# US 2022/0284325 A1 · Device of predicting, medium of predicting, and method of predicting production index using moving object stay number

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0284325 A1
- Document ID: US20220284325A1
- Status: Published application
- Kind: A1
- Application number: 17/652,560
- Filed: 2022-02-25
- Published: 2022-09-08
- Earliest claimed: 2021-03-03
- Assignees: Toyota Jidosha Kabushiki Kaisha
- Applicants: Toyota Jidosha Kabushiki Kaisha
- Inventors: Takuya KANEKO; Yutaro MISHIMA; Shinya WADA; Rui KIMURA; Ryota OSUMI; Noriaki SAITOH
- Web page: https://patentgrep.com/patent/US20220284325A1

## CPC

- G06N 5/04: Inference or reasoning models
- G06N 5/022: Knowledge engineering; Knowledge acquisition
- G06Q 30/0206: {Price or cost determination based on market factors}
- G06N 20/00: Machine learning
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A prediction device includes one or more processors configured to record a number of moving objects staying in a predetermined production area for every predetermined period, record an actual production index for each predetermined period, estimate a correlation coefficient by using training data that associates the number of moving objects staying in the predetermined production area with the actual production index for the predetermined period, and calculate a predicted production index for a target period based on a number of moving objects staying for the target period, using the correlation coefficient.

## Claims

### Claim 1

A prediction device that predicts a production index, the prediction device comprising one or more processors configured to
record a number of moving objects staying in a predetermined production area for every predetermined period,
record an actual production index for each predetermined period,
estimate a correlation coefficient by using training data that associates the number of moving objects staying in the predetermined production area with the actual production index for the predetermined period, and
calculate a predicted production index for a target period based on a number of moving objects staying for the target period, using the correlation coefficient.

### Claim 2 (depends on 1)

The prediction device according to claim 1, wherein the production index is a mining and industrial production index, and the predetermined production area is a mining and industrial zone area.

### Claim 3 (depends on 1)

The prediction device according to claim 1, wherein:
the one or more processors further include a position information database configured to collect and store position information of the moving objects via a wireless network from a positioning unit mounted on at least one of a mobile terminal possessed by an individual or a communication terminal installed in a vehicle; and
the one or more processors are configured to calculate the number of moving objects based on the position information of the moving objects stored in the position information database.

### Claim 4 (depends on 1)

The prediction device according to claim 1, wherein the one or more processors are configured to estimate the correlation coefficient based on linear regression.

### Claim 5 (depends on 1)

The prediction device according to claim 1, wherein:
the one or more processors are further configured to compare the predicted production index predicted for the target period with a forecast production index market-forecasted for the target period; and
the one or more processors are configured to
predict a rising fluctuation of the forecast production index when the predicted production index is larger than the forecast production index by a first value which is more than an upper threshold value, and
predict a falling fluctuation of the forecast production index when the forecast production index is larger than the predicted production index by a second value which is more than a lower threshold value.

### Claim 6 (depends on 5)

The prediction device according to claim 5, wherein:
the one or more processors are configured to determine the upper threshold value and the lower threshold value; and
the one or more processors are configured to
calculate a first variance based on an error between the actual production index and the predicted production index for the target period,
V1=1/(n−1)·Σ(P(t)−A(t))2
where V1 is the first variance, A(t) is the actual production index, and P(t) is the predicted production index,
calculate a second variance based on an error between the actual production index and the forecast production index for the target period,
V2=1/(n−1)·Σ(C(t)−A(t))2
where V2 is the second variance, C(t) is the forecast production index, and A(t) is the actual production index, and
determine the upper threshold value and the lower threshold value based on a square root (√(V1+V2)) in a sum of the first variance and the second variance.

### Claim 7 (depends on 6)

The prediction device according to claim 6, wherein the one or more processors are configured to determine the upper threshold value and the lower threshold value as the same value as follows
U(t)=D(t)=σ×√(V1+V2)
where σ: coefficient (1.96 when the coefficient is based on error normal distribution), U(t) is the upper threshold value, and D(t) is the lower threshold value.

### Claim 8 (depends on 1)

The prediction device according to claim 1, wherein:
the one or more processors are further configured to
record a securities price of a financial product for every predetermined period,
estimate a regression function by using training data that associates the actual production index for the predetermined period with the securities price for the predetermined period and,
S(i,t)=fi(A(t))+ε
where S(i,t) is the securities price, fi is the regression function, A(t) is the actual production index, and ε is an error,
calculate a predicted securities price for a target period from a predicted production index for the target period using the regression function,
SS=fi(P(t))
where SS is the predicted securities price, fi is the regression function, and P(t) is the predicted production index, and
instruct a difference between the predicted securities price and an actual securities price as an adjustment for a rise or a fall in the actual securities price; and
the one or more processors are configured to
predict that a securities price rises when the predicted securities price is larger than the securities price based on the actual production index by a first predetermined threshold value or more, and
predict that a securities price falls when the predicted securities price is smaller than the securities price based on the actual production index by a second predetermined threshold value or more.

### Claim 9

A non-transitory storage medium storing instructions that cause a computer installed in a device that predicts a production index to perform functions, the non-transitory storage medium comprising:
recording a number of moving objects staying in a predetermined production area for every predetermined period;
recording an actual production index for each predetermined period;
estimating a correlation coefficient by using training data that associates the number of moving objects staying in the predetermined production area with the actual production index for the predetermined period, and;
calculating a predicted production index for a target period based on a number of moving objects staying for the target period, using the correlation coefficient.

### Claim 10

A method of predicting a production index of a device, the device being configured to record a number of moving objects staying in a predetermined production area for every predetermined period and record an actual production index for each predetermined period, the method comprising:
estimating a correlation coefficient by using training data that associates the number of moving objects staying in the predetermined production area with the actual production index for the predetermined period; and
calculating a predicted production index for a target period based on a number of moving objects staying for the target period, using the correlation coefficient.
