# US 2022/0287096 A1 · User equipment configured for semi-static channel occupancy in shared spectrum

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0287096 A1
- Document ID: US20220287096A1
- Status: Published application
- Kind: A1
- Application number: 17/749,861
- Filed: 2022-05-20
- Published: 2022-09-08
- Earliest claimed: 2020-03-13
- Assignees: Intel Corporation
- Applicants: Intel Corporation
- Inventors: Salvatore Talarico; Sergey Panteleev; Debdeep Chatterjee; Toufiqul Islam; Yongjun Kwak
- Web page: https://patentgrep.com/patent/US20220287096A1

## CPC

- H04W 16/14: Spectrum sharing arrangements {between different networks}
- H04W 74/0816: with collision avoidance
- H04W 72/1268: of uplink data flows
- H04W 74/004: {in the uplink, i.e. towards network}
- H04W 74/0808: using carrier sensing, e.g. carrier sense multiple access [CSMA]
- H04W 76/10: Connection setup
- H04W 76/27: Transitions between radio resource control [RRC] states
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

Embodiments of a user equipment (UE) configurable for unlicensed band operation in a 5G NR system (5GS), when operating in semi-static channel access mode, for a UE-initiated channel-occupancy time (COT), is configured to transmit an uplink (UL) transmission burst, as an initiating device, starting at a beginning of fixed frame period (FFP) and ending at a symbol before an idle period of the FFP after a successful clear-channel assessment (CCA).

## Claims

### Claim 1

An apparatus of a user equipment (UE) configured for operation in a fifth-generation new radio (5G NR) system (5GS), the apparatus comprising: processing circuitry; and memory,
wherein the processing circuitry is configured to:
decode radio-resource control (RRC) signalling received from a generation node B (gNB), the RRC signalling comprising channel access mode information to configure the UE for semi-static channel occupancy in shared spectrum;
decode a downlink control information (DCI) from the gNB that schedules an uplink (UL) transmission; and
determine whether the scheduled UL transmission is associated with a UE-initiated channel occupancy or is associated with a gNB-initiated channel occupancy,
wherein for the UE-initiated channel occupancy, to acquire a channel occupancy time (COT), the processing circuitry is to:
configure the UE for transmission of an uplink (UL) transmission burst at a beginning of a period immediately after sensing the channel to be idle for a slot duration;
configure the UE to end the UL transmission burst before a start of an idle duration for the period; and
configure the UE to refrain from transmitting within the idle duration of the period,
wherein the memory is configured to store the DCI.

### Claim 2 (depends on 1)

The apparatus of claim 1, wherein when the UE is configured for the semi-static channel occupancy, the UE is configured with semi-static channel access configuration parameters that include a period for periodic channel occupancy and an offset for the periodic channel occupancy, the offset being a number of symbols from a beginning of a frame to a start of a first period in the frame in which the UE can initiate a channel occupancy.

### Claim 3 (depends on 2)

The apparatus of claim 2, wherein the UE is configured to refrain from initiating the channel occupancy at times other than during the period for periodic channel occupancy.

### Claim 4 (depends on 3)

The apparatus of claim 3, wherein the period indicates a periodicity of the semi-static channel access mode and comprises one of 1 millisecond (ms), 2 ms, 2.5 ms, 4 ms, 5 ms and 10 ms.

### Claim 5 (depends on 4)

The apparatus of claim 4, wherein the acquired COT is shared with the gNB, and
wherein the processing circuitry is configured to include transmission gap durations of up to 25 microseconds when determining the acquired COT.

### Claim 6 (depends on 5)

The apparatus of claim 5, wherein when the scheduled UL transmission is determined to be associated with the gNB-initiated channel occupancy, the processing circuitry is to determine whether to transmit the UL transmission without sensing or after sensing the channel.

### Claim 7 (depends on 6)

The apparatus of claim 6, wherein the UL transmission is a configured UL transmission and wherein if the configured UL transmission is to occur after the beginning of the period of duration and would overlap with the idle duration corresponding to the period of duration, the processing circuitry is configured to drop the configured UL transmission unless the processing circuitry determines that the gNB initiated a channel occupancy in the period of duration.

### Claim 8 (depends on 7)

The apparatus of claim 7, wherein if the configured UL transmission is to occur after the beginning of the period of duration and would end before the idle duration corresponding to that period, the processing circuitry is configured to determine that the channel occupancy in the period of duration was initiated by the UE.

### Claim 9 (depends on 5)

The apparatus of claim 5, wherein the scheduled UL transmission and the DCI that scheduled the UL transmission are within a same period of duration that ends before the idle duration.

### Claim 10 (depends on 9)

The apparatus of claim 9, wherein the configured UL transmission comprises a configured grant and includes COT sharing information.

### Claim 11

A non-transitory computer-readable storage medium that stores instructions for execution by processing circuitry of a user equipment (UE) configurable for operation in a 5G NR system (5GS), wherein the processing circuitry is configured to:
decode radio-resource control (RRC) signalling received from a generation node B (gNB), the RRC signalling comprising channel access mode information to configure the UE for semi-static channel occupancy in shared spectrum;
decode a downlink control information (DCI) from the gNB that schedules an uplink (UL) transmission; and
determine whether the scheduled UL transmission is associated with a UE-initiated channel occupancy or is associated with a gNB-initiated channel occupancy,
wherein for the UE-initiated channel occupancy, to acquire a channel occupancy time (COT), the processing circuitry is to:
configure the UE for transmission of an uplink (UL) transmission burst at a beginning of a period immediately after sensing the channel to be idle for a slot duration;
configure the UE to end the UL transmission burst before a start of an idle duration for the period; and
configure the UE to refrain from transmitting within the idle duration of the period.

### Claim 12 (depends on 11)

The non-transitory computer-readable storage medium of claim 11, wherein when the UE is configured for the semi-static channel occupancy, the UE is configured with semi-static channel access configuration parameters that include a period for periodic channel occupancy and an offset for the periodic channel occupancy, the offset being a number of symbols from a beginning of a frame to a start of a first period in the frame in which the UE can initiate a channel occupancy.

### Claim 13 (depends on 12)

The non-transitory computer-readable storage medium of claim 12, wherein the UE is configured to refrain from initiating the channel occupancy at times other than during the period for periodic channel occupancy.

### Claim 14 (depends on 13)

The non-transitory computer-readable storage medium of claim 13, wherein the period indicates a periodicity of the semi-static channel access mode and comprises one of 1 millisecond (ms), 2 ms, 2.5 ms, 4 ms, 5 ms and 10 ms.

### Claim 15 (depends on 14)

The non-transitory computer-readable storage medium of claim 14, wherein the acquired COT is shared with the gNB, and
wherein the processing circuitry is configured to include transmission gap durations of up to 25 microseconds when determining the acquired COT.

### Claim 16 (depends on 15)

The non-transitory computer-readable storage medium of claim 15, wherein when the scheduled UL transmission is determined to be associated with the gNB-initiated channel occupancy, the processing circuitry is to determine whether to transmit the UL transmission without sensing or after sensing the channel.

### Claim 17 (depends on 16)

The non-transitory computer-readable storage medium of claim 16, wherein the UL transmission is a configured UL transmission and wherein if the configured UL transmission is to occur after the beginning of the period of duration and would overlap with the idle duration corresponding to the period of duration, the processing circuitry is configured to drop the configured UL transmission unless the processing circuitry determines that the gNB initiated a channel occupancy in the period of duration.

### Claim 18 (depends on 17)

The non-transitory computer-readable storage medium of claim 17, wherein if the configured UL transmission is to occur after the beginning of the period of duration and would end before the idle duration corresponding to that period, the processing circuitry is configured to determine that the channel occupancy in the period of duration was initiated by the UE.

### Claim 19 (depends on 15)

The non-transitory computer-readable storage medium of claim 15, wherein the scheduled UL transmission and the DCI that scheduled the UL transmission are within a same period of duration that ends before the idle duration.

### Claim 20

An apparatus of a gNode B (gNB) configured for operation in a fifth-generation new radio (5G NR) system (5GS), the apparatus comprising: processing circuitry; and memory, wherein the processing circuitry is configured to:
encode radio-resource control (RRC) signalling for transmission to a user equipment (UE), the RRC signalling comprising channel access mode information to configure the UE for semi-static channel occupancy in shared spectrum;
encode a downlink control information (DCI), for transmission to the UE, that schedules an uplink (UL) transmission; and
wherein for a UE-initiated channel occupancy, to acquire a channel occupancy time (COT), the processing circuitry is to:
configure the gNB to receive an uplink (UL) transmission burst at a beginning of a period immediately after the channel is idle for a slot duration,
wherein receipt of the UL transmission burst indicates that the UE is attempting to acquire a channel occupancy time (COT), and
wherein the UL transmission burst ends before a start of an idle duration for the period.

### Claim 21 (depends on 20)

The apparatus of claim 20, wherein when the gNB has configured the UE for the semi-static channel occupancy, the gNB is to encode signalling to configure the UE with semi-static channel access configuration parameters that include a period for periodic channel occupancy and an offset for the periodic channel occupancy, the offset being a number of symbols from a beginning of a frame to a start of a first period in the frame in which the UE can initiate a channel occupancy.

### Claim 22 (depends on 21)

The apparatus of claim 21, wherein the semi-static channel access configuration parameters configure the UE to refrain from initiating the channel occupancy at times other than during the period for periodic channel occupancy.

### Claim 23 (depends on 22)

The apparatus of claim 22, wherein the period indicates a periodicity of the semi-static channel access mode and comprises one of 1 millisecond (ms), 2 ms, 2.5 ms, 4 ms, 5 ms and 10 ms.

### Claim 24 (depends on 23)

The apparatus of claim 23, wherein the acquired COT is shared with the gNB, and
wherein the acquired COT includes transmission gap durations of up to 25 microseconds.
