# US 2022/0284331 A1 · Predictive data analysis techniques using predictive threshold optimization and probabilistic automated programming

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0284331 A1
- Document ID: US20220284331A1
- Status: Published application
- Kind: A1
- Application number: 17/192,543
- Filed: 2021-03-04
- Published: 2022-09-08
- Earliest claimed: 2021-03-04
- Assignees: UnitedHealth Group Incorporated
- Applicants: UnitedHealth Group Incorporated
- Inventors: Veronica Aispuro; Anthony Rossini
- Web page: https://patentgrep.com/patent/US20220284331A1

## CPC

- G06N 7/01: Probabilistic graphical models, e.g. probabilistic networks
- G06N 20/00: Machine learning
- G06F 8/30: Creation or generation of source code
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

There is a need for more effective and efficient threshold-based predictive data analysis. This need can be addressed by, for example, solutions for performing predictive threshold optimization using probabilistic automated programming. In one example, a method includes determining an initial historical distribution for a measure based on historical measurement data associated with the measure; determining a calibrated historical distribution for the measure based on the initial historical distribution; determining projected distributions for the measure based on a projected trend for the predictive distribution, wherein the projected trend is determined based on the calibrated historical distribution; determining a projected cut point threshold predictions for the measure based on a predefined number of projected sampled simulations, wherein the predefined number of projected sampled simulations are determined based on the projected distributions; and performing one or more prediction-based actions based on the projected cut point threshold projections.

## Claims

### Claim 1

A computer-implemented method for performing predictive threshold optimization using probabilistic automated programming, the computer-implemented method comprising:
determining, by one or more processors, an initial historical distribution for a measure based at least in part on historical measurement data associated with the measure;
determining, by the one or more processors, a calibrated historical distribution for the measure based at least in part on the initial historical distribution, wherein: (i) determining the calibrated historical distribution is performed based at least in part on comparing one or more predicted historical cut point threshold ranges and one or more ground-truth historical cut point threshold values, (ii) the one or more predicted historical cut point threshold ranges are determined based at least in part on a predefined number of historical sampled simulations, and (iii) the predefined number of historical sampled simulations are determined based at least in part on the initial historical distribution;
determining, by the one or more processors, one or more projected distributions for the measure based at least in part on a projected trend for the predictive distribution, wherein the projected trend is determined based at least in part on the calibrated historical distribution;
determining, by the one or more processors, a plurality of projected cut point threshold predictions for the measure based at least in part on a predefined number of projected sampled simulations, wherein the predefined number of projected sampled simulations are determined based at least in part on the one or more projected distributions; and
performing, by the one or more processors, one or more prediction-based actions based at least in part on the plurality of projected cut point threshold projections.

### Claim 2 (depends on 1)

The computer-implemented method of claim 1, wherein determining the calibrated historical distribution comprises:
for each cut point threshold of a plurality of cut point thresholds:
determining, by the one or more processors, a target predicted historical cut point threshold range of the plurality of predicted historical cut point threshold ranges that is associated with the cut point threshold based at least in part on the predefined number of historical sampled simulations,
identifying, by the one or more processors, a target ground-truth historical cut point threshold value of the plurality of ground-truth historical cut point threshold values that is associated with the cut point threshold, and
determining, by the one or more processors, a per-threshold calibration conclusion based at least in part on comparing the target predicted historical cut point threshold range and the target ground-truth historical cut point threshold value; and
generating the calibrated historical distribution based at least in part on each per-threshold calibration conclusion for a cut point threshold of the plurality of cut point thresholds.

### Claim 3 (depends on 2)

The computer-implemented method of claim 2, wherein each per-threshold calibration conclusion for a cut point threshold of the plurality of cut point thresholds describes at least one of one or more historical data adjustment operations or one or more historical distribution adjustment operations.

### Claim 4 (depends on 3)

The computer-implemented method of claim 3, wherein the one or more historical data adjustment operations comprise removing extreme outliers from the historical measurement data.

### Claim 5 (depends on 3)

The computer-implemented method of claim 3, wherein the one or more historical distribution adjustment operations comprises modifying a distribution type of the initial historical distribution from a current distribution type to an outlier-aware distribution type.

### Claim 6 (depends on 3)

The computer-implemented method of claim 3, wherein comparing the target predicted historical cut point threshold range and the target ground-truth historical cut point threshold value comprises determining whether the target ground-truth historical cut point threshold value falls within a high-mass region of the target predicted historical cut point threshold range.

### Claim 7 (depends on 1)

The computer-implemented method of claim 1, wherein:
the calibrated historical distribution is selected from a plurality of calibrated historical distributions,
each calibrated historical distribution of the plurality of calibrated historical distributions is associated with a historical temporal unit of the plurality of historical temporal units, and
determining the projected trend comprises:
for each historical temporal unit of the plurality of historical temporal units, determining, by the one or more processors, a historical distribution parameter subset based at least in part on the calibrated historical distribution of the plurality of calibrated historical distributions that is associated with the historical temporal unit,
determining, by the one or more processors, a historical trend based at least in part on each historical distribution parameter subset for a temporal historical temporal unit of the plurality of historical temporal units, and
determining, by the one or more processors, the projected trend based at least in part on the historical trend.

### Claim 8 (depends on 1)

The computer-implemented method of claim 1, wherein the projected trend describes a projected distribution parameter subset for each projected temporal unit of one or more projected temporal units.

### Claim 9 (depends on 8)

The computer-implemented method of claim 8, wherein the one or more projected distributions comprise a projected distribution for each projected temporal unit of the one or more projected temporal units that is determined based at least in part on the projected historical distribution parameter subset for the projected temporal unit.

### Claim 10

An apparatus for performing predictive threshold optimization using probabilistic automated programming, the apparatus comprising at least one processor and at least one memory including program code, the at least one memory and the program code configured to, with the processor, cause the apparatus to at least:
determine an initial historical distribution for a measure based at least in part on historical measurement data associated with the measure;
determine a calibrated historical distribution for the measure based at least in part on the initial historical distribution, wherein: (i) determining the calibrated historical distribution is performed based at least in part on comparing one or more predicted historical cut point threshold ranges and one or more ground-truth historical cut point threshold values, (ii) the one or more predicted historical cut point threshold ranges are determined based at least in part on a predefined number of historical sampled simulations, and (iii) the predefined number of historical sampled simulations are determined based at least in part on the initial historical distribution;
determine one or more projected distributions for the measure based at least in part on a projected trend for the predictive distribution, wherein the projected trend is determined based at least in part on the calibrated historical distribution;
determine a plurality of projected cut point threshold predictions for the measure based at least in part on a predefined number of projected sampled simulations, wherein the predefined number of projected sampled simulations are determined based at least in part on the one or more projected distributions; and
perform one or more prediction-based actions based at least in part on the plurality of projected cut point threshold projections.

### Claim 11 (depends on 10)

The apparatus of claim 10, wherein determining the calibrated historical distribution comprises:
for each cut point threshold of a plurality of cut point thresholds:
determining a target predicted historical cut point threshold range of the plurality of predicted historical cut point threshold ranges that is associated with the cut point threshold based at least in part on the predefined number of historical sampled simulations,
identifying a target ground-truth historical cut point threshold value of the plurality of ground-truth historical cut point threshold values that is associated with the cut point threshold, and
determining a per-threshold calibration conclusion based at least in part on comparing the target predicted historical cut point threshold range and the target ground-truth historical cut point threshold value; and
generating the calibrated historical distribution based at least in part on each per-threshold calibration conclusion for a cut point threshold of the plurality of cut point thresholds.

### Claim 12 (depends on 11)

The apparatus of claim 11, wherein each per-threshold calibration conclusion for a cut point threshold of the plurality of cut point thresholds describes at least one of one or more historical data adjustment operations or one or more historical distribution adjustment operations.

### Claim 13 (depends on 12)

The apparatus of claim 12, wherein the one or more historical distribution adjustment operations comprises modifying a distribution type of the initial historical distribution from a current distribution type to an outlier-aware distribution type.

### Claim 14 (depends on 12)

The apparatus of claim 12, wherein comparing the target predicted historical cut point threshold range and the target ground-truth historical cut point threshold value comprises determining whether the target ground-truth historical cut point threshold value falls within a high-mass region of the target predicted historical cut point threshold range.

### Claim 15 (depends on 10)

The apparatus of claim 10, wherein:
the calibrated historical distribution is selected from a plurality of calibrated historical distributions,
each calibrated historical distribution of the plurality of calibrated historical distributions is associated with a historical temporal unit of the plurality of historical temporal units, and
determining the projected trend comprises:
for each historical temporal unit of the plurality of historical temporal units, determining a historical distribution parameter subset based at least in part on the calibrated historical distribution of the plurality of calibrated historical distributions that is associated with the historical temporal unit,
determining a historical trend based at least in part on each historical distribution parameter subset for a temporal historical temporal unit of the plurality of historical temporal units, and
determining the projected trend based at least in part on the historical trend.

### Claim 16 (depends on 10)

The apparatus of claim 10, wherein the projected trend describes a projected distribution parameter subset for each projected temporal unit of one or more projected temporal units.

### Claim 17 (depends on 16)

The apparatus of claim 16, wherein the one or more projected distributions comprise a projected distribution for each projected temporal unit of the one or more projected temporal units that is determined based at least in part on the projected historical distribution parameter subset for the projected temporal unit.

### Claim 18

A computer program product for performing predictive threshold optimization using probabilistic automated programming, the computer program product comprising at least one non-transitory computer-readable storage medium having computer-readable program code portions stored therein, the computer-readable program code portions configured to:
determine an initial historical distribution for a measure based at least in part on historical measurement data associated with the measure;
determine a calibrated historical distribution for the measure based at least in part on the initial historical distribution, wherein: (i) determining the calibrated historical distribution is performed based at least in part on comparing one or more predicted historical cut point threshold ranges and one or more ground-truth historical cut point threshold values, (ii) the one or more predicted historical cut point threshold ranges are determined based at least in part on a predefined number of historical sampled simulations, and (iii) the predefined number of historical sampled simulations are determined based at least in part on the initial historical distribution;
determine one or more projected distributions for the measure based at least in part on a projected trend for the predictive distribution, wherein the projected trend is determined based at least in part on the calibrated historical distribution;
determine a plurality of projected cut point threshold predictions for the measure based at least in part on a predefined number of projected sampled simulations, wherein the predefined number of projected sampled simulations are determined based at least in part on the one or more projected distributions; and
perform one or more prediction-based actions based at least in part on the plurality of projected cut point threshold projections.

### Claim 19 (depends on 18)

The computer program product of claim 18, wherein determining the calibrated historical distribution comprises:
for each cut point threshold of a plurality of cut point thresholds:
determining a target predicted historical cut point threshold range of the plurality of predicted historical cut point threshold ranges that is associated with the cut point threshold based at least in part on the predefined number of historical sampled simulations,
identifying a target ground-truth historical cut point threshold value of the plurality of ground-truth historical cut point threshold values that is associated with the cut point threshold, and
determining a per-threshold calibration conclusion based at least in part on comparing the target predicted historical cut point threshold range and the target ground-truth historical cut point threshold value; and
generating the calibrated historical distribution based at least in part on each per-threshold calibration conclusion for a cut point threshold of the plurality of cut point thresholds.

### Claim 20 (depends on 18)

The computer program product of claim 18, wherein:
the calibrated historical distribution is selected from a plurality of calibrated historical distributions,
each calibrated historical distribution of the plurality of calibrated historical distributions is associated with a historical temporal unit of the plurality of historical temporal units, and
determining the projected trend comprises:
for each historical temporal unit of the plurality of historical temporal units, determining a historical distribution parameter subset based at least in part on the calibrated historical distribution of the plurality of calibrated historical distributions that is associated with the historical temporal unit,
determining a historical trend based at least in part on each historical distribution parameter subset for a temporal historical temporal unit of the plurality of historical temporal units, and
determining the projected trend based at least in part on the historical trend.
