# US 2022/0284278 A1 · Estimating remaining useful life based on operation and degradation characteristics

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0284278 A1
- Document ID: US20220284278A1
- Status: Published application
- Kind: A1
- Application number: 17/190,607
- Filed: 2021-03-03
- Published: 2022-09-08
- Earliest claimed: 2021-03-03
- Assignees: International Business Machines Corporation
- Applicants: International Business Machines Corporation
- Inventors: Shengrong Tang; Jonathan Tristan O'Gorman; Amaresh Rajasekharan
- Web page: https://patentgrep.com/patent/US20220284278A1

## CPC

- G06N 3/08: Learning methods
- G06N 3/04: Architecture, e.g. interconnection topology
- G06N 3/044: Recurrent networks, e.g. Hopfield networks
- G06N 3/0442: characterised by memory or gating, e.g. long short-term memory [LSTM] or gated recurrent units [GRU]
- G06N 3/09: Supervised learning
- G06N 3/096: Transfer learning
- G06N 3/0985: Hyperparameter optimisation; Meta-learning; Learning-to-learn
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS

## Abstract

Methods, computer program products, and/or systems are provided that perform the following operations: obtaining asset data; determining an asset class associated with the asset data; initializing a new neural network model, wherein the new neural network model is initialized based on a pretrained model associated with the asset class; training the new neural network model based, at least in part, on the asset data to obtain a trained remaining useful life model; and deploying the trained remaining useful life model to generate prediction data for one or more assets as output of the trained remaining useful life model.

## Claims

### Claim 1

A computer-implemented method comprising:
obtaining asset data;
determining an asset class associated with the asset data;
initializing a new neural network model based, at least in part, on a pretrained model associated with the asset class;
training the new neural network model based, at least in part, on the asset data to obtain a trained remaining useful life model; and
deploying the trained remaining useful life model to generate prediction data for one or more assets as output of the trained remaining useful life model.

### Claim 2 (depends on 1)

The computer-implemented method of claim 1, further comprising:
preprocessing the asset data obtained, wherein preprocessing the asset data includes:
decomposing time series data included in the asset data in terms of chronological cycles and duration of operation, wherein the time series data is associated with an asset;
obtaining age data associated with the asset;
generating a factor representing asset degradation based, at least in part, on the age data associated with the asset;
obtaining one or more pertinent features associated with the asset;
scaling the one or more pertinent features; and
transforming a feature set to a two-dimension tensor, wherein the feature set includes the one or more scaled pertinent features.

### Claim 3 (depends on 1)

The computer-implemented method of claim 1, further comprising tuning a scoring function based on a criticality of a remaining useful life prediction for the one or more assets, wherein the scoring function penalizes for over-estimation of remaining useful life for critical assets.

### Claim 4 (depends on 1)

The computer-implemented method of claim 1, further comprising tuning a scoring function based on a priority of the one or more assets, wherein the scoring function penalizes for over-estimation of remaining useful life for critical assets.

### Claim 5 (depends on 1)

The computer-implemented method of claim 1, wherein training the new neural network model to obtain the trained remaining useful life model includes:
tuning hyperparameters associated with the new neural network model weighted using a scoring function, wherein a goal of the tuning is to optimize an error metric;
determining that the scoring function and the error metric are satisfactory based, in part, on one or more conditions; and
providing the trained remaining useful life model as output in response to determining that the scoring function and the error metric are satisfactory.

### Claim 6 (depends on 5)

The computer-implemented method of claim 5, wherein the error metric includes a measure of a prediction error for a defined critical period associated with asset remaining useful life.

### Claim 7 (depends on 1)

The computer-implemented method of claim 1, wherein the new neural network model is a long short-term memory neural network model.

### Claim 8 (depends on 1)

The computer-implemented method of claim 1, wherein the asset data includes time series data associated with a set of assets to be analyzed.

### Claim 9 (depends on 1)

The computer-implemented method of claim 1, wherein a plurality of pretrained models, including the pretrained model associated with the asset class, are pretrained using training data which includes time series data for a set of asset classes,
wherein initializing the new neural network model based, at least in part, on the pretrained model associated with the asset class comprises initializing one or more weights and one or more layers of the neural network based, at least in part, on the pretrained model associated with the asset class.

### Claim 10 (depends on 1)

The computer-implemented method of claim 1, further comprising:
obtaining remaining useful life data for the one or more assets as output from the trained remaining useful life model; and
providing the remaining useful life prediction data to assist in managing the one or more assets.

### Claim 11

A computer program product comprising a computer readable storage medium having stored thereon:
program instructions programmed to obtain asset data;
program instructions programmed to determine an asset class associated with the asset data;
program instructions programmed to initialize a new neural network model, wherein the new neural network model is initialized based on a pretrained model associated with the asset class;
program instructions programmed to train the new neural network model based, at least in part, on the asset data to obtain a trained remaining useful life model; and
program instructions programmed to deploy the trained remaining useful life model to generate prediction data for one or more assets as output of the trained remaining useful life model.

### Claim 12 (depends on 11)

The computer program product of claim 11, the computer readable storage medium having further stored thereon:
program instructions programmed to preprocess the asset data obtained, wherein preprocessing the asset data includes:
decomposing time series data included in the asset data in terms of chronological cycles and duration of operation, wherein the time series data is associated with an asset;
obtaining age data associated with the asset;
generating a factor representing asset degradation based, at least in part, on the age data associated with the asset;
obtaining one or more pertinent features associated with the asset;
scaling the one or more pertinent features; and
transforming a feature set to a two-dimension tensor, wherein the feature set includes the one or more scaled pertinent features.

### Claim 13 (depends on 11)

The computer program product of claim 11, the computer readable storage medium having further stored thereon:
program instructions programmed to tune a scoring function based on a criticality of a remaining useful life prediction for the one or more assets, wherein the scoring function penalizes for over-estimation of remaining useful life for critical assets.

### Claim 14 (depends on 11)

The computer program product of claim 11, the computer readable storage medium having further stored thereon:
program instructions programmed to tune a scoring function based on a priority of the one or more assets, wherein the scoring function penalizes for over-estimation of remaining useful life for critical assets.

### Claim 15 (depends on 11)

The computer program product of claim 11, wherein training the new neural network model to obtain the trained remaining useful life model includes:
tuning hyperparameters associated with the new neural network model weighted using a scoring function, wherein a goal of the tuning is to optimize an error metric, wherein the error metric includes a measure of a prediction error for a defined critical period associated with asset remaining useful life;
determining that the scoring function and the error metric are satisfactory based, in part, on one or more conditions; and
providing the trained remaining useful life model as output in response to determining that the scoring function and the error metric are satisfactory.

### Claim 16 (depends on 11)

The computer program product of claim 11, wherein initializing the new neural network model based, at least in part, on the pretrained model associated with the asset class includes initializing one or more weights and one or more layers of the neural network based, at least in part, on the pretrained model associated with the asset class; wherein the new neural network model is associated with the neural network.

### Claim 17

A computer system comprising:
a processor set; and
a computer readable storage medium;
wherein:
the processor set is structured, located, connected and programmed to run program instructions stored on the computer readable storage medium; and
the stored program instructions include:
program instructions programmed to obtain asset data;
program instructions programmed to determine an asset class associated with the asset data;
program instructions programmed to initialize a new neural network model, wherein the new neural network model is initialized based on a pretrained model associated with the asset class;
program instructions programmed to train the new neural network model based, at least in part, on the asset data to obtain a trained remaining useful life model; and
program instructions programmed to deploy the trained remaining useful life model to generate prediction data for one or more assets as output of the trained remaining useful life model.

### Claim 18 (depends on 17)

The computer system of claim 17, wherein the stored program instructions further include:
program instructions programmed to preprocess the asset data obtained, wherein preprocessing the asset data includes:
decomposing time series data included in the asset data in terms of chronological cycles and duration of operation, wherein the time series data is associated with an asset;
obtaining age data associated with the asset;
generating a factor representing asset degradation based, at least in part, on the age data associated with the asset;
obtaining one or more pertinent features associated with the asset;
scaling the one or more pertinent features; and
transforming a feature set to a two-dimension tensor, wherein the feature set includes the one or more scaled pertinent features.

### Claim 19 (depends on 17)

The computer system of claim 17, wherein training the new neural network model to obtain the trained remaining useful life model includes:
tuning hyperparameters associated with the new neural network model weighted using a scoring function, wherein the scoring function penalizes for over-estimation of remaining useful life for critical assets, wherein a goal of the tuning is to optimize an error metric, and wherein the error metric includes a measure of a prediction error for a defined critical period associated with asset remaining useful life;
determining that the scoring function and the error metric are satisfactory based, in part, on one or more conditions; and
providing the trained remaining useful life model as output in response to determining that the scoring function and the error metric are satisfactory.

### Claim 20 (depends on 17)

The computer system of claim 17, wherein initializing the new neural network model based, at least in part, on the pretrained model associated with the asset class includes initializing one or more weights and one or more layers of the neural network based, at least in part, on the pretrained model associated with the asset class; wherein the new neural network model is associated with the neural network.