# US 2022/0285193 A1 · Shortened load port for factory interface

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0285193 A1
- Document ID: US20220285193A1
- Status: Published application
- Kind: A1
- Application number: 17/683,938
- Filed: 2022-03-01
- Published: 2022-09-08
- Earliest claimed: 2021-03-04
- Assignees: Applied Materials, Inc.
- Applicants: Applied Materials, Inc.
- Inventors: Srinivas Poshatrahalli Gopalakrishna; Paul B. Reuter; Devendra Channappa Holeyannavar; Douglas B. Baumgarten; Sushant S. Koshti; Arunkumar Ramachandraiah; Narayanan Ramachandran
- Web page: https://patentgrep.com/patent/US20220285193A1

## CPC

- H10P 72/3408: {Docking arrangements}
- B25J 9/1687: {Assembly, peg and hole, palletising, straight line, weaving pattern movement}
- G05B 19/418: Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B 2219/40066: Stack and align identical layers, laminates, electronic substrate layers
- H10P: GENERIC PROCESSES OR APPARATUS FOR THE MANUFACTURE OR TREATMENT OF DEVICES COVERED BY CLASS H10
- B25J: MANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES ({manipulators specially adapted for use in surgery A61B34/70; manipulators used in cleaning hollow articles B08B9/04}; manipulators associated with rolling mills B21B39/20; manipulators associated with forging machines B21J13/10; {manipulators associated with picking-up and placing mechanisms B23P19/007}; means for holding wheels or parts thereof B60B30/00; {vehicles with ground-engaging propulsion means, e.g. walking members B62D57/02, B62D57/032; devices for picking-up and depositing articles or materials between conveyors B65G47/90, B65G47/91; manipulators with gripping or holding means for transferring packages B65H67/065}; cranes B66C; {manipulators used in the protection or supervision of pipe-line installations F17D5/00; walking equipment adapted for nuclear steam-generators F22B37/006}; manipulators specially adapted for, or associated with, nuclear reactors G21C; {apparatus used for handling wafers during manufacture or treatment of semiconductor H10P72/50})
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

The disclosure describes devices, systems, and methods for integrating load locks into a factory interface footprint space. A factory interface for an electronic device manufacturing system can include a load port for receiving a substrate carrier. The load port can include a frame adapted for connecting the load port to a factory interface, the frame comprising a transport opening through which one or more substrates are capable of being transported between the substrate carrier and the factory interface. The load port can also include an actuator coupled to the frame, and a load port door coupled to the actuator and configured to seal the transport opening. The frame height can be greater than the height of the load port door, and less than 2.5 times the height of the load port door.

## Claims

### Claim 1

A load port for receiving a substrate carrier, comprising:
a frame adapted for connecting the load port to a factory interface, the frame comprising a transport opening through which one or more substrates are capable of being transported between the substrate carrier and the factory interface;
an actuator coupled to the frame; and
a load port door coupled to the actuator and configured to seal the transport opening, wherein the actuator is configured to adjust the load port door from a first position to a second position to open the load port door, and from the second position to the first position to seal the load port door, wherein:
the load port door comprises a first height;
the frame comprises a second height; and
the second height is greater than the first height, and less than 2.5 times the first height.

### Claim 2 (depends on 1)

The load port of claim 1, wherein the load port is mounted to a wall of the factory interface, and wherein the actuator is a pneumatic driven actuator or an electromechanically driven actuator.

### Claim 3 (depends on 1)

The load port of claim 1, wherein the second height is less than or equal to 650 millimeters.

### Claim 4 (depends on 1)

The load port of claim 1, further comprising a purge kit for purging the substrate carrier with an inert gas.

### Claim 5 (depends on 1)

The load port of claim 1, further comprising:
at least one of a substrate storage container, metrology equipment, a server, or an air conditioning unit positioned below the load port.

### Claim 6 (depends on 1)

The load port of claim 1, wherein the load port is connected to a factory interface wall using a mounting bracket.

### Claim 7 (depends on 1)

The load port of claim 1, wherein the load port is connected to a factory interface wall using a first assembly of one or more first components and a second assembly of one or more second components.

### Claim 8 (depends on 1)

The load port of claim 1, further comprising:
a particle trapping mechanism designed to collect particles generated by a motion of load port door.

### Claim 9 (depends on 8)

The load port of claim 8, wherein the particle trapping mechanism comprises an exhaust system to guide collected particles out of the factory interface.

### Claim 10 (depends on 8)

The load port of claim 8, wherein the particle trapping mechanism is designed to collect particles generated by each load port door of the factory interface.

### Claim 11 (depends on 1)

The load port of claim 1, wherein the actuator is coupled to the frame substantially close to the transport opening.

### Claim 12

An electronic device manufacturing system, comprising:
a factory interface; and
at least one load port for receiving a substrate carrier, comprising:
a frame adapted for connecting the load port to the factory interface, the frame comprising a transport opening through which one or more substrates are capable of being transported between the substrate carrier and the factory interface;
an actuator coupled to the frame; and
a load port door coupled to the actuator and capable of sealing the transport opening, wherein the actuator is capable of positioning the load port door from a first position to a second position, and from the second position to the first position, wherein:
the load port door comprises a first height;
the frame comprises a second height; and
the second height is greater than the first height, and less than 2.5 times the first height.

### Claim 13 (depends on 12)

The electronic device manufacturing system of claim 12, wherein the load port is mounted to a wall of the factory interface, and wherein the actuator is a pneumatic driven actuator or an electromechanically driven actuator.

### Claim 14 (depends on 12)

The electronic device manufacturing system of claim 12, wherein the second height is less than or equal to 650 millimeters.

### Claim 15 (depends on 12)

The electronic device manufacturing system of claim 12, wherein the load port further comprises:
a purge kit for purging the substrate carrier with an inert gas.

### Claim 16 (depends on 12)

The electronic device manufacturing system of claim 12, wherein the load port further comprises:
at least one of a substrate storage container, metrology equipment, a server, or an air conditioning unit positioned below the load port.

### Claim 17 (depends on 12)

The electronic device manufacturing system of claim 12, wherein the load port is connected to a factory interface wall using a mounting bracket.

### Claim 18 (depends on 12)

The electronic device manufacturing system of claim 12, wherein the load port further comprises:
a particle trapping mechanism designed to collect particles generated by a motion of load port door.

### Claim 19 (depends on 18)

The load port of claim 18, wherein the particle trapping mechanism comprises an exhaust system to guide collected particles out of the factory interface.

### Claim 20

A method for transporting substrates from a substrate carrier into a factory interface, comprising:
receiving, by a load port, a substrate carrier; wherein the load port comprises:
a frame adapted for connecting the load port to the factory interface, the frame comprising a transport opening through which one or more substrates are capable of being transported between the substrate carrier and the factory interface;
an actuator coupled to the frame; and
a load port door coupled to the actuator and capable of sealing the transport opening, wherein the actuator is capable of positioning the load port door from a first position to a second position, and from the second position to the first position, wherein:
the load port door comprises a first height;
the frame comprises a second height; and
the second height is greater than the first height, and less than 2.5 times the first height;
positioning the load port door from the first position to the second position using the actuator; and
retrieving, by a factory interface robot deposed within the factory interface, a substrate from the substrate carrier.
