# US 2022/0283575 A1 · Method and apparatus for monitoring operational characteristics of an industrial gas plant complex

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0283575 A1
- Document ID: US20220283575A1
- Status: Published application
- Kind: A1
- Application number: 17/193,040
- Filed: 2021-03-05
- Published: 2022-09-08
- Earliest claimed: 2021-03-05
- Assignees: Air Products and Chemicals, Inc.
- Applicants: Air Products and Chemicals, Inc.
- Inventors: Sanjay Mehta; Pratik Misra
- Web page: https://patentgrep.com/patent/US20220283575A1

## CPC

- G05B 13/0265: {the criterion being a learning criterion}
- G05B 23/0229: {knowledge based, e.g. expert systems; genetic algorithms}
- G05B 23/0235: {based on a comparison with predetermined threshold or range, e.g. "classical methods", carried out during normal operation; threshold adaptation or choice; when or how to compare with the threshold}
- G05B 23/0283: {Predictive maintenance, e.g. involving the monitoring of a system and, based on the monitoring results, taking decisions on the maintenance schedule of the monitored system; Estimating remaining useful life [RUL] (preventive maintenance, i.e. planning maintenance according to the available resources without monitoring the system G06Q10/06)}
- G06F 18/2148: {characterised by the process organisation or structure, e.g. boosting cascade}
- G06N 3/0442: characterised by memory or gating, e.g. long short-term memory [LSTM] or gated recurrent units [GRU]
- G06N 3/09: Supervised learning
- G06N 20/00: Machine learning
- G05B 2219/2639: Energy management, use maximum of cheap power, keep peak load low
- G06N 3/044: Recurrent networks, e.g. Hopfield networks
- G06N 5/01: Dynamic search techniques; Heuristics; Dynamic trees; Branch-and-bound
- G06N 20/10: using kernel methods, e.g. support vector machines [SVM]
- G06N 20/20: Ensemble learning
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS

## Abstract

There is provided a method of monitoring operational characteristics of an industrial gas plant complex comprising a plurality of industrial gas plants. The method being executed by at least one hardware processor and comprising: assigning a machine learning model to each of the industrial gas plants forming the industrial gas plant complex; training the respective machine learning model for each industrial gas plant based on received historical time-dependent operational characteristic data for the respective industrial gas plant; executing the trained machine learning model for each industrial gas plant to predict operational characteristics for each respective industrial gas plant for a pre-determined future time period; and comparing predicted operational characteristic data for each respective industrial gas plant for a pre-determined future time period with measured operational characteristic data for the corresponding time period to identify deviations in industrial gas plant performance.

## Claims

### Claim 1

A method of monitoring operational characteristics of an industrial gas plant complex comprising a plurality of industrial gas plants, the method being executed by at least one hardware processor, the method comprising:
assigning a machine learning model to each of the industrial gas plants forming the industrial gas plant complex;
training the respective machine learning model for each industrial gas plant based on received historical time-dependent operational characteristic data for the respective industrial gas plant;
executing the trained machine learning model for each industrial gas plant to predict operational characteristics for each respective industrial gas plant for a pre-determined future time period; and
comparing predicted operational characteristic data for each respective industrial gas plant for a pre-determined future time period with measured operational characteristic data for the corresponding time period to identify deviations in industrial gas plant performance.

### Claim 2 (depends on 1)

The method of claim 1, wherein the step of comparing is carried out at the end of the pre-determined future time period of the predicted operational characteristic data or at a timestamp therein.

### Claim 3 (depends on 1)

The method of claim 1, wherein the step of comparing comprises comparing predicted operational characteristic data predicted for a pre-determined time window with actual measured operational characteristic data for the same time window.

### Claim 4 (depends on 1)

The method of claim 1, wherein the received historical time-dependent operational characteristic data for the respective industrial gas plant comprises data obtained from a direct measurement of a process or parameter of the respective industrial gas plant.

### Claim 5 (depends on 1)

The method of claim 1, wherein the received historical time-dependent operational characteristic data for the respective industrial gas plant comprises data obtained from a physics-based model representative of operational characteristics of the respective industrial gas plant.

### Claim 6 (depends on 5)

The method of claim 5, wherein measured data relating to a process or parameter of the respective industrial gas plant is input into the respective physics-based model.

### Claim 7 (depends on 1)

The method of claim 1, wherein the predicted operational characteristics for each industrial gas plant are utilized to determine predicted future resources, future failure and/or predicted future maintenance.

### Claim 8 (depends on 1)

The method of claim 1, wherein one or more of the industrial gas plants comprises a hydrogen process plant having a plurality of electrolyzer modules.

### Claim 9 (depends on 8)

The method of claim 8, wherein each of the electrolyzer modules is assigned a machine learning model.

### Claim 10 (depends on 1)

The method of claim 1, wherein the predicted operational characteristics for each respective industrial gas plant are utilized in a further model to generate an operational performance metric of the industrial gas plant complex.

### Claim 11 (depends on 10)

The method of claim 10, wherein the operational performance metric comprises an efficiency value for the industrial gas plant complex.

### Claim 12 (depends on 11)

The method of claim 11, wherein the industrial gas plant complex comprises an Ammonia plant complex and the determined efficiency value enables a predicted determination of the Ammonia produced for a given level of energy input.

### Claim 13

A system for monitoring operational characteristics of an industrial gas plant complex comprising a plurality of industrial gas plants, the system comprising at least one hardware processor operable to perform:
assigning a machine learning model to each of the industrial gas plants forming the industrial gas plant complex;
training the respective machine learning model for each industrial gas plant based on received historical time-dependent operational characteristic data for the respective industrial gas plant;
executing the trained machine learning model for each industrial gas plant to predict operational characteristics for each respective industrial gas plant for a pre-determined future time period; and
comparing predicted operational characteristic data for each respective industrial gas plant for a pre-determined future time period with measured operational characteristic data for the corresponding time period to identify deviations in industrial gas plant performance.

### Claim 14 (depends on 13)

The system of claim 13, wherein the step of comparing is carried out at the end of the pre-determined future time period of the predicted operational characteristic data or at a timestamp therein.

### Claim 15 (depends on 13)

The system of claim 13, wherein the step of comparing comprises comparing predicted operational characteristic data predicted for a pre-determined time window with actual measured operational characteristic data for the same time window.

### Claim 16 (depends on 13)

The system of claim 13, wherein the received historical time-dependent operational characteristic data for the respective industrial gas plant comprises data obtained from a direct measurement of a process or parameter of the respective industrial gas plant.

### Claim 17 (depends on 13)

The system of claim 13, wherein the received historical time-dependent operational characteristic data for the respective industrial gas plant comprises data obtained from a physics-based model representative of operational characteristics of the respective industrial gas plant.

### Claim 18 (depends on 13)

The system of claim 13, wherein the predicted operational characteristics for each industrial gas plant are utilized to determine predicted future resources, future failure and/or predicted future maintenance.

### Claim 19 (depends on 13)

The system of claim 13, wherein the predicted operational characteristics for each respective industrial gas plant are utilized in a further model to generate an operational performance metric of the industrial gas plant complex.

### Claim 20

A computer readable storage medium storing a program of instructions executable by a machine to perform a method of monitoring operational characteristics of an industrial gas plant complex comprising a plurality of industrial gas plants, the method being executed by at least one hardware processor, the method comprising:
assigning a machine learning model to each of the industrial gas plants forming the industrial gas plant complex;
training the respective machine learning model for each industrial gas plant based on received historical time-dependent operational characteristic data for the respective industrial gas plant;
executing the trained machine learning model for each industrial gas plant to predict operational characteristics for each respective industrial gas plant for a pre-determined future time period; and
comparing predicted operational characteristic data for each respective industrial gas plant for a pre-determined future time period with measured operational characteristic data for the corresponding time period to identify deviations in industrial gas plant performance.
