# US 2022/0282594 A1 · System and process for installing a hydrocarbon production system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0282594 A1
- Document ID: US20220282594A1
- Status: Published application
- Kind: A1
- Application number: 17/683,678
- Filed: 2022-03-01
- Published: 2022-09-08
- Earliest claimed: 2021-03-03
- Assignees: Cenovus Energy Inc.
- Applicants: Cenovus Energy Inc.
- Inventors: Clifford Vernon HOGSTEAD
- Web page: https://patentgrep.com/patent/US20220282594A1

## CPC

- E21B 36/001: {Cooling arrangements}
- E21B 47/13: by electromagnetic energy, e.g. radio frequency
- E21B 17/028: {Electrical or electro-magnetic connections}
- E21B 33/0385: {electrical connectors}
- E21B 43/128: {Adaptation of pump systems with down-hole electric drives}
- H01R 13/5202: {Sealing means between parts of housing or between housing part and a wall, e.g. sealing rings}
- H02G 9/06: in underground tubes or conduits; Tubes or conduits therefor
- H02G 15/007: Devices for relieving mechanical stress
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- H01R: ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H02G: INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES

## Abstract

A system for use in hydrocarbon production includes a well that has a wellhead and extends downhole into a reservoir. The wellhead has a passageway that extends through a sidewall thereof. The system includes piping extending from the wellhead at the passageway. A downhole electrical device is disposed downhole in the well. A cable is coupled to the downhole electrical device and includes electrical wires extending from the downhole electrical device, out of the wellhead, through the passageway in the sidewall, and along the piping. A cooling section is disposed along the piping through which the electrical wires pass, and an electrical connector is coupled to the electrical wires for electrical connection thereto such that the wires extend along the cooling section between electrical connector and the wellhead.

## Claims

### Claim 1

A system for use in hydrocarbon production from a hydrocarbon reservoir, the system comprising:
a well including a wellhead at a surface, the well extending downhole into a reservoir and the wellhead including a passageway extending through a sidewall thereof;
piping extending from the wellhead at the passageway;
a cable coupled to a downhole electrical device for use in hydrocarbon production, the cable including electrical wires extending from the downhole electrical device, out of the wellhead, through the passageway in the sidewall, and along the piping;
a cooling section along the piping through which the electrical wires pass; and
an electrical connector coupled to the electrical wires for electrical connection thereto such that the wires extend along the cooling section between electrical connector and the wellhead.

### Claim 2 (depends on 1)

The system according to claim 1, comprising a first seal along the piping and through which the electrical wires pass to seal around the electrical wires and seal with an interior surface of the piping.

### Claim 3 (depends on 2)

The system according to claim 2, comprising a second seal spaced from the first seal along the piping such that the first seal is disposed between the passageway and the second seal.

### Claim 4 (depends on 3)

The system according to claim 3, wherein the cooling section is disposed between the first seal and the second seal.

### Claim 5 (depends on 4)

The system according to claim 4, wherein the cooling section includes a cooling media disposed in the piping, between the first seal and the second seal.

### Claim 6 (depends on 5)

The system according to claim 5, wherein the cooling media comprises a mineral oil.

### Claim 7 (depends on 5)

The system according to claim 5, comprising a radiator comprising a plurality of pipes in fluid communication with the cooling section disposed between the first seal and the second seal and configured to receive the cooling media and return cooled cooling media to the cooling section.

### Claim 8 (depends on 7)

The system according to claim 7, wherein the cooling section and radiator are configured to passively cool the cooling media.

### Claim 9 (depends on 7)

The system according to claim 7, comprising a pressure equalizing line associated with the cooling section for equalizing a pressure in the cooling section to a pressure on a wellhead side of the first seal.

### Claim 10 (depends on 7)

The system according to claim 7, comprising a pressure equalizing line coupled to the radiator for equalizing a pressure in the cooling section to a pressure on a wellhead side of the first seal.

### Claim 11 (depends on 9)

The system according to claim 9, wherein a pressure in the cooling section differs from a pressure in the piping on an opposing side of the second seal.

### Claim 12 (depends on 1)

The system according to claim 1, wherein the piping is coupled to the wellhead to form an acute angle between a portion of the piping and the wellhead.

### Claim 13 (depends on 1)

The system according to claim 1, wherein the piping is coupled to the wellhead at a shoulder thereof and the passageway extends through the shoulder.

### Claim 14 (depends on 13)

The system according to claim 13, wherein an internal diameter of the passageway is greater at a first location at which the passageway meets the wellhead borehole than a second location at which the passageway meets the piping.

### Claim 15 (depends on 1)

The system according to claim 1, wherein the downhole electrical device comprises an electric submersible pump.

### Claim 16

A process of installing a hydrocarbon production system in a hydrocarbon recovery well having a wellhead, the process comprising:
feeding, through a top of the wellhead, an electric submersible pump and cable including electrical wires coupled to the electric submersible pump, downhole;
cutting an uphole end of the cable after feeding the electric submersible pump downhole;
routing the uphole end of the electrical wires through a passageway that extends through a sidewall of the wellhead;
feeding the electrical wires through piping extending from the side of the wellhead at the passageway while the pump is located downhole, through a cooling section along the piping such that the electrical wires extend out the side of the wellhead, through the piping and through the cooling section; and
electrically coupling the electrical wires to a connector after feeding the electrical wires through the cooling section, to power the electric submersible pump.

### Claim 17 (depends on 16)

The process according to claim 16, wherein feeding, through the top of the wellhead, the electric submersible pump comprises feeding the pump to a location downhole of a target position of the electric submersible pump, and wherein routing the uphole end of the electrical wires through the passageway comprises returning the electric submersible pump to the target position after routing the uphole end of the electrical wires through the passageway.

### Claim 18 (depends on 16)

The process according to claim 16, comprising sealing the electrical wires along the piping extending from the side of the wellhead utilizing a first seal to seal around the electrical wires and seal with an interior surface of the piping.

### Claim 19 (depends on 18)

The process according to claim 18, comprising sealing the electrical wires along the piping utilizing a second seal spaced from the first seal such that the first seal is disposed between the passageway and the second seal.

### Claim 20 (depends on 19)

The process according to claim 19, comprising filling the piping between the first seal and the second seal with a cooling media to provide a cooling section along the piping.

### Claim 21 (depends on 19)

The process according to claim 19, comprising coupling the piping between the first seal and the second seal to a radiator to passively cool cooling media between the first seal and the second seal.

### Claim 22 (depends on 19)

The process according to claim 19, comprising coupling a pressure equalizing line to the cooling section for equalizing pressure in the cooling section with a pressure on a wellhead side of the first seal.

### Claim 23 (depends on 22)

The process according to claim 22, wherein the pressure equalizing line is coupled to a casing of the well.