# US 2022/0286967 A1 · Method for indicating energy saving information, base station and user terminal

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0286967 A1
- Document ID: US20220286967A1
- Status: Published application
- Kind: A1
- Application number: 17/636,011
- Filed: 2020-08-12
- Published: 2022-09-08
- Earliest claimed: 2019-08-16
- Assignees: Datang Mobile Communications Equipment Co., Ltd.
- Applicants: Datang Mobile Communications Equipment Co., Ltd.
- Inventors: Meiying YANG; Jiaqing WANG; Zheng ZHAO; Chen LUO
- Web page: https://patentgrep.com/patent/US20220286967A1

## CPC

- H04W 52/0216: {using a pre-established activity schedule, e.g. traffic indication frame}
- H04W 52/0235: {where the received signal is a power saving command}
- G06F 1/3209: Monitoring remote activity, e.g. over telephone lines or network connections
- G06F 1/3287: by switching off individual functional units in the computer system
- H04L 5/0053: {Allocation of signalling, i.e. of overhead other than pilot signals}
- H04L 5/0098: {Signalling of the activation or deactivation of component carriers, subcarriers or frequency bands}
- H04W 52/0258: {controlling an operation mode according to history or models of usage information, e.g. activity schedule or time of day}
- H04W 52/0296: {switching to a backup power supply}
- H04W 72/0446: Resources in time domain, e.g. slots or frames
- H04W 72/1263: Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
- H04W 72/23: in the downlink direction of a wireless link, i.e. towards a terminal
- G06F 1/324: by lowering clock frequency
- H04L 5/001: {the frequencies being arranged in component carriers}
- H04L 5/0035: {Resource allocation in a cooperative multipoint environment}
- H04L 5/005: {of common pilots, i.e. pilots destined for multiple users or terminals}
- Y02D 30/70: in wireless communication networks
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- Y02D: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE

## Abstract

A method for indicating energy saving information, a base station and a user terminal. In the prior art, there is a technical problem of a poor energy saving effect when using the PDCCH as an energy saving channel to indicate energy saving information of a UE. The method comprises: carrying first energy saving information in target downlink control information (DCI) of a first time unit, the first energy saving information being used for indicating at least one piece of cross-timeslot scheduling information comprised in a first time window, the first time window comprising at least one time unit using the first time unit or a subsequent time unit as the start point, and the cross-timeslot scheduling information comprising at least among first information and second information, the first information being used for indicating and scheduling the DCI as a cross-timeslot scheduling or a present timeslot scheduling, and the second information being used for indicating the minimum value of a cross timeslot scheduling parameter or the minimum value of a cross-timeslot scheduling parameter in a TDRA list; and transmitting the target DCI to a user terminal.

## Claims

### Claim 1

A method for indicating energy saving information, applied to a base station, and comprising:
carrying first energy saving information in target downlink control information (DCI) of a first time unit, wherein the first energy saving information is configured to indicate at least one piece of cross-slot scheduling information comprised in a first time window, the first time window comprises at least one time unit with the first time unit as a start point or with a time unit following the first time unit as a start point, and the cross-slot scheduling information comprises at least one of first information or second information, wherein the first information is configured to indicate scheduling DCI as cross-slot scheduling or current slot scheduling, and the second information is configured to indicate a minimum value of a cross-slot scheduling parameter or a minimum value of a cross-slot scheduling parameter in a time domain resource allocation (TDRA) list; and
transmitting the target DCI to user equipment.

### Claim 2 (depends on 1)

The method according to claim 1, wherein the minimum value of the cross-slot scheduling parameter comprises at least one of:
a minimum value of a time interval between physical downlink shared channel (PDSCH) transmission and physical downlink control channel (PDCCH) reception; or
a minimum value of a time interval between physical uplink shared channel (PUSCH) transmission and PDCCH reception.

### Claim 3 (depends on 1)

The method according to claim 1, wherein the target DCI comprises at least one of downlink (DL) scheduling DCI, or uplink (UL) scheduling DCI.

### Claim 4 (depends on 3)

The method according to claim 3, further comprising:
determining a quantity of the target DCI to be X, if the first energy saving information is borne on the DL scheduling DCI and/or the UL scheduling DCI;
wherein X is smaller than or equal to a quantity of the DL scheduling DCI or the UL scheduling DCI comprised in one time unit.

### Claim 5 (depends on 1)

The method according to claim 1, further comprising:
carrying second energy saving information in target DCI of a second time unit, wherein the second energy saving information is configured to indicate at least one piece of cross-slot scheduling information comprised in a second time window, the second time window comprises at least one time unit with the second time unit as a start point or with a time unit following the second time unit as a start point, and a relation between the second time window and the first time window comprises at least one of partial overlap, non-overlap, or complete overlap; and
transmitting the target DCI of the second time unit to the user equipment.

### Claim at position 6

6-7. (canceled)

### Claim 8

A method for indicating energy saving information, applied to user equipment, and comprising:
receiving device target downlink control information (DCI) carrying first energy saving information transmitted by a base station in a first time unit, wherein the first energy saving information is configured to indicate at least one piece of cross-slot scheduling information comprised in a first time window, the first time window comprises at least one time unit with the first time unit as a start point or with a time unit following the first time unit as a start point, and the cross-slot scheduling information comprises at least one of first information or second information, wherein the first information is configured to indicate scheduling DCI as cross-slot scheduling or current slot scheduling, and the second information is configured to indicate a minimum value of a cross-slot scheduling parameter or a minimum value of a cross-slot scheduling parameter in a time domain resource allocation (TDRA) list; and
determining the at least one piece of cross-slot scheduling information comprised in the first time window according to the target DCI.

### Claim 9 (depends on 8)

The method according to claim 8, wherein the determining the at least one piece of cross-slot scheduling information comprised in the first time window according to the target DCI comprises:
bearing the at least one piece of cross-slot scheduling information on the scheduling DCI; and
returning, by the user equipment, to current slot scheduling in a case that the target DCI is downlink (DL) scheduling DCI and indicates cross-slot scheduling information of uplink (UL) scheduling DCI, or the target DCI is UL scheduling DCI and indicates cross-slot scheduling information of DL scheduling DCI.

### Claim 10 (depends on 8)

The method according to claim 8, further comprising:
receiving device target DCI carrying second energy saving information transmitted by the base station in a second time unit;
wherein the second energy saving information is configured to indicate at least one piece of cross-slot scheduling information comprised in a second time window, and the second time window comprises at least one time unit with the second time unit as a start point or with a time unit following the second time unit as a start point; and
determining, by the user equipment, the cross-slot scheduling information according to the target DCI received recently in a case that the second time window partially or completely overlaps with the first time window.

### Claim 11 (depends on 8)

The method according to claim 8, further comprising:
receiving device, by the user equipment, the cross-slot scheduling parameter in a case that the scheduling DCI for data transfer of an activated bandwidth part (BWP) of a first carrier is configured to be cross-slot scheduling;
wherein the cross-slot scheduling parameter is a maximum value between a first time interval and a first parameter, the first time interval is configured to represent a time interval by which the activated BWP of the first carrier is switched from a first BWP to a second BWP, and the first parameter is configured to represent a cross-slot scheduling parameter configured for the second BWP of the first carrier.

### Claim 12 (depends on 11)

The method according to claim 11, further comprising:
receiving device a switching signaling on a second carrier after data transfer of the activated BWP of the first carrier is completed; wherein the second carrier is a carrier set comprising at least one carrier for data scheduling, and the switching signaling is configured to indicate switch of the activated BWP of the first carrier; and
switching the activated BWP of the first carrier from the first BWP to the second BWP according to the switching signaling.

### Claim at position 12

13-14. (canceled)

### Claim 15 (depends on 1)

A base station, wherein the base station comprises a processor and a memory, the memory is configured to store a program executable by the processor, and the processor is configured to read the program in the memory and execute the method of claim 1.

### Claim 16

User equipment, wherein the user equipment comprises a processor and a memory, the memory is configured to store a program executable by the processor, and the processor is configured to read the program in the memory and execute:
receiving device target downlink control information (DCI) carrying first energy saving information transmitted by a base station in a first time unit, wherein the first energy saving information is configured to indicate at least one piece of cross-slot scheduling information comprised in a first time window, the first time window comprises at least one time unit with the first time unit as a start point or with a time unit following the first time unit as a start point, and the cross-slot scheduling information comprises at least one of first information or second information, wherein the first information is configured to indicate scheduling DCI as cross-slot scheduling or current slot scheduling, and the second information is configured to indicate a minimum value of a cross-slot scheduling parameter or a minimum value of a cross-slot scheduling parameter in a time domain resource allocation (TDRA) list; and
determining the at least one piece of cross-slot scheduling information comprised in the first time window according to the target DCI.

### Claim 17 (depends on 1)

A computer-readable storage medium, wherein the computer-readable storage medium stores a computer-executable instruction, and the computer-executable instruction is configured to enable a computer to execute the method according to claim 1.

### Claim 18 (depends on 15)

The base station according to claim 15, wherein the minimum value of the cross-slot scheduling parameter comprises at least one of:
a minimum value of a time interval between physical downlink shared channel (PDSCH) transmission and physical downlink control channel (PDCCH) reception; or
a minimum value of a time interval between physical uplink shared channel (PUSCH) transmission and PDCCH reception.

### Claim 19 (depends on 15)

The base station according to claim 15, wherein the target DCI comprises at least one of downlink (DL) scheduling DCI, or uplink (UL) scheduling DCI.

### Claim 20 (depends on 16)

The user equipment according to claim 16, wherein the processor is configured to read the program in the memory and execute:
bearing the at least one piece of cross-slot scheduling information on the scheduling DCI; and
returning, by the user equipment, to current slot scheduling in a case that the target DCI is downlink (DL) scheduling DCI and indicates cross-slot scheduling information of uplink (UL) scheduling DCI, or the target DCI is UL scheduling DCI and indicates cross-slot scheduling information of DL scheduling DCI.

### Claim 21 (depends on 16)

The user equipment according to claim 16, wherein the processor is configured to read the program in the memory and execute:
receiving device target DCI carrying second energy saving information transmitted by the base station in a second time unit;
wherein the second energy saving information is configured to indicate at least one piece of cross-slot scheduling information comprised in a second time window, and the second time window comprises at least one time unit with the second time unit as a start point or with a time unit following the second time unit as a start point; and
determining, by the user equipment, the cross-slot scheduling information according to the target DCI received recently in a case that the second time window partially or completely overlaps with the first time window.

### Claim 22 (depends on 16)

The user equipment according to claim 16, wherein the processor is configured to read the program in the memory and execute:
receiving device, by the user equipment, the cross-slot scheduling parameter in a case that the scheduling DCI for data transfer of an activated bandwidth part (BWP) of a first carrier is configured to be cross-slot scheduling;
wherein the cross-slot scheduling parameter is a maximum value between a first time interval and a first parameter, the first time interval is configured to represent a time interval by which the activated BWP of the first carrier is switched from a first BWP to a second BWP, and the first parameter is configured to represent a cross-slot scheduling parameter configured for the second BWP of the first carrier.

### Claim 23 (depends on 22)

The user equipment according to claim 22, wherein the processor is configured to read the program in the memory and execute:
receiving device a switching signaling on a second carrier after data transfer of the activated BWP of the first carrier is completed; wherein the second carrier is a carrier set comprising at least one carrier for data scheduling, and the switching signaling is configured to indicate switch of the activated BWP of the first carrier; and
switching the activated BWP of the first carrier from the first BWP to the second BWP according to the switching signaling.
