# US 2022/0283802 A1 · Automation of task identification in a software lifecycle

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0283802 A1
- Document ID: US20220283802A1
- Status: Published application
- Kind: A1
- Application number: 17/825,097
- Filed: 2022-05-26
- Published: 2022-09-08
- Earliest claimed: 2018-11-19
- Assignees: Security Compass Technologies Ltd.
- Applicants: Security Compass Technologies Ltd.
- Inventors: Nishchal Bhalla; Rohit Kumar Sethi; Ramanan Sivaranjan; Ehsan Foroughi; Geoffrey Charles Whittington
- Web page: https://patentgrep.com/patent/US20220283802A1

## CPC

- G06F 8/71: Version control (security arrangements therefor G06F21/57); Configuration management
- G06F 8/70: Software maintenance or management
- G06F 8/75: Structural analysis for program understanding
- G06F 21/563: {by source code analysis}
- G06F 21/577: {Assessing vulnerabilities and evaluating computer system security}
- G06N 5/02: Knowledge representation; Symbolic representation
- G06N 5/022: Knowledge engineering; Knowledge acquisition
- G06Q 10/06313: {Resource planning in a project environment}
- G06F 2221/033: Test or assess software
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A system and method for automation of task identification and control in a software lifecycle. Software context for a software asset is extracted from context repositories of the software asset during software development and operation, the extracted context data is matched to relevant tasks in a knowledge database to select tasks for the software asset, and task prioritization and orchestration are presented in a prioritized task list during a software lifecycle.

## Claims

### Claim 1

A computer-implemented method for task identification for a software asset, the method comprising:
in a processor, on an ongoing basis, extracting context data from a context repository of the software asset by scanning the context repository using one or more data scraping tool, the context data comprising technical and operational properties, and execution environment of the software asset;
in a processor, performing a meta analysis on the extracted context data to generate a context profile for the software asset, the context profile comprising system source and file structure data, a set of dependencies in use by the software asset, and at least one configuration file describing how the software asset should be configured;
matching the context profile to relevant task requirements in a knowledge database comprising a plurality of task requirements accessible with a retrieval tool by matching the context profile and extracted context data with corresponding tagged requirements in the knowledge database, each task requirement comprising task guidelines and actionable guidance to orchestrate software development and one or more tags delineating its relevance to a particular software context;
selecting the task requirements specific to the software asset based on the context profile;
generating a prioritized task list comprising the matched task requirements for the software asset;
updating the prioritized task list throughout the software lifecycle when updates are made to the context repository or knowledge database that are relevant to the software asset and pushing the updates to the prioritized task list for ongoing software asset management; and
presenting the prioritized task list on a user interface.

### Claim 2 (depends on 1)

The method of claim 1, wherein the context data is stored in at least one configuration management repository.

### Claim 3 (depends on 1)

The method of claim 1, wherein generating the prioritized task list is based on a security risk of each of the selected task requirements.

### Claim 4 (depends on 1)

The method of claim 1, wherein tasks that are identified as susceptible to security risk are automatically escalated on the task list.

### Claim 5 (depends on 1)

The method of claim 1, wherein the at least one configuration file comprises one or more of:
details to initialize the software asset;
instructions for how the software asset should behave; and
information to support the deployment of the software asset.

### Claim 6 (depends on 1)

The method of claim 1, wherein the at least one configuration file comprises at least one of what libraries should be installed, web server configuration, firewall rules, user access rules, and network access details.

### Claim 7 (depends on 1)

The method of claim 1, wherein operational properties of the software asset comprise resource constraints of the software asset.

### Claim 8 (depends on 7)

The method of claim 7, wherein the resource constraints comprise at least one of processor speed, memory, disk space, and network bandwidth.

### Claim 9 (depends on 1)

The method of claim 1, wherein the context repository is a system of record.

### Claim 10 (depends on 1)

The method of claim 1, wherein the context repository comprises one or more of specification of the physical server where the software asset is stored, which licenses are required to use a third party tool, a fact-based description of the software asset, and where the software asset will be or is deployed.

### Claim 11 (depends on 1)

The method of claim 1, wherein the context data is stored in a test plan for validating functional or non-functional behaviors of the software asset.

### Claim 12 (depends on 11)

The method of claim 11, wherein the test plan in the form of one or more of natural language and in a computer-readable format.

### Claim 13 (depends on 11)

The method of claim 11, wherein the test plan includes one or more unit tests, full stack tests, regression tests, smoke tests, and performance tests.

### Claim 14 (depends on 1)

The method of claim 1, wherein the context data is gleaned from one or more of a system of record, source code, software specification, epic system, dependency management system, project management software, business management software, source code management (SCM) system, configuration management system, application lifecycle management system, test plan, and dependency library.

### Claim 15

A computerized system for task identification for a software asset, the system comprising:
a computer system comprising at least one processor, at least one memory device, and at least one network communication device; and
a context extraction engine stored in the at least one memory device comprising computer readable instructions, that when executed by the at least one processor cause the at least one processor to:
on an ongoing basis, extract context data from a context repository of the software asset by scanning the context repository using one or more data scraping tool, the context data comprising technical and operational properties, and execution environment of the software asset;
perform a meta analysis on the extracted context data to generate a context profile for the software asset, the context profile comprising system source and file structure data, a set of dependencies in use by the software asset, and at least one configuration file describing how the software asset should be configured;
match the context profile to relevant task requirements in a knowledge database comprising a plurality of task requirements accessible with a retrieval tool by matching the context profile and extracted context data with corresponding tagged requirements in the knowledge database, each task requirement comprising task guidelines and actionable guidance to orchestrate software development and one or more tags delineating its relevance to a particular software context;
select the task requirements specific to the software asset based on the context profile;
generate a prioritized task list comprising the matched task requirements for the software asset;
update the prioritized task list throughout the software lifecycle when updates are made to the context repository or knowledge database that are relevant to the software asset and pushing the updates to the prioritized task list for ongoing software asset management; and
present the prioritized task list on a user interface.

### Claim 16 (depends on 15)

The system of claim 15, wherein the at least one configuration file comprises one or more of:
details to initialize the software asset;
instructions for how the software asset should behave; and
information to support the deployment of the software asset.

### Claim 17 (depends on 15)

The system of claim 15, wherein the context repository comprises one or more of the specification of the physical server where the software assets is stored, which licenses are required to use a third party tool, a fact-based description of the software asset, and where the software will be or is deployed.

### Claim 18

A method for automation of task identification for a software asset, the method comprising:
in a processor, on an ongoing basis, extracting context data from a dynamic context repository of the software asset by scanning the context repository for context data using a data scraping tool, the context data comprising technical and operational properties, running environment, and execution environment of the software asset;
in a processor, performing a meta analysis on the extracted context data to generate a context profile for the software asset, the context profile comprising system source and file structure data and a set of dependencies in use by the software asset;
matching the extracted context data in the context profile to relevant task requirements in a knowledge database comprising a plurality of task requirements accessible with a retrieval tool by matching the context profile and extracted context data with corresponding tagged requirements in the knowledge database, each task requirement comprising task guidelines and actionable guidance to orchestrate software development and one or more tags delineating its relevance to a particular software context;
selecting the task requirements specific to the software asset based on the extracted context data;
generating a prioritized task list comprising the matched task requirements for the software asset based on a security risk of each of the selected task requirements;
updating the prioritized task list throughout the software lifecycle when updates are made to the dynamic context repository or knowledge database that are relevant to the software asset and pushing the updates to the prioritized task list for ongoing software asset management, wherein tasks that are identified as susceptible to security risk are automatically escalated on the task list; and
presenting the prioritized task list on a user interface.

### Claim 19 (depends on 18)

The method of claim 18, wherein performing a meta analysis on the extracted context data comprises identifying what linked libraries are used and identifying any vulnerabilities with any linked libraries.

### Claim 20 (depends on 18)

The method of claim 18, further comprising scanning source code of the software asset using a code scanner to identify any code vulnerabilities.
