# US 2022/0282619 A1 · Method and device for carrying out grouting between adjacent gateroads in internal-staggered split-level coal mining

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0282619 A1
- Document ID: US20220282619A1
- Status: Published application
- Kind: A1
- Application number: 17/752,842
- Filed: 2022-05-24
- Published: 2022-09-08
- Earliest claimed: 2021-05-25
- Assignees: Taiyuan University of Technology
- Applicants: Taiyuan University of Technology
- Inventors: Guorui FENG; Yijiang FAN; Pengfei WANG; Chenliang HAO; Xiaoze WEN; Jun GUO; Jinwen BAI; Tingye QI; Jianan LIU; Linjun ZHU; Changquan WU
- Web page: https://patentgrep.com/patent/US20220282619A1

## CPC

- E21C 41/18: for brown or hard coal
- E21D 20/028: {Devices or accesories for injecting a grouting liquid in a bore-hole (E21D20/003 takes precedence; improving soil or rock by injections E21D9/001)}
- E21C: MINING OR QUARRYING
- E21D: SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS (soil-conditioning or soil-stabilising materials C09K17/00; drilling or cutting machines for mining or quarrying E21C; safety devices, transport, rescue, ventilation or drainage E21F)

## Abstract

A method for carrying out grouting between adjacent gateroads in internal-staggered split-level coal mining. A return air gateroad of a stoping face and an inlet air gateroad of a heading face are not on the same level. The return air gateroad of the stoping face is arranged along a roof of a coal seam. The inlet air gateroad of the heading face is arranged along a floor of the coal seam. There is a height difference between the return air gateroad and the inlet air gateroad in a vertical direction. During the construction process, the inlet air gateroad is excavated at a delay distance of 180-200 meters from the return air gateroad. The drilling and grouting are performed while excavating the roadway, where grouting holes are arranged in a single row. A device for implementing the method is also provided.

## Claims

### Claim 1

A method for carrying out grouting between adjacent gateroads in internal-staggered split-level coal mining, the method comprising:
excavating a roadway;
drilling grouting holes; and
performing grouting through the grouting holes while excavating the roadway;
wherein a stoping coal seam is a thick coal seam; a return air gateroad of a stoping face and an inlet air gateroad of a heading face are not on the same level; the return air gateroad of the stoping face is arranged along a roof of the stoping coal seam; the inlet air gateroad of the heading face is arranged along a floor of the stoping coal seam; there is a height difference between the return air gateroad of the stoping face and the inlet air gateroad of the heading face in a vertical direction; and during construction, the inlet air gateroad of the heading face is excavated at a delay distance of 180-200 m from the return air gateroad of the stoping face such that an inlet air gateroad of a next heading face is excavated after the return air gateway of the stoping face is stable.

### Claim 2 (depends on 1)

The method of claim 1, wherein rock bolts of a roof of the inlet air gateroad and rock bolts of a floor of the return air gateroad are staggeredly arranged such that in a direction along the roadway, any row of rock bolts on the floor of the return air gateroad is arranged between two adjacent rows of rock bolts on the roof of the inlet air gateroad to prevent mutual interference along the roadway.

### Claim 3 (depends on 1)

The method of claim 1, wherein four grouting holes are arranged in each row on a floor of the return air gateroad; the four grouting holes in each row are respectively a first grouting hole, a second grouting hole, a third grouting hole and a fourth grouting hole from a first side of the floor of the return air gateroad to a second side of the floor of the return air gateroad; the first grouting hole is at an angle of 30° to the floor of the return air gateroad, and is inclined downward towards the first side of the floor of the return air gateroad, so as to extend into the stoping coal seam on the first side of the floor of the inlet air gateroad; the second grouting hole is at an angle of 30° to the floor of the return air gateroad, and is inclined downward towards the first side of the floor of the return air gateroad, so as to extend into the stoping coal seam above a roof of the inlet air gateroad; the fourth grouting hole is at an angle of 45° to the stoping coal seam at the floor of the return air gateroad, and is inclined downward towards the second side of the floor of the return air gateroad; and the third grouting hole is perpendicular to the stoping coal seam at the floor of the return air gateroad.

### Claim 4 (depends on 1)

The method of claim 1, wherein after support of the return air gateroad is stabilized, the inlet air gateroad is excavated; four grouting holes are arranged in each row on a roof of the inlet air gateroad; the four grouting holes in each row are respectively a first grouting hole, a second grouting hole, a third grouting hole and a fourth grouting hole from a first side of the roof of the inlet air gateroad to a second side of the roof of the inlet air gateroad, the first grouting hole and the second grouting hole are both at an angle of 45° to the roof of the inlet air gateroad, and are inclined upward towards the first side of the roof of the inlet air gateroad in a parallel manner, so as to extend into the stoping coal seam below a floor of the return air gateroad; the fourth grouting hole is at an angle of 45° to the stoping coal seam, and is inclined upward towards the second side of the roof of the inlet air gateroad, so as to extend into the stoping coal seam below the floor of the return air gateroad; and the third grouting hole is perpendicular to the stoping coal seam at the roof of the inlet air gateroad.

### Claim 5 (depends on 1)

A device for implementing the method of claim 1, comprising:
a grouting pipe;
a drilling rig;
a drilling tool;
a grouting pump;
a stirrer;
a delivery pipeline;
a packer;
a mixer; and
a rock bolt;
wherein the drilling rig and the drilling tool are configured for hole drilling; the stirrer is configured to prepare a grout; the delivery pipeline is configured to transport the grout; the grouting pump is configured to provide a pressure to transport the grout to a target position through the delivery pipeline; and after the rock bolt is placed into a drill hole, the grouting pump is connected to an end of the rock bolt through the delivery pipeline, and the grout is fed to the rock bolt under the pressure provided by the grouting pump to perform grouting.

### Claim 6 (depends on 5)

The device of claim 5, wherein the grouting pipe is composed of an inner grouting pipe and an outer grouting pipe; the inner grouting pipe is annular, and is evenly provided with three first through holes along a circumferential direction of a cross section of the inner grouting pipe; an outer side of each of the three first through holes is provided with a connecting pipe for connection with the outer grouting pipe;
the outer grouting pipe is annular, and is evenly provided with six second through holes along a circumferential direction of a cross section of the outer grouting pipe;
two adjacent second through holes constitute a through-hole group, and a boss is arranged between two adjacent through-hole groups; and
the inner grouting pipe is arranged inside the outer grouting pipe, and is configured to be rotatable in the slot on the inner wall of the outer grouting pipe.

### Claim 7 (depends on 6)

The device of claim 6, wherein an angle between two adjacent second through holes is 60°; a height difference between the boss and the slot is 5 mm; when the grouting is started, the three first through holes are aligned with three of the six second through holes; after the grouting is performed for a preset period of time, the inner grouting pipe is rotated by 60°, such that the three first through holes are aligned with the other three of the six second through holes at an interval of 120°, so as to continue performing the grouting; and after the grouting is completed, the inner grouting pipe is extracted and used for a grouting area in front of a roadway.