# US 2022/0282892 A1 · Multi-parallel carbon dioxide heat pump control method based on target load control

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0282892 A1
- Document ID: US20220282892A1
- Status: Published application
- Kind: A1
- Application number: 17/664,203
- Filed: 2022-05-19
- Published: 2022-09-08
- Earliest claimed: 2019-11-28
- Assignees: Jiangsu Sujing Group Co., Ltd.
- Applicants: Jiangsu Sujing Group Co., Ltd.
- Inventors: Dan Xiong; Xiaoliang Tang; Hao Pan; Qiang Kang; Xiaofei Song; Jun You
- Web page: https://patentgrep.com/patent/US20220282892A1

## CPC

- F25B 9/008: {the refrigerant being carbon dioxide}
- F24H 15/219: after heating
- F24H 15/375: Control of heat pumps
- F24H 15/38: Control of compressors of heat pumps
- F25B 25/005: {using primary and secondary systems}
- F25B 30/02: of the compression type
- F25B 43/02: for separating lubricants from the refrigerant
- F25B 49/02: for compression type machines, plants or systems
- F25B 49/022: {Compressor control arrangements}
- F25B 2309/06: Compression machines, plants or systems characterised by the refrigerant being carbon dioxide
- F25B 2309/061: with cycle highest pressure above the supercritical pressure
- F25B 2339/047: Water-cooled condensers
- F25B 2400/075: with parallel compressors
- F25B 2500/19: Calculation of parameters
- F25B 2600/02: Compressor control
- F25B 2600/2513: Expansion valves
- F25B 2700/1931: Discharge pressures
- F25B 2700/21152: at the discharge side of the compressor
- Y02B 30/70: Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating
- F25B: REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F24H: FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL (steam generation F22)
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS

## Abstract

A multi-parallel carbon dioxide heat pump control method based on target load control, wherein the multi-parallel carbon dioxide heat pump comprises a carbon dioxide circulation loop, a heat source pipeline and a hot water pipeline, and the control method comprises: adjusting the opening degree of an electronic expansion valve (3) according to the temperature of an inlet of the hot water pipeline, the temperature of an outlet of the hot water pipeline, the flow in the hot water pipeline and a target outlet temperature set by a user, such that the steady-state change of system pressure can be realized by adjusting the electronic expansion valve (3) on the basis of the fluctuation of parameters such as user side temperature and flow, thus a target outlet temperature change curve is rapidly and stably converged to a target value, and the outlet temperature can be rapidly stabilized.

## Claims

### Claim 1

A multi-parallel carbon dioxide heat pump control method based on target load control, wherein the multi-parallel carbon dioxide heat pump comprises a carbon dioxide circulation loop, a heat source pipeline and a hot water pipeline, wherein the carbon dioxide circulation loop comprises an evaporator evaporating pipe, a gas-liquid separator, a compressor unit, an oil-gas separator, a cooler condensing pipe and an electronic expansion valve which are arranged in series in the loop sequentially; the evaporator evaporating pipe and the heat source pipeline are arranged together to exchange heat with each other; the hot water pipeline and the cooler condensing pipe are arranged together to exchange heat with each other; the compressor unit comprises a plurality of variable-frequency carbon dioxide compressors arranged in parallel; the hot water pipeline is provided with a water pump and a flow meter, and an inlet end and an outlet end of the hot water pipeline are respectively provided with a temperature sensor, wherein the control method comprises adjusting opening degree of the electronic expansion valve according to inlet temperature of the hot water pipeline, outlet temperature of the hot water pipeline, flow in the hot water pipeline and a target outlet temperature set by a user.

### Claim 2 (depends on 1)

The multi-parallel carbon dioxide heat pump control method based on target load control according to claim 1, wherein the control method comprises following steps:
1) obtaining the inlet temperature Thi of the hot water pipeline, the outlet temperature Tho of the hot water pipeline and the flow V of the hot water pipeline, and according to the target outlet temperature Tobj set by a user, calculating a target heating capacity Q=1.163*(Tobj−Thi)*V, and calculating a current heating capacity Qc=1.163*(Tobj−Tho)*V;
2) when each carbon dioxide compressor is set to run at 50 Hz, the load of the carbon dioxide heat pump system is 100%, the number of the carbon dioxide compressors provided in the multi-parallel carbon dioxide heat pump is N, and according to the rated working conditions, the rated heating capacity of each carbon dioxide compressor is Qs, thus a target load L=Q/(N*Qs)*100%, and an actual load Lr=Qc/(N*Qs)*100%;
3) according to the target load L, the actual load Lr, the number n of variable-frequency carbon dioxide compressors, an upper limit Fmax and a lower limit Fmin of variable frequency of the variable-frequency carbon dioxide compressors, calculating a target opening degree of the electronic expansion valve
⁢
K
e
=
f
⁡
(
L
,
L
r
,
F
max
,
F
min
,
n
)
;
f
⁡
(
L
,
L
r
,
F
max
,
F
min
,
n
)
=
A
*

L
r
-
L

L
+
B
*
(
F
min
-
50
)
F
max
-
F
min
+
C
*
n
*
(
F
max
-
F
min
)
50
⁢
N
,
wherein, A, B and C are respectively specific coefficients, and A, B and C obtained by different equipments are different, and N is total number of the carbon dioxide compressors included in the multi-parallel carbon dioxide heat pump;
4) adjusting the opening degree of the electronic expansion valve according to the target opening degree Ke of the electronic expansion valve.

### Claim 3 (depends on 2)

The multi-parallel carbon dioxide heat pump control method based on target load control according to claim 2, comprising: if the target load L≥the actual load Lr and the target opening degree Ke of the electronic expansion valve≥a current opening degree Kc, adjusting the opening degree of the electronic expansion valve to the target opening degree Ke;
if the target load L<the actual load Lr and the target opening degree Ke of the electronic expansion valve≥a current opening degree Kc, keeping the current opening degree Kc of the electronic expansion valve unchanged;
if the target load L≥the actual load Lr and the target opening degree Ke of the electronic expansion valve<a current opening degree Kc, keeping the current opening degree Kc of the electronic expansion valve unchanged;
if the target load L<the actual load Lr and the target opening degree Ke of the electronic expansion valve<the current opening degree Kc, adjusting the opening degree of the electronic expansion valve to the target opening degree Ke.

### Claim 4 (depends on 3)

The multi-parallel carbon dioxide heat pump control method based on target load control according to claim 3, comprising: after adjusting the opening degree of the electronic expansion valve, according to the target load L and the actual load Lr, calculating the absolute value of the load difference Lab=|L−Lr|, and calculating the number of the carbon dioxide compressors that need to be turned on or off Nc=INT(Lab/100%/N); if the target load L≥the actual load Lr, gradually turning on Nc carbon dioxide compressors, and if the target load L<the actual load Lr, gradually turning off Nc carbon dioxide compressors.

### Claim 5 (depends on 4)

The multi-parallel carbon dioxide heat pump control method based on target load control according to claim 4, wherein, when the Nc carbon dioxide compressors need to be gradually turned on, the time interval for turning on each carbon dioxide compressor is 20 s; each time one carbon dioxide compressor is turned on, and it starts from the one with the shortest cumulative running time among the non-operating carbon dioxide compressors;
when the Nc carbon dioxide compressors need to be gradually turned off, the time interval for turning off each carbon dioxide compressor is 5 s; each time one carbon dioxide compressor is turned off, and it starts from the one with the longest cumulative running time among the operating carbon dioxide compressors.

### Claim 6 (depends on 4)

The multi-parallel carbon dioxide heat pump control method based on target load control according to claim 4, comprising: after turning on or off the Nc carbon dioxide compressors, recalculating the actual load Lr, and the absolute value of the load difference Lab=|L−Lr| between the actual load and the target load:
if Lab≥100%/N, recalculating the number Nc of the carbon dioxide compressors that need to be turned on or off, and turning on or off the carbon dioxide compressors;
if Lab<100%/N and L<Lr, adjusting the one with the longest running time among the variable-frequency carbon dioxide compressors in operation to reduce its working frequency, where its working frequency can be as low as Fmin until L=Lr;
if Lab<100%/N and L≥Lr, adjusting the one with the shortest running time among the variable-frequency carbon dioxide compressors in operation to increase its working frequency, where its working frequency can be as high as Fmax until L=Lr.

### Claim 7 (depends on 1)

The multi-parallel carbon dioxide heat pump control method based on target load control according to claim 1, wherein an inlet and an outlet of each of the carbon dioxide compressors are respectively provided with a temperature sensor.

### Claim 8 (depends on 1)

The multi-parallel carbon dioxide heat pump control method based on target load control according to claim 1, wherein a pressure sensor is provided between the gas-liquid separator and the compressor unit.

### Claim 9 (depends on 1)

The multi-parallel carbon dioxide heat pump control method based on target load control according to claim 1, wherein the oil-gas separator is provided with a gas-liquid inlet connected to the outlets of the carbon dioxide compressors, a gas outlet connected to the inlets of the carbon dioxide compressors, and a liquid outlet connected to the cooler condensing pipe.

### Claim 10 (depends on 9)

The multi-parallel carbon dioxide heat pump control method based on target load control according to claim 9, wherein a temperature sensor and a pressure sensor are provided between the compressor unit and the gas-liquid inlet of the oil-gas separator.

### Claim 11 (depends on 1)

The multi-parallel carbon dioxide heat pump control method based on target load control according to claim 1, wherein the oil-gas separator is provided with a gas-liquid inlet connected to the outlets of the carbon dioxide compressors, a gas outlet connected to the inlets of the carbon dioxide compressors, and a liquid outlet connected to the cooler condensing pipe;
the inlet and the outlet of each of the carbon dioxide compressors are respectively provided with a temperature sensor;
a pressure sensor is provided between the gas-liquid separator and the compressor unit;
the control method comprises following steps:
1) obtaining the inlet temperature Thi of the hot water pipeline, the outlet temperature Tho of the hot water pipeline and the flow V of the hot water pipeline, and according to the target outlet temperature Tobj set by a user, calculating a target heating capacity Q=1.163*(Tobj−Thi)*V, and calculating a current heating capacity Qc=1.163*(Tobj−Tho)*V;
2) when each carbon dioxide compressor is set to run at 50 Hz, the load of the carbon dioxide heat pump system is 100%, the number of the carbon dioxide compressors provided in the multi-parallel carbon dioxide heat pump is N, and according to the rated working conditions, the rated heating capacity of each carbon dioxide compressor is Qs, thus a target load L=Q/(N*Qs)*100%, and an actual load Lr=Qc/(N*Qs)*100%;
3) according to the target load L, the actual load Lr, the number n of variable-frequency carbon dioxide compressors, an upper limit Fmax and a lower limit Fmin of variable frequency of the variable-frequency carbon dioxide compressors, calculating a target opening degree of the electronic expansion valve
⁢
K
e
=
f
⁡
(
L
,
L
r
,
F
max
,
F
min
,
n
)
;
f
⁡
(
L
,
L
r
,
F
max
,
F
min
,
n
)
=
A
*

L
r
-
L

L
+
B
*
(
F
min
-
50
)
F
max
-
F
min
+
C
*
n
*
(
F
max
-
F
min
)
50
⁢
N
,
wherein, A, B and C are respectively specific coefficients, and A, B and C obtained by different equipments are different, and N is total number of the carbon dioxide compressors provided in the multi-parallel carbon dioxide heat pump;
4) adjusting the opening degree of the electronic expansion valve according to the target opening degree Ke of the electronic expansion valve;
if the target load L≥the actual load Lr and the target opening degree Ke of the electronic expansion valve≥a current opening degree Kc, adjusting the opening degree of the electronic expansion valve to the target opening degree Ke;
if the target load L<the actual load Lr and the target opening degree Ke of the electronic expansion valve≥a current opening degree Kc, keeping the current opening degree Kc of the electronic expansion valve unchanged;
if the target load L≥the actual load Lr and the target opening degree Ke of the electronic expansion valve <a current opening degree Kc, keeping the current opening degree & of the electronic expansion valve unchanged;
if the target load L<the actual load Lr and the target opening degree Ke of the electronic expansion valve <a current opening degree Kc, adjusting the opening degree of the electronic expansion valve to the target opening degree Ke;
5) after adjusting the opening degree of the electronic expansion valve, according to the target load L and the actual load Lr, calculating the absolute value of the load difference Lab=|L−Lr|, and calculating the number of the carbon dioxide compressors that need to be turned on or off Nc=INT(Lab/100%/N); if the target load L≥the actual load Lr, gradually turning on Nc, carbon dioxide compressors, and if the target load L<the actual load Lr, gradually turning off Nc, carbon dioxide compressors;
in step 5), when the Nc, carbon dioxide compressors need to be gradually turned on, the time interval for turning on each carbon dioxide compressor is 20 s; each time one carbon dioxide compressor is turned on, and it starts from the one with the shortest cumulative running time among the non-operating carbon dioxide compressors;
when the Nc, carbon dioxide compressors need to be gradually turned off, the time interval for turning off each carbon dioxide compressor is 5 s; each time one carbon dioxide compressor is turned off, and it starts from the one with the longest cumulative running time among the operating carbon dioxide compressors;
after turning on or off the Nc carbon dioxide compressors, recalculating the actual load Lr, and the absolute value of the difference Lab=|L−Lr| between the actual load and the target load:
if Lab≥100%/N, recalculating the number Nc of the carbon dioxide compressors that need to be turned on or off, and turning on or off the carbon dioxide compressors;
if Lab<100%/N and L<Lr, adjusting the one with the longest running time among the variable-frequency carbon dioxide compressors in operation to reduce its working frequency, where its operating frequency can be as low as Fmin until L=Lr;
if Lab<100%/N and L≥Lr, adjusting the one with the shortest running time among the variable-frequency carbon dioxide compressors in operation to increase its working frequency, where its operating frequency can be as high as Fmax until L=Lr.