# US 2022/0284148 A1 · System and method of managing a design lifecycle of a structural part

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0284148 A1
- Document ID: US20220284148A1
- Status: Published application
- Kind: A1
- Application number: 17/665,097
- Filed: 2022-02-04
- Published: 2022-09-08
- Earliest claimed: 2021-03-05
- Assignees: The Boeing Company
- Applicants: The Boeing Company
- Inventors: Eric S. Lester; Samir Abad; George Bojko; Abul Azad; Venkata Narasimha Ravi Udali; Vivek Mohan
- Web page: https://patentgrep.com/patent/US20220284148A1

## CPC

- G06F 30/15: Vehicle, aircraft or watercraft design
- G06F 30/17: Mechanical parametric or variational design
- G06F 30/20: Design optimisation, verification or simulation (optimisation, verification or simulation of circuit designs G06F30/30)
- G06Q 30/0625: {by formulating product or service queries, e.g. using keywords or predefined options}
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A method of managing a design lifecycle of a structural part includes accessing memory storing computer-readable program code for identifying a supplier for the structural part. The method includes executing the code to cause an apparatus to identify the supplier. The method also includes generating a first design of the structural part, the first design describing a geometry of the structural part and requirements for attributes of the structural part. The method also includes performing a search of a database of existing designs for a second design based on search criteria including multiple ones of the geometry and the requirements, and selecting a design from the first design and the second design based on the search. The method also includes performing a multiple-criteria decision analysis to evaluate the design, identifying the supplier from multiple suppliers, and outputting an indication of the supplier for use in ordering of the structural part.

## Claims

### Claim 1

A method of managing a design lifecycle of a structural part, the method comprising:
accessing memory storing computer-readable program code for identifying a supplier for the structural part; and
executing the computer-readable program code, via processing circuitry, to cause an apparatus to identify the supplier, including the apparatus at least:
generating a first design of the structural part, the first design describing a geometry of the structural part and requirements for attributes of the structural part including a rated capability, weight, and cost;
performing a search of a manufacturing database of existing designs for a second design of the structural part based on search criteria including multiple ones of the geometry and the requirements;
selecting a design from the first design and the second design based on the search, the second design selected when the second design matches the search criteria, and the first design selected when none of the existing designs match the search criteria;
performing a multiple-criteria decision analysis to evaluate the design based on multiple selection criteria including the attributes of different units of the structural part as manufactured by multiple suppliers according to the design;
identifying the supplier from the multiple suppliers based on the multiple-criteria decision analysis; and
outputting an indication of the supplier for use in ordering of the structural part from the supplier.

### Claim 2 (depends on 1)

The method of claim 1, wherein multiple second designs match the search criteria, and selecting the design includes determining an order of priority of the multiple second designs, and selecting the design from the multiple second designs according to the order of priority.

### Claim 3 (depends on 1)

The method of claim 1, wherein the structural part is a vehicle part, selecting the design includes selecting the second design, and performing the multiple-criteria decision analysis includes analyzing historical data for the second design, including usage of the vehicle part as manufactured according to the second design, and across multiple vehicles.

### Claim 4 (depends on 3)

The method of claim 3, wherein performing the multiple-criteria decision analysis includes performing data clustering in which the historical data is clustered by the multiple selection criteria based on parameters including one or more of a fixed number of clusters, a distance between a data point at a center of a cluster and other data points in the cluster, or a minimum number of data points in a cluster.

### Claim 5 (depends on 1)

The method of claim 1, wherein the structural part is a vehicle part, selecting the design includes selecting the second design, and the apparatus caused to identify the supplier further includes the apparatus at least:
determining demand and supply trends for the structural part as manufactured according to the second design, based on historical data for the second design; and
outputting a display of information including a demand and supply curve based on the demand and supply trends, the demand and supply curve informing at least one of a predicted demand or shortage in supply of the structural part.

### Claim 6 (depends on 5)

The method of claim 5, wherein outputting the display of information includes outputting the display of information further including costs and quantities of the structural part from respective ones of the multiple suppliers.

### Claim 7 (depends on 1)

The method of claim 1, wherein generating the first design comprises:
generating a three-dimensional (3D) model of the structural part based on the geometry and the requirements;
determining whether the 3D model meets safety requirements; and when the 3D model meets the safety requirements,
determining a cost of the structural part based on the 3D model; and
generating the first design based on at least the 3D model and the cost.

### Claim 8 (depends on 7)

The method of claim 7, wherein the structural part has geometric features including one or more tapers or holes, and generating the first design further comprises generating two-dimensional (2D) renderings of the structural part from the 3D model, and based on dimensions of the geometric features.

### Claim 9 (depends on 7)

The method of claim 7, wherein determining whether the 3D model meets safety requirements comprises determining whether the 3D model meets safety requirements for tension, compression, and thread shear.

### Claim 10 (depends on 7)

The method of claim 7, wherein when the 3D model does not meet the safety requirements, the method further comprises:
modifying one or more of the geometry or requirements of the structural part to meet the safety requirements; and
regenerating the 3D model based on the geometry and the requirements as modified.

### Claim 11

An apparatus for managing a design lifecycle of a structural part, the apparatus comprising:
memory configured to store computer-readable program code for identifying a supplier for the structural part; and
processing circuitry configured to access the memory and execute the computer-readable program code to cause the apparatus to identify the supplier, including the apparatus caused to at least:
generate a first design of the structural part, the first design describing a geometry of the structural part and requirements for attributes of the structural part including a rated capability, weight, and cost;
perform a search of a manufacturing database of existing designs for a second design of the structural part based on search criteria including multiple ones of the geometry and the requirements;
select a design from the first design and the second design based on the search, the second design selected when the second design matches the search criteria, and the first design selected when none of the existing designs match the search criteria;
perform a multiple-criteria decision analysis to evaluate the design based on multiple selection criteria including the attributes of different units of the structural part as manufactured by multiple suppliers according to the design;
identify the supplier from the multiple suppliers based on the multiple-criteria decision analysis; and
output an indication of the supplier for use in ordering of the structural part from the supplier.

### Claim 12 (depends on 1)

The apparatus of claim 1, wherein multiple second designs match the search criteria, and the apparatus caused to select the design includes the apparatus caused to determine an order of priority of the multiple second designs, and select the design from the multiple second designs according to the order of priority.

### Claim 13 (depends on 1)

The apparatus of claim 1, wherein the structural part is a vehicle part, the apparatus caused to select the design includes the apparatus caused to select the second design, and the apparatus caused to perform the multiple-criteria decision analysis includes the apparatus caused to analyze historical data for the second design, including usage of the vehicle part as manufactured according to the second design, and across multiple vehicles.

### Claim 14 (depends on 1)

The apparatus of claim 1, wherein the apparatus caused to perform the multiple-criteria decision analysis includes the apparatus caused to perform data clustering in which the historical data is clustered by the multiple selection criteria based on parameters including one or more of a fixed number of clusters, a distance between a data point at a center of a cluster and other data points in the cluster, or a minimum number of data points in a cluster.

### Claim 15 (depends on 1)

The apparatus of claim 1, wherein the structural part is a vehicle part, the apparatus caused to select the design includes the apparatus caused to select the second design, and the apparatus caused to identify the supplier further includes the apparatus caused to at least:
determine demand and supply trends for the structural part as manufactured according to the second design, based on historical data for the second design; and
output a display of information including a demand and supply curve based on the demand and supply trends, the demand and supply curve informing at least one of a predicted demand or shortage in supply of the structural part.

### Claim 16 (depends on 15)

The apparatus of claim 15, wherein the apparatus caused to output the display of information includes the apparatus caused to output the display of information further including costs and quantities of the structural part from respective ones of the multiple suppliers.

### Claim 17 (depends on 1)

The apparatus of claim 1, wherein the apparatus caused to generate the first design further includes the apparatus caused to:
generate a three-dimensional (3D) model of the structural part based on the geometry and the requirements;
determine whether the 3D model meets safety requirements; and when the 3D model meets the safety requirements,
determine a cost of the structural part based on the 3D model; and
generate the first design based on at least the 3D model and the cost.

### Claim 18 (depends on 17)

The apparatus of claim 17, wherein the structural part has geometric features including one or more tapers or holes, and the apparatus caused to generate the first design further comprises the apparatus caused to generate two-dimensional (2D) renderings of the structural part from the 3D model, and based on dimensions of the geometric features.

### Claim 19 (depends on 17)

The apparatus of claim 17, wherein the apparatus caused to determine whether the 3D model meets safety requirements comprises the apparatus caused to determine whether the 3D model meets safety requirements for tension, compression, and thread shear.

### Claim 20 (depends on 17)

The apparatus of claim 17, wherein when the 3D model does not meet the safety requirements, the apparatus further caused to:
modify one or more of the geometry or requirements of the structural part to meet the safety requirements; and
regenerate the 3D model based on the geometry and the requirements as modified.
