# US 2022/0284399 A1 · Computer System and Methods for Managing Data, Data Access, and Data Retention

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0284399 A1
- Document ID: US20220284399A1
- Status: Published application
- Kind: A1
- Application number: 17/191,484
- Filed: 2021-03-03
- Published: 2022-09-08
- Earliest claimed: 2021-03-03
- Assignees: Procore Technologies, Inc.
- Applicants: Procore Technologies, Inc.
- Inventors: Anuj Rohatgi; Allen Kim; Tabitha Jewett; Terrence Cole; Tem K. Boylan
- Web page: https://patentgrep.com/patent/US20220284399A1

## CPC

- G06Q 10/103: {Workflow collaboration or project management}
- G06F 16/125: {characterised by the use of retention policies (retention policies for HSM systems G06F16/185)}
- G06Q 10/06313: {Resource planning in a project environment}
- G06Q 50/08: Construction
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A computing system configured to: (i) receive a request to create a project entity; create the project entity; establish a data connection between a first party and the project entity; and define the first party's default data retention settings; (ii) receive a request to create a set of data objects associated with the project entity; create each data object in the set; establish a respective data connection between the first party and each data object; and define the first party's data retention settings for the respective data object; (iii) after receiving an indication that a second party has accepted the first party's invitation to collaborate: establish a data connection between the second party and the project entity; define the second party's default data retention settings; establish a respective data connection between the second party and each data object; and define the second party's data retention settings for each data object to match the second party's default data retention settings.

## Claims

### Claim 1

A computing system comprising:
a network interface;
at least one processor;
a non-transitory computer-readable medium; and
program instructions stored on the non-transitory computer-readable medium that are executable by the at least one processor such that the computing system is configured to:
receive, from a first party, a first request to create a project entity for a construction project;
after receiving the first request to create the project entity:
create the project entity for the construction project;
establish a first data connection between the first party and the project entity; and
define the first party's default data retention settings for the project entity;
receive, from the first party, a second request to create a first set of one or more data objects associated with the project entity, wherein the second request comprises data defining the first set of one or more data objects associated with the project entity;
for each respective data object in the first set of one or more data objects associated with the project entity:
create the respective data object;
establish a respective data connection between the first party and the respective data object; and
define the first party's data retention settings for the respective data object;
receive, from the first party, data defining an invitation for a second party to collaborate on the project entity for the construction project, wherein the invitation includes the first party's proposal of the second party's default data retention settings for the project entity;
receive, from the second party, an indication that the second party has accepted the first party's invitation to collaborate on the project entity for the construction project; and
after receiving the indication that the second party has accepted the first party's invitation to collaborate:
establish a second data connection between the second party and the project entity;
based on the first party's proposal of the second party's default data retention settings for the project entity, define the second party's default data retention settings for the project entity;
establish a respective data connection between the second party and each respective data object in the first set of one or more data objects; and
define the second party's data retention settings for each respective data object in the first set of one or more data objects to match the second party's default data retention settings for the project entity.

### Claim 2 (depends on 1)

The computing system of claim 1, wherein the indication that the second party has accepted the first party's invitation to collaborate is a first indication, the computing system further comprising program instructions stored on the non-transitory computer-readable medium that are executable by the at least one processor such that the computing system is configured to:
receive a second indication that collaboration between the first party and the second party has ended; and
after receiving the second indication that collaboration between the first party and the second party has ended:
determine, in accordance with the second party's defined data retention settings for each respective data object in the first set of one or more data objects, a level of retention for the second party's data retention of each respective data object in the first set of one or more data objects.

### Claim 3 (depends on 2)

The computing system of claim 2, wherein the level of retention comprises one of: (i) read/write retention, (ii) read-only retention, or (iii) no retention.

### Claim 4 (depends on 1)

The computing system of claim 1, further comprising program instructions stored on the non-transitory computer-readable medium that are executable by the at least one processor such that the computing system is configured to:
receive, from the first party, a third request to delete a given data object in the first set of one or more data objects; and
after receiving the third request to delete the given data object in the first set of one or more data objects:
determine, in accordance with the second party's defined data retention settings for each respective data object in the first set of one or more data objects, a level of retention for the second party's data retention of the given data object.

### Claim 5 (depends on 4)

The computing system of claim 4, wherein the level of retention comprises one of: (i) read/write retention, (ii) read-only retention, or (iii) no retention.

### Claim 6 (depends on 5)

The computing system of claim 5, further comprising program instructions stored on the non-transitory computer-readable medium that are executable by the at least one processor such that the computing system is configured to:
delete the respective data connection between the given data object and the second party.

### Claim 7 (depends on 6)

The computing system of claim 6, wherein the level of retention comprises either read/write retention or read-only retention, the computing system further comprising program instructions stored on the non-transitory computer-readable medium that are executable by the at least one processor such that the computing system is configured to:
if the level of retention is read/write retention, cause an editable copy of the given data object to be stored in a location accessible by the second party; or
if the level of retention is read-only retention, cause a read-only copy of the given data object to be stored in a location accessible by the second party.

### Claim 8 (depends on 1)

The computing system of claim 1, further comprising program instructions stored on the non-transitory computer-readable medium that are executable by the at least one processor such that the computing system is configured to:
after receiving the indication that the second party has accepted the first party's invitation to collaborate on the project entity:
receive, from the first party, a third request to create a second set of one or more data objects associated with the project entity, wherein the third request comprises data defining the second set of one or more data objects associated with the project entity; and
for each respective data object in the second set of one or more data objects associated with the project entity:
create the respective data object;
establish a respective data connection between the first party and the respective data object;
define the first party's data retention settings for the respective data object to match the first party's data default retention settings for the project entity;
establish a respective data connection between second party and respective data object; and
define the second party's data retention settings for the respective data object to match the second party's data default retention settings for the project entity.

### Claim 9 (depends on 1)

The computing system of claim 1, further comprising program instructions stored on the non-transitory computer-readable medium that are executable by the at least one processor such that the computing system is configured to:
after receiving the indication that the second party has accepted the first party's invitation to collaborate on the project entity:
receive, from the second party, a third request to create a second set of one or more data objects associated with the project entity, wherein the third request comprises data defining the second set of one or more data objects associated with the project entity; and
for each respective data object in the second set of one or more data objects associated with the project entity:
create the respective data object;
establish a respective data connection between the first party and the respective data object;
define the first party's data retention settings for the respective data object to match the first party's data default retention settings for the project entity;
establish a respective data connection between the second party and the respective data object; and
define the second party's data retention settings for the respective data object, wherein the second party's data retention settings for the respective data object differ from the second party's default data retention settings for the project entity.

### Claim 10

A non-transitory computer-readable medium, wherein the non-transitory computer-readable medium is provisioned with program instructions that, when executed by at least one processor, cause a computing system to:
receive, from a first party, a first request to create a project entity for a construction project;
after receiving the first request to create the project entity:
create the project entity for the construction project;
establish a first data connection between the first party and the project entity; and
define the first party's default data retention settings for the project entity;
receive, from the first party, a second request to create a first set of one or more data objects associated with the project entity, wherein the second request comprises data defining the first set of one or more data objects associated with the project entity;
for each respective data object in the first set of one or more data objects associated with the project entity:
create the respective data object;
establish a respective data connection between the first party and the respective data object; and
define the first party's data retention settings for the respective data object;
receive, from the first party, data defining an invitation for a second party to collaborate on the project entity for the construction project, wherein the invitation includes the first party's proposal of the second party's default data retention settings for the project entity;
receive, from the second party, an indication that the second party has accepted the first party's invitation to collaborate on the project entity for the construction project; and
after receiving the indication that the second party has accepted the first party's invitation to collaborate:
establish a second data connection between the second party and the project entity;
based on the first party's proposal of the second party's default data retention settings for the project entity, define the second party's default data retention settings for the project entity;
establish a respective data connection between the second party and each respective data object in the first set of one or more data objects; and
define the second party's data retention settings for each respective data object in the first set of one or more data objects to match the second party's default data retention settings for the project entity.

### Claim 11 (depends on 10)

The non-transitory computer-readable medium of claim 10, wherein the indication that the second party has accepted the first party's invitation to collaborate is a first indication, the computing system further comprising program instructions stored on the non-transitory computer-readable medium that are executable by the at least one processor such that the computing system is configured to:
receive a second indication that collaboration between the first party and the second party has ended; and
after receiving the second indication that collaboration between the first party and the second party has ended:
determine, in accordance with the second party's defined data retention settings for each respective data object in the first set of one or more data objects, a level of retention for the second party's data retention of each respective data object in the first set of one or more data objects.

### Claim 12 (depends on 10)

The non-transitory computer-readable medium of claim 10, wherein the level of retention comprises one of: (i) read/write retention, (ii) read-only retention, or (iii) no retention.

### Claim 13 (depends on 10)

The non-transitory computer-readable medium of claim 10, wherein the non-transitory computer-readable medium is also provisioned with program instructions that, when executed by at least one processor, cause the computing system to:
receive, from the first party, a third request to delete a given data object in the first set of one or more data objects; and
after receiving the third request to delete the given data object in the first set of one or more data objects:
determine, in accordance with the second party's defined data retention settings for each respective data object in the first set of one or more data objects, a level of retention for the second party's data retention of the given data object.

### Claim 14 (depends on 13)

The non-transitory computer-readable medium of claim 13, wherein the level of retention comprises one of: (i) read/write retention, (ii) read-only retention, or (iii) no retention.

### Claim 15 (depends on 14)

The non-transitory computer-readable medium of claim 14, wherein the non-transitory computer-readable medium is also provisioned with program instructions that, when executed by at least one processor, cause the computing system to:
delete the respective data connection between the given data object and the second party.

### Claim 16 (depends on 10)

The non-transitory computer-readable medium of claim 10, wherein the non-transitory computer-readable medium is also provisioned with program instructions that, when executed by at least one processor, cause the computing system to:
after receiving the indication that the second party has accepted the first party's invitation to collaborate on the project entity:
receive, from the first party, a third request to create a second set of one or more data objects associated with the project entity, wherein the third request comprises data defining the second set of one or more data objects associated with the project entity; and
for each respective data object in the second set of one or more data objects associated with the project entity:
create the respective data object;
establish a respective data connection between the first party and the respective data object;
define the first party's data retention settings for the respective data object to match the first party's data default retention settings for the project entity;
establish a respective data connection between second party and respective data object; and
define the second party's data retention settings for the respective data object to match the second party's data default retention settings for the project entity.

### Claim 17 (depends on 10)

The non-transitory computer-readable medium of claim 10, wherein the non-transitory computer-readable medium is also provisioned with program instructions that, when executed by at least one processor, cause the computing system to:
after receiving the indication that the second party has accepted the first party's invitation to collaborate on the project entity:
receive, from the second party, a third request to create a second set of one or more data objects associated with the project entity, wherein the third request comprises data defining the second set of one or more data objects associated with the project entity; and
for each respective data object in the second set of one or more data objects associated with the project entity:
create the respective data object;
establish a respective data connection between the first party and the respective data object;
define the first party's data retention settings for the respective data object to match the first party's data default retention settings for the project entity;
establish a respective data connection between the second party and the respective data object; and
define the second party's data retention settings for the respective data object, wherein the second party's data retention settings for the respective data object differ from the second party's default data retention settings for the project entity.

### Claim 18

A method carried out by a computing system, the method comprising:
receiving, from a first party, a first request to create a project entity for a construction project;
after receiving the first request to create the project entity:
creating the project entity for the construction project;
establishing a first data connection between the first party and the project entity; and
defining the first party's default data retention settings for the project entity;
receiving, from the first party, a second request to create a first set of one or more data objects associated with the project entity, wherein the second request comprises data defining the first set of one or more data objects associated with the project entity;
for each respective data object in the first set of one or more data objects associated with the project entity:
creating the respective data object;
establishing a respective data connection between the first party and the respective data object; and
defining the first party's data retention settings for the respective data object;
receiving, from the first party, data defining an invitation for a second party to collaborate on the project entity for the construction project, wherein the invitation includes the first party's proposal of the second party's default data retention settings for the project entity;
receiving, from the second party, an indication that the second party has accepted the first party's invitation to collaborate on the project entity for the construction project; and
after receiving the indication that the second party has accepted the first party's invitation to collaborate:
establishing a second data connection between the second party and the project entity;
based on the first party's proposal of the second party's default data retention settings for the project entity, defining the second party's default data retention settings for the project entity;
establishing a respective data connection between the second party and each respective data object in the first set of one or more data objects; and
defining the second party's data retention settings for each respective data object in the first set of one or more data objects to match the second party's default data retention settings for the project entity.

### Claim 19 (depends on 18)

The method of claim 18, further comprising:
receiving a second indication that collaboration between the first party and the second party has ended; and
after receiving the second indication that collaboration between the first party and the second party has ended:
determining, in accordance with the second party's defined data retention settings for each respective data object in the first set of one or more data objects, a level of retention for the second party's data retention of each respective data object in the first set of one or more data objects.

### Claim 20 (depends on 18)

The method of claim 18, further comprising:
receiving, from the first party, a third request to delete a given data object in the first set of one or more data objects; and
after receiving the third request to delete the given data object in the first set of one or more data objects:
determining, in accordance with the second party's defined data retention settings for each respective data object in the first set of one or more data objects, a level of retention for the second party's data retention of the given data object.
