# US 2022/0282695 A1 · Method for producing electricity in an oil platform and installation for implementing same

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0282695 A1
- Document ID: US20220282695A1
- Status: Published application
- Kind: A1
- Application number: 17/684,455
- Filed: 2022-03-02
- Published: 2022-09-08
- Earliest claimed: 2021-03-03
- Assignees: Oil2Green
- Applicants: Oil2Green
- Inventors: Gianluca PEVIANI
- Web page: https://patentgrep.com/patent/US20220282695A1

## CPC

- E21B 43/38: in the well
- F03B 13/06: Stations or aggregates of water-storage type, {e.g. comprising a turbine and a pump}(turbines characterised by having means for functioning alternatively as pumps F03B3/10)
- E21B 41/0085: {Adaptations of electric power generating means for use in boreholes}
- E21B 43/2401: {by means of electricity}
- F03G 4/026: {open loop geothermal collectors}
- F03B 13/02: Adaptations for drilling wells
- F05B 2220/706: an electrical generator
- F05B 2240/911: already existing for a prior purpose
- F05B 2240/95: offshore
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- F03B: MACHINES OR ENGINES FOR LIQUIDS (positive-displacement engines for liquid F03C; machines for liquids and gases F01; positive-displacement machines for liquids F04, rotary fluid gearing of the hydrokinetic type F16H41/00)
- F03G: SPRING, WEIGHT, INERTIA OR LIKE MOTORS; MECHANICAL-POWER PRODUCING DEVICES OR MECHANISMS, NOT OTHERWISE PROVIDED FOR OR USING ENERGY SOURCES NOT OTHERWISE PROVIDED FOR (arrangements in connection with power supply in vehicles from force of nature B60K16/00; electric propulsion with power supply in vehicles from force of nature B60L8/00)
- F05B: INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G

## Abstract

A method for producing electricity from an existing oil platform designed to extract petroleum oil from an underground deposit comprises the following steps: extracting a mixture of petroleum oil and water from the underground deposit under a pressure P2 via a first extraction pipe (11); circulating the extracted mixture so as to actuate an electricity generating turbine by kinetic energy in order to generate electricity; and supplying a power grid with at least a fraction of the electricity generated by the generating turbine.

## Claims

### Claim 1

Method for producing electricity with an existing oil extraction installation (10) designed to extract petroleum oil and water from an underground deposit (3), characterized in that it comprises the following steps:
a) a mixture of petroleum oil and water from the underground deposit (3) is extracted under a pressure P2 via a first extraction pipe (11);
d) the extracted mixture is made to circulate so as to actuate an electricity generating turbine (14) by kinetic energy in order to generate electricity;
e) a power grid (17) is supplied with at least a fraction of the electricity generated by the generating turbine (14).

### Claim 2 (depends on 1)

Method for producing electricity according to claim 1, comprising, between step a) and step d), a step b) of separating the petroleum oil and the water when the oil/water ratio in the mixture from the deposit (3) is greater than a given threshold value, and a step c) of temporarily storing the water obtained at a given minimum height (H) with respect to the generating turbine (14).

### Claim 3 (depends on 1)

Method for producing electricity according to claim 1, also comprising a step f) of injecting an extraction fluid into the underground deposit (3) under a pressure P1 with an injection pump (13), via a second injection pipe (12).

### Claim 4 (depends on 3)

Method for producing electricity according to claim 3, wherein the pressure P1 is adjusted so as to keep the pressure P2 at a given value for actuating the electricity generating turbine (14) by kinetic energy in order to generate electricity.

### Claim 5 (depends on 3)

Method for producing electricity according to claim 3, wherein the extraction fluid comprises at least a part of the mixture extracted in step a).

### Claim 6 (depends on 3)

Method for producing electricity according to claim 3, wherein the injection pump (13) is supplied with electricity using at least a fraction of the electricity generated by the generating turbine (14), in order to repeat steps a) to e).

### Claim 7 (depends on 3)

Method for producing electricity according to claim 3, wherein the extraction fluid comprises CO2 gas, a part of the extracted mixture, and/or sea water.

### Claim 8 (depends on 2)

Method for producing electricity according to claim 2, wherein steps b) and c) are omitted when the proportion of oil in the extracted mixture drops below the given threshold value.

### Claim 9

Equipment for producing electricity for an existing oil extraction installation (10), designed to extract a mixture of petroleum oil and water from an underground deposit (3), the oil extraction installation comprising a first pipe (11) for extracting the mixture of oil and water from the underground deposit (3) under a pressure P2, the equipment being characterized in that it comprises:
an electricity generating turbine (14) fluidically connected to the first pipe (11) and actuable by kinetic energy when the mixture extracted from the underground deposit (3) passes through it in order to generate electricity;
an electric circuit (15) between the turbine (14) and a member (16) for storing and/or transmitting the electricity generated by the turbine.

### Claim 10 (depends on 9)

Equipment for producing electricity according to claim 9, also comprising, upstream of the generating turbine (14), a water/petroleum oil separator (18) from which a petroleum oil line (19) extends toward a petroleum oil tank (20), and a water line (21) extends toward a water tank (22), the water tank (22) being fluidically connected by a pipe (23) to the generating turbine (14), and arranged at a given height (H) with respect to the generating turbine (14) in order that the water falls under gravity into the generating turbine and actuates it by kinetic energy.

### Claim 11 (depends on 10)

Equipment for producing electricity according to claim 10, also comprising a bypass line (30) connected by a valve (31) to the first pipe (11) upstream of the water/oil separator (18) on one side and to the pipe (23) supplying the generating turbine (14) from the water tank (22) on the other side.

### Claim 12 (depends on 10)

Equipment for producing electricity according to claim 10, also comprising a bypass line (30) connected by a valve (31) to the first pipe (11) upstream of the water/oil separator (18) on one side and to the water tank (22) on the other side.

### Claim 13 (depends on 10)

Equipment for producing electricity according to claim 10, also comprising a bypass line (30) connected by a valve (31) to the first pipe (11) upstream of the water/oil separator (18) on one side and to the generating turbine (14) on the other side.

### Claim 14 (depends on 11)

Equipment for producing electricity according to claim 11, also comprising at least one sensor (33) for sensing the composition of the extracted mixture and a central processing unit (32) programmed to determine the oil/water ratio in the extracted mixture, to compare it with a given threshold value stored in a memory, and to control the valves (31) to make the extracted mixture circulate via the bypass line (30) directly from the first extraction pipe (11) to the generating turbine (14) when the oil/water ratio in the extracted mixture is below the given threshold value.

### Claim 15 (depends on 9)

Equipment for producing electricity according to claim 9, also comprising a pump (13) for injecting extraction fluid into the underground deposit (3) under a pressure P1 via a second injection pipe (12), the first pipe (11) being fluidically connected to the injection pump (13) so as to form a fluid circulation loop entering and leaving the underground deposit (3).
