# US 2022/0282964 A1 · Thickness Measurement Using A Pulsed Eddy Current System

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0282964 A1
- Document ID: US20220282964A1
- Status: Published application
- Kind: A1
- Application number: 17/652,296
- Filed: 2022-02-24
- Published: 2022-09-08
- Earliest claimed: 2021-03-02
- Assignees: ABB Schweiz AG
- Applicants: ABB Schweiz AG
- Inventors: Sten Linder; Jarl Sobel; Anders Eidenvall; Martin Haldin; Aleksander Dzieciol
- Web page: https://patentgrep.com/patent/US20220282964A1

## CPC

- G01B 7/10: {using magnetic means, e.g. by measuring change of reluctance}
- G01B 7/105: {for measuring thickness of coating}
- G01B 2210/46: with one or more detectors on a single side of the object to be measured and with a transmitter on the other side
- G01B: MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS

## Abstract

A method of non-contact measurement of a thickness (d) of an object of an electrically conductive material by means of a Pulsed Eddy Current, PEC, system including a transmitter coil and a receiver coil. The method includes, after having turned off a current in the transmitter coil, at the receiver coil, measuring a voltage induced by the decaying magnetic field at a first time point, a second time point, and a third time point. The method also includes calculating a total magnetic flux which is generated by the eddy currents in the object at the first time point and picked up by the receiver coil, by comparing the measured flux at the first time point with a predetermined total flux picked up by the receiver coil when no object is present. The method also includes normalizing measured magnetic flux resulting from the eddy currents and picked up by the receiver coil, using the calculated total magnetic flux as a normalization factor such that the normalized eddy current flux is independent of a distance between the object and the transmitter and receiver coils. The method also including, based on the measurements at the first, second and third time points, determining the thickness and the resistivity of the object.

## Claims

### Claim 1

A method of non-contact measurement of a thickness (d) of an object of an electrically conductive material by means of a Pulsed Eddy Current, PEC, system comprising a transmitter coil and a receiver coil, the method comprising:
during a predetermined supply time period, supplying a constant current to the transmitter coil, said supplied current generating an electromagnetic field (B) which penetrates the object;
after the supply time period, after a start time point t0, turning off the supplied current, resulting in induced eddy currents in the object and a decaying magnetic field (B);
at the receiver coil, during a predetermined measurement time period starting at said start time point t0, measuring a voltage induced by the decaying magnetic field at a first time point t1, a second time point t2 and at least one later time point t3;
calculating a total magnetic flux Φ1 which is generated by the eddy currents at the first time point t1 and picked up by the receiver coil, by comparing the measured flux Φplate at the first time point t1 with a predetermined total flux Φ0 picked up by the receiver coil when no object is present, wherein the first time point t1 is set to the earliest time satisfying the provision that the magnetic flux Φ(t1) at the first time point t1 is zero when no object is present, wherein Φ1 is calculated as Φ0−Φplate;
normalizing measured magnetic flux Φec resulting from the eddy currents and picked up by the receiver coil, using the calculated total magnetic flux Φ1 as a normalization factor such that the normalized eddy current flux {circumflex over (Φ)}ec is independent of a distance (D) between the object and the transmitter and receiver coils whereby the normalized eddy current flux {circumflex over (Φ)}ec is zero at the first time point t1 and 1 at a time after the eddy currents have died out;
relating the normalized eddy current flux {circumflex over (Φ)}ec to normalized time τ using a time constant T as a normalization factor, such that τ=0 when the real time t=t1 and τ=1 at a time after the turning off of the supplied current when the eddy currents have diffused to just reach a surface of the object facing away from the transmitter coil, whereby the normalized eddy current flux {circumflex over (Φ)}ec is independent of the thickness (d) within the normalized time interval from τ=0 to τ=1 and independent of the resistivity (ρ) of the object at times above τ=1, wherein the time constant T is calculated as:
T
ρ
,
d
≡
μ
Θ
⁢
d
2
π
2
⁢
ρ
wherein d is the thickness of the object, as previously estimated, ρ is the resistivity of the object, as previously estimated, and μ0 is the magnetic permeability of vacuum; and
based on the measurements at the first, second and later time points, determining the thickness (d) and the resistivity (ρ) of the object, wherein the second time point t2 is set to within the normalized time interval from τ=0 to τ=2, where the normalized eddy current flux {circumflex over (Φ)}ec (τ2) is only dependent on the resistivity of the plate, and the at least one later time point t3 is set such that τ>2, where the normalized eddy current flux {circumflex over (Φ)}ec (τ3) is only dependent on the thickness of the plate.

### Claim 2 (depends on 1)

The method of claim 1, wherein the second time point t2 is set to within the range of τ=0.8 to τ=1.

### Claim 3 (depends on 1)

The method of claim 1, wherein the at least one later time point t3 is set to within the normalized time interval from τ=3 to τ=10, e.g. from τ=4 to τ=7.

### Claim 4 (depends on 1)

The method of claim 1, wherein the object is a plate.

### Claim 5 (depends on 1)

The method of claim 1, wherein the at least one later time point t3 comprises a first later time point and a second later time point.

### Claim 6

A computer program product comprising a non-transitory computer readable storage medium storing computer-executable components for causing a controller of a Pulsed Eddy Current, PEC, system to perform a method when the computer-executable components are run on processing circuitry of the controller, the method including:
during a predetermined supply time period, supplying a constant current to the transmitter coil, said supplied current generating an electromagnetic field which penetrates the object;
after the supply time period, after a start time point t0, turning off the supplied current, resulting in induced eddy currents in the object and a decaying magnetic field;
at the receiver coil, during a predetermined measurement time period starting at said start time point t0, measuring a voltage induced by the decaying magnetic field at a first time point t1, a second time point t2 and at least one later time point t3;
calculating a total magnetic flux Φ1 which is generated by the eddy currents at the first time point t1 and picked up by the receiver coil, by comparing the measured flux Φplate at the first time point t1 with a predetermined total flux Φ0 picked up by the receiver coil when no object is present, wherein the first time point t1 is set to the earliest time satisfying the provision that the magnetic flux Φ(t1) at the first time point t1 is zero when no object is present, wherein Φ1 is calculated as Φ0−Φplate;
normalizing measured magnetic flux Φec resulting from the eddy currents and picked up by the receiver coil, using the calculated total magnetic flux Φ1 as a normalization factor such that the normalized eddy current flux {circumflex over (Φ)}ec is independent of a distance between the object and the transmitter and receiver coils whereby the normalized eddy current flux {circumflex over (Φ)}ec is zero at the first time point t1 and 1 at a time after the eddy currents have died out;
relating the normalized eddy current flux {circumflex over (Φ)}ec to normalized time τ using a time constant T as a normalization factor, such that τ=0 when the real time t=t1 and τ=1 at a time after the turning off of the supplied current when the eddy currents have diffused to just reach a surface of the object facing away from the transmitter coil, whereby the normalized eddy current flux {circumflex over (Φ)}ec is independent of the thickness (d) within the normalized time interval from τ=0 to τ=1 and independent of the resistivity (ρ) of the object at times above τ=1, wherein the time constant T is calculated as:
T
ρ
,
d
≡
μ
Θ
⁢
d
2
π
2
⁢
ρ
wherein d is the thickness of the object, as previously estimated, ρ is the resistivity of the object, as previously estimated, and μ0 is the magnetic permeability of vacuum; and
based on the measurements at the first, second and later time points, determining the thickness (d) and the resistivity (ρ) of the object, wherein the second time point t2 is set to within the normalized time interval from τ=0 to τ=2, where the normalized eddy current flux {circumflex over (Φ)}ec (τ2) is only dependent on the resistivity of the plate, and the at least one later time point t3 is set such that τ>2, where the normalized eddy current flux {circumflex over (Φ)}ec (τ3) is only dependent on the thickness of the plate.

### Claim 7

A PEC system for non-contact measurement of a thickness (d) of an object of an electrically conductive material, the PEC system including a transmitter coil and a receiver coil, and a controller comprising:
processing circuitry; and
storage storing instructions executable by said processing circuitry whereby said controller is operative to:
during a predetermined supply time period, supply a constant current to the transmitter coil, said supplied current generating an electromagnetic field (B) which penetrates the object;
after the supply time period, after a start time point t0, turn off the supplied current, resulting in induced eddy currents in the object and a decaying magnetic field (B);
at the receiver coil, during a predetermined measurement time period starting at said start time point t0, measure a voltage induced by the decaying magnetic field at a first time point t1, a second time point t2 and at least one third time point t3;
calculate a total magnetic flux Φ1 which is generated by the eddy currents at the first time point t1 and picked up by the receiver coil, by comparing the measured flux Φplate at the first time point t1 with a predetermined total flux Φ0 picked up by the receiver coil when no object is present, wherein the first time point t1 is set to the earliest time satisfying the provision that the magnetic flux Φ(t1) at the first time point t1 is zero when no object is present, wherein Φ1 is calculated as Φ0−Φplate;
normalize measured magnetic flux Φec resulting from the eddy currents and picked up by the receiver coil, using the calculated total magnetic flux Φ1 as a normalization factor such that the normalized eddy current flux {circumflex over (Φ)}ec is independent of a distance (D) between the object and the transmitter and receiver coils whereby the normalized eddy current flux {circumflex over (Φ)}ec is zero at the first time point t1 and 1 at a time after the eddy currents have died out;
relate the normalized eddy current flux {circumflex over (Φ)}ec to normalized time τ using a time constant T as a normalization factor, such that τ=0 when the real time t=t1 and τ=1 at a time after the turning off of the supplied current when the eddy currents have diffused to just reach a surface of the object facing away from the transmitter coil, whereby the normalized eddy current flux {circumflex over (Φ)}ec is independent of the thickness (d) within the normalized time interval from τ=0 to τ=1 and independent of the resistivity (ρ) of the object at times above τ=1, wherein the time constant T is calculated as:
T
ρ
,
d
≡
μ
Θ
⁢
d
2
π
2
⁢
ρ
wherein d is the thickness of the object, as previously estimated, ρ is the resistivity of the object, as previously estimated, and μ0 is the magnetic permeability of vacuum; and
based on the measurements at the first, second and third time points, determine the thickness (d) and the resistivity (ρ) of the object, wherein the second time point t2 is set to within the normalized time interval from τ=0 to τ=2, where the normalized eddy current flux {circumflex over (Φ)}ec (τ2) is only dependent on the resistivity of the plate, and the third time point t3 is set such that τ>2, where the normalized eddy current flux {circumflex over (Φ)}ec (τ3) is only dependent on the thickness of the plate.