# US 2022/0285976 A1 · System and method for using a ups to dynamically control the amount of ac power received from a utility power source

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0285976 A1
- Document ID: US20220285976A1
- Status: Published application
- Kind: A1
- Application number: 17/685,326
- Filed: 2022-03-02
- Published: 2022-09-08
- Earliest claimed: 2021-03-04
- Assignees: Vertiv Corporation
- Applicants: Vertiv Corporation
- Inventors: Graziano GALUPPI; Brian Scott COGAR; Stephen Michael MAJOR; Livio TILOTTA; Stefano PECORARI
- Web page: https://patentgrep.com/patent/US20220285976A1

## CPC

- H02J 9/062: {for AC powered loads}
- H02J 9/005: {using a power saving mode (for copiers G03G15/5004)}
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY

## Abstract

The present disclosure relates to an uninterruptible power supply (UPS) for monitoring and prioritizing use of available power. The UPS has an electronic controller with a memory and a software control module. The UPS also has a battery, a rectifier for rectifying available AC power from a primary external AC power source to produce DC power, an inverter in communication with the rectifier for generating AC power from the DC power provided by the rectifier, and a DC/DC converter in communication with the rectifier for producing a DC charging current for use in charging the battery. The electronic controller and the software control module are configured to dynamically prioritize the use of available power from at least one of the primary AC power source and from the battery, to maintain adequate power to a load being supported by the UPS, as well as to charge the battery of the UPS when predetermined operating conditions are met.

## Claims

### Claim 1

An uninterruptible power supply (UPS) for monitoring and prioritizing use of available power, the UPS comprising:
an electronic controller having a memory and a software control module;
a battery;
a rectifier for rectifying available AC power from a primary AC power source to produce DC power;
an inverter in communication with the rectifier for generating AC power from the DC power provided by the rectifier;
a DC/DC converter in communication with the rectifier for producing a DC charging current for use in charging the battery; and
the electronic controller and the software control module configured to dynamically prioritize the use of available power from at least one of the primary AC power source and from the battery, to maintain adequate power to a load being supported by the UPS, as well as to charge the battery of the UPS when predetermined operating conditions are met.

### Claim 2 (depends on 1)

The UPS of claim 1, wherein the electronic controller and the software control module are further configured with:
a maximum input current that the UPS is able to receive;
a maximum power input that the UPS is able to receive; and
a maximum charging current that the UPS is able to receive for charging the battery.

### Claim 3 (depends on 2)

The UPS of claim 2, further comprising a user interface subsystem for enabling user settable inputs for each of the maximum input current, the maximum power input and the maximum charging current.

### Claim 4 (depends on 2)

The UPS of claim 2, wherein the predetermined operating conditions include one or more of a maximum input current and a maximum power input of the UPS, and wherein the electronic control system, working in connection with the software control module, is further configured to determine when an amount of energy needed from the primary AC power source is sufficient to both charge the battery and supply the load without exceeding the maximum input current and maximum power input of the UPS.

### Claim 5 (depends on 4)

The UPS of claim 4, wherein the electronic control system, working in connection with the software control module, is further configured to reduce a charging current being applied to the battery by an amount sufficient to enable a load requirement of the load to be met by the UPS, when it is determined that insufficient energy is being supplied by the primary AC power source to simultaneously charge the battery and meet the load requirement.

### Claim 6 (depends on 5)

The UPS of claim 5, wherein the electronic control system, working in connection with the software control module, is further configured to check when a reduction in the charging current applied to the battery has enabled the load requirement to be met.

### Claim 7 (depends on 6)

The UPS of claim 6, wherein the electronic control system, working in connection with the software control module, is further configured to set the charging current to zero when needed to enable the load requirement to be met using power received form the primary AC power source.

### Claim 8 (depends on 7)

The UPS of claim 7, wherein the electronic control system, working in connection with the software control module, is further configured to check if sufficient power is being supplied to the load to meet the load requirement after setting the charging current to zero, and when the load requirement is still not being met, to use the battery to supply additional power to make up a shortfall in power being supplied from the primary AC power source, to thus enable the UPS to meet the load requirement.

### Claim 9 (depends on 4)

The UPS of claim 4, wherein the electronic control system, working in connection with the software module, is further configured to check if the maximum input current of the UPS has been met when the primary AC power source is supplying sufficient power to simultaneously meet the load requirement and to charge the battery, without exceeding the maximum power input of the UPS.

### Claim 10 (depends on 9)

The UPS of claim 9, wherein the electronic control system, working in connection with the software module, is further configured to check if the battery is fully charged while the primary AC power source is supplying sufficient power to simultaneously meet the load requirement and to charge the battery, while not exceeding the maximum power input of the UPS.

### Claim 11 (depends on 10)

The UPS of claim 10, wherein the electronic control system, working in connection with the software module, is further configured to reduce a current being drawn from the primary AC power source to meet the load requirement and to maintain the battery in a fully charged state, when it is determined that the battery is fully charged.

### Claim 12 (depends on 10)

The UPS of claim 10, wherein the electronic control system, working in connection with the software module, is further configured to enable the current being drawn from the primary AC power source to be increased to expedite battery charging, when the maximum input current is not being met and the maximum power input is not being exceeded, and the current being drawn from the primary AC power source is also sufficient to maintain operation of the UPS within a predetermined Safe Operating Area (SoA) and to meet the load requirement.

### Claim 13

A method of using an uninterruptible power supply (UPS) for monitoring and prioritizing use of available power, the method comprising:
providing a UPS having a memory, a software control module, a battery, and setpoints for maximum input current to be drawn by the UPS, maximum power input to be drawn by the UPS, and maximum battery charging current to be drawn by the UPS for charging the battery;
using the electronic controller and the software control module to:
monitor power being provided by the primary AC power source;
determine if the power being provided by the primary AC power source is sufficient to both charge the battery and meet the load requirement without exceeding the maximum input current and the maximum power input;
reduce a charging current being supplied by the UPS to the battery by a predetermined amount to reduce the charging current from a first level to a second level less than the first level;
make a determination if the load requirement can be met by the UPS while the charging current is maintained at the second level; and
when the load requirement can be met while the charging current is maintained at the second level, to continue with operation of the UPS supporting the load requirement while simultaneously continuing charging of the battery at the second level of the charging current.

### Claim 14 (depends on 13)

The method of claim 13, further comprising using the electronic control system and the software module to reduce the charging current being supplied to the battery to zero when a determination is made that the load requirement cannot be met by the UPS while providing the second level of the charging current to the battery.

### Claim 15 (depends on 14)

The method of claim 14, further comprising using the battery to supply power to the load to help meet the load requirement when the charging current has been set to zero, and the UPS is still unable to meet the load requirement using power being supplied from the primary AC power source.

### Claim 16 (depends on 13)

The method of claim 13, further comprising using the electronic control system and the software control module to determine if the maximum input current is being met while power from the primary AC power source is being used to meet the load requirement and to charge the battery, both without exceeding the maximum input current and maximum power input.

### Claim 17 (depends on 16)

The method of claim 16, further comprising using the electronic control system and the software control module to determine when the battery is fully charged while the maximum input current is not being met, and when the battery is fully charged, then using the UPS to reduce current being drawn from the primary AC power source to only that needed to meet the load requirement and to maintain the battery in a fully charged state.

### Claim 18 (depends on 16)

The method of claim 16, further comprising using the electronic control system and the software control module to determine if the battery is fully charged, and when the battery is not fully charged, then causing the UPS to allow current from the primary AC power source to be increased while maintaining the UPS within a predetermined Safe Operating Area (SoA) to expedite charging of the battery.

### Claim 19 (depends on 13)

The method of claim 13, further comprising configuring at least one of the maximum input current, the maximum power input and the maximum battery charging current as user settable setpoints.
