# US 2022/0281056 A1 · Control of processing parameters during substrate polishing using expected future parameter changes

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0281056 A1
- Document ID: US20220281056A1
- Status: Published application
- Kind: A1
- Application number: 17/683,056
- Filed: 2022-02-28
- Published: 2022-09-08
- Earliest claimed: 2021-03-05
- Assignees: Applied Materials, Inc.
- Applicants: Applied Materials, Inc.
- Inventors: Benjamin Cherian; Sivakumar Dhandapani
- Web page: https://patentgrep.com/patent/US20220281056A1

## CPC

- B24B 37/005: Control means for lapping machines or devices
- B24B 37/013: Devices or means for detecting lapping completion
- B24B: MACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING (grinding of gear teeth B23F, of screw-threads B23G1/36; by electro-erosion B23H; abrasive or related blasting B24C; tools for grinding, buffing or sharpening B24D; polishing compositions C09G1/00; abrasives C09K3/14; electrolytic etching or polishing C25F3/00; grinding arrangements for use on assembled railway tracks E01B31/17); DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS

## Abstract

Controlling a polishing system includes receiving from an in-situ monitoring system, for each region of a plurality of regions on a substrate being processed by the polishing system, a sequence of characterizing values for the region. For each region, a polishing rate is determined for the region, and an adjustment is calculated for at least one processing parameter. For each of a plurality of parameter update times, an adjustment is calculated for at least one processing parameter, wherein calculation of the adjustment for a particular parameter update time from the plurality of parameter update times includes calculation of expected future parameter changes for one or more future parameter update times subsequent to the particular parameter update time.

## Claims

### Claim 1

A computer program product for controlling a polishing system, the computer program product residing on a non-transitory computer readable medium, the computer program product comprising instructions for causing one or more computers to:
receive from an in-situ monitoring system, for each region of a plurality of regions on a substrate being processed by the polishing system, a sequence of characterizing values for the region;
for each region, determine a polishing rate for the region; and
for each of a plurality of parameter update times, calculate an adjustment for at least one processing parameter, wherein calculation of the adjustment for a particular parameter update time from the plurality of parameter update times includes calculation of expected future parameter changes for one or more future parameter update times subsequent to the particular parameter update time.

### Claim 2 (depends on 1)

The computer program product of claim 1, comprising instructions to cause the plurality of parameter update times to occur at a regular intervals.

### Claim 3 (depends on 1)

The computer program product of claim 1, comprising instructions to cause the plurality of parameter update time to occur every 3-30 seconds.

### Claim 4 (depends on 1)

The computer program product of claim 1, wherein calculation of the adjustment for a given parameter update time prior to a penultimate update time includes calculation of expected future parameter changes for at least two future parameter update times subsequent to the given parameter update time.

### Claim 5 (depends on 1)

The computer program product of claim 1, wherein instructions to calculate the adjustment for the particular parameter update time include instructions to calculate an expected future parameter change for each future parameter update time subsequent to the particular parameter update time.

### Claim 6 (depends on 1)

The computer program product of claim 1, wherein instructions to calculate the adjustment include instructions to minimize a cost function that includes, for each region, a first term that includes a difference between a current characterizing value or an expected characterizing value at an expected endpoint time and a target characterizing value for the region.

### Claim 7 (depends on 6)

The computer program product of claim 6, wherein the cost function includes a second term that includes future parameter changes.

### Claim 8 (depends on 1)

The computer program product of claim 1, comprising instructions to determine a rate change and to back-calculate a pressure change from the rate change using an inverted Preston matrix.

### Claim 9 (depends on 1)

The computer program product of claim 1, wherein the characterizing value is thickness.

### Claim 10 (depends on 1)

The computer program product of claim 1, wherein the parameter is pressure of a chamber in a carrier head of the polishing system.

### Claim 11

A polishing system, comprising:
a platen to support a polishing pad;
a carrier head to hold a substrate in contact with the polishing pad;
a motor to generate relative motion between the carrier head and the polishing pad;
an in-situ monitoring system to, for each region of a plurality of regions on the substrate being polished, generate a sequence of characterizing values for the region; and
a controller configured to
receive from the in-situ monitoring system, for each region of the plurality of regions, a sequence of characterizing values for the region,
for each region, determine a polishing rate for the region, and
for each of a plurality of parameter update times, calculate an adjustment for at least one processing parameter, wherein calculation of the adjustment for a particular parameter update time from the plurality of parameter update times includes calculation of expected future parameter changes for one or more future parameter update times subsequent to the particular parameter update time.

### Claim 12 (depends on 11)

The system of claim 11, wherein the controller is configured to cause the plurality of parameter update times to occur at a regular intervals.

### Claim 13 (depends on 11)

The system of claim 11, wherein the controller is configured to cause the plurality of parameter update time to occur every 3-30 seconds.

### Claim 14 (depends on 11)

The system of claim 11, wherein calculation of the adjustment for a given parameter update time prior to a penultimate update time includes calculation of expected future parameter changes for at least two future parameter update times subsequent to the given parameter update time.

### Claim 15 (depends on 11)

The system of claim 11, wherein calculation of the adjustment for the particular parameter update time includes calculation an expected future parameter change for each future parameter update time subsequent to the particular parameter update time.

### Claim 16 (depends on 11)

The system of claim 11, wherein calculation of the adjustment includes minimization of a cost function that includes, for each region, a first term that includes a difference between a current characterizing value and a target characterizing value for the region.

### Claim 17 (depends on 16)

The system of claim 16, wherein the cost function includes a second term that includes future parameter changes.

### Claim 18

A method for controlling a polishing system, the method comprising:
receiving from an in-situ monitoring system, for each region of a plurality of regions on a substrate being processed by the polishing system, a sequence of characterizing values for the region;
for each region, determining a polishing rate for the region; and
for each of a plurality of parameter update times, calculating an adjustment for at least one processing parameter, wherein calculating the adjustment for a particular parameter update time from the plurality of parameter update times includes calculating expected future parameter changes for one or more future parameter update times subsequent to the particular parameter update time.

### Claim 19

A computer program product for controlling a semiconductor processing system, the computer program product residing on a non-transitory computer readable medium, the computer program product comprising instructions for causing one or more computers to:
receive from an in-situ monitoring system, for each region of a plurality of regions on a substrate being processed by the processing system, a sequence of characterizing values for the region;
for each region, determine a rate of change of the characterizing value for the region; and
for each of a plurality of parameter update times, calculate an adjustment for at least one processing parameter, wherein calculation of the adjustment for a particular parameter update time from the plurality of parameter update times includes calculation of expected future parameter changes for one or more future parameter update times subsequent to the particular parameter update time.
