reboiler when the tube leakage in the reboiler is determined to be taking place.

### Claim 21 (depends on 15)

The CRM of claim 15, wherein the feedstock is petroleum, the column is a crude oil stabilizer, and the heating fluid is steam or water.
