# US 2022/0278807 A1 · Target parameter determination method, communication node and storage medium

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0278807 A1
- Document ID: US20220278807A1
- Status: Published application
- Kind: A1
- Application number: 17/632,337
- Filed: 2020-07-30
- Published: 2022-09-01
- Earliest claimed: 2019-08-02
- Assignees: Zte Corporation
- Applicants: ZTE Corporation
- Inventors: Shujuan Zhang; Zhaohua Lu; Xiyu Wang; YuNgok Li; Chuangxin Jiang; Xianghui Han; Wei Gou
- Web page: https://patentgrep.com/patent/US20220278807A1

## CPC

- H04L 1/1864: {ARQ related signaling (H04L1/1607 takes precedence)}
- H04L 5/0055: {Physical resource allocation for ACK/NACK (for physical mapping arrangements in ARQ protocols H04L1/1861)}
- H04L 1/1812: Hybrid protocols; Hybrid automatic repeat request [HARQ]
- H04L 1/1861: {Physical mapping arrangements (for ACK signaling see also H04L5/0053)}
- H04L 1/1887: {Scheduling and prioritising arrangements}
- H04L 1/189: {Transmission or retransmission of more than one copy of a message}
- H04W 72/0446: Resources in time domain, e.g. slots or frames
- H04W 72/23: in the downlink direction of a wireless link, i.e. towards a terminal
- H04L 41/0803: Configuration setting
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

Provided are a target parameter determination method, a communication node and a storage medium. The target parameter determination method includes determining N types of information, where N is a positive integer, and a mapping relationship exists between the N types of information and a first-type set; and determining a target parameter according to the N types of information, where the target parameter includes at least one of a hybrid automatic repeat request (HARQ-ACK) parameter or a channel parameter.

## Claims

### Claim 1

A target parameter determination method, comprising:
determining CORESET group information, wherein a mapping relationship exists between the CORESET group information and a first-type set, and the first-type set comprises a downlink channel set and a HARQ-ACK bit set; and
determining a target parameter according to the CORESET group information, wherein the target parameter comprises a channel parameter;
wherein the channel parameter comprises information about a relationship between time domain resources occupied by E PDSCHs, wherein E is a positive integer greater than or equal to 2.

### Claim at position 2

2-4. (canceled)

### Claim 5 (depends on 1)

The method of claim 1, wherein the target parameter further comprises the HARQ-ACK parameter, the HARQ-ACK parameter comprises a downlink assignment index (DAI) for determining a bit sequence of HARQ-ACK information and a number of bits of HARQ-ACK information, and the determining the target parameter according to the CORESET group information comprises:
DAIs corresponding to different values of the CORESET group information are counted in a uniform manner;
a processing sequence of DAIs in multiple PDCCHs corresponding to different values of the CORESET group information is determined according to a predetermined rule;
wherein the DAI comprises the C-DAI and the T-DAI;
wherein the predetermined rule comprises the processing sequence of the DAIs in the PDCCHs corresponding to the different values of the CORESET group information is determined in ascending order of the values of the CORESET group information; wherein
the multiple PDCCHs correspond to a same value of the following information: a PDCCH monitoring occasion, a serving cell where a PDSCH scheduled by a PDCCH is located, a time unit where HARQ-ACK information corresponding to a PDCCH is located, a HARQ-ACK bit set containing HARQ-ACK information corresponding to a PDCCH, and a HARQ-ACK feedback resource where HARQ-ACK information corresponding to a PDCCH is located.

### Claim at position 4

6-10. (canceled)

### Claim 11 (depends on 1)

The method of claim 1, wherein the target parameter further comprises the HARQ-ACK parameter, the HARQ-ACK parameter comprises a downlink assignment index (DAI) for determining a bit sequence of HARQ-ACK information and, and a processing sequence of DAIs comprises:
first DAIs in PDCCHs corresponding to a same PDCCH monitoring occasion and a same serving cell are processed in ascending order of CORESET group information;
second, DAIs in PDCCHs corresponding to a same PDCCH monitoring occasion are processed in ascending order of serving cells; and
third, DAIs in PDCCHs are processed in ascending order of PDCCH monitoring occasions,
wherein HARQ-ACK information corresponding to the PDCCHs is comprised in one HARQ-ACK bit set.

### Claim 12 (depends on 1)

The method of claim 1, wherein the target parameter further comprises the HARQ-ACK parameter, the HARQ-ACK parameter comprises an uplink feedback resource where HARQ-ACK is located; and
the target parameter is determined according to the CORESET group information in the following manner:
the uplink feedback resource is determined according to uplink feedback resource information indicated in a PDCCH, wherein the PDCCH comprises a PDCCH satisfying a predetermined feature among multiple PDCCHs corresponding to multiple groups of HARQ-ACK information, and the uplink feedback resource comprises the multiple groups of HARQ-ACK information, wherein
an acquisition parameter of the PDCCH satisfying the predetermined feature comprises the CORESET group information; or in a case where a predetermined condition is satisfied, an acquisition parameter of the PDCCH satisfying the predetermined feature comprises the CORESET group information;
wherein the PDCCH satisfying the predetermined feature comprises a PDCCH having a largest index among the multiple PDCCHs, wherein an acquisition parameter of indexes of the multiple PDCCHs comprises the CORESET group information, a PDCCH monitoring occasion index, and a serving cell index corresponding to the PDCCH.

### Claim at position 7

13-14. (canceled)

### Claim 15 (depends on 12)

The method of claim 12, wherein the acquisition parameter of the indexes of the multiple PDCCHs comprises the CORESET group information, the PDCCH monitoring occasion index, and the serving cell index corresponding to the PDCCH in the following manner:
first PDCCHs corresponding to a same PDCCH monitoring occasion and a same serving cell are indexed in ascending order of the CORESET group information;
second, PDCCHs corresponding to a same PDCCH monitoring occasion are indexed in ascending order of serving cells; and
third, PDCCHs are indexed numbered in ascending order of PDCCH monitoring occasions.

### Claim at position 9

16-21. (canceled)

### Claim 22 (depends on 1)

The method of claim 1, further comprising:
in a case where one feedback resource comprises HARQ-ACK information of C downlink channels and C is greater than 1, determining, according to a time domain resource index of the PDSCH,
the following:
a position where the HARQ-ACK information of the C downlink channels is located in HARQ-ACK information comprised in one HARQ-ACK bit set in one feedback resource;
a position where the HARQ-ACK information of the C downlink channels is located in HARQ-ACK information comprised in one HARQ-ACK bit set in one feedback resource; and
a processing sequence of DAIs corresponding to the C downlink channels,
wherein C is a positive integer greater than 1, and the C downlink channels correspond to one combination value of a second-type information set, wherein
the second-type information set comprises the following information: a PDCCH monitoring occasion, a serving cell where a PDSCH is located, a time unit where a HARQ-ACK is located, a feedback resource where a HARQ-ACK is located, and a HARQ-ACK bit set containing a HARQ-ACK.

### Claim at position 11

23-28. (canceled)

### Claim 29 (depends on 1)

The method of claim 1, wherein the channel parameter further comprises:
a maximum number of received PDSCHs in one type of candidate PDSCHs.

### Claim 30

(canceled)

### Claim 31 (depends on 1)

The method of claim 1, wherein the target parameter is determined according to the N types of information in at least one of the following manners:
a predetermined condition needs to be satisfied between the time domain resources occupied by the E PDSCHs if the E PDSCHs correspond to a same value of CORESET group information; or
the predetermined condition does not need to be satisfied between time domain resources occupied by the E PDSCHs if the E PDSCHs corresponds to different values of.

### Claim 32 (depends on 31)

The method of claim 31, wherein the predetermined condition comprises:
a time domain resource intersection between the E PDSCHs is empty, wherein the E PDSCHs correspond to one or more HARQ-ACK processes of one serving cell.

### Claim at position 16

33-58. (canceled)

### Claim 59

A communication node, comprising:
at least one processor; and
a storage medium configured to store at least one program,
wherein when the at least one program is executed by the at least one processor, the at least one processor performs the following steps:
determining CORESET group information, wherein a mapping relationship exists between the CORESET group information and a first-type set, and the first-type set comprises a downlink channel set and a HARQ-ACK bit set; and
determining a target parameter according to the CORESET group information, wherein the target parameter comprises a channel parameter;
wherein the channel parameter comprises information about a relationship between time domain resources occupied by E PDSCHs, wherein E is a positive integer greater than or equal to 2.

### Claim 60

A non-transitory computer-readable storage medium, the storage medium storing a computer program which, when executed by a processor, causes the processor to perform the following steps:
determining CORESET group information, wherein a mapping relationship exists between the CORESET group information and a first-type set, and the first-type set comprises a downlink channel set and a HARQ-ACK bit set; and
determining a target parameter according to the CORESET group information, wherein the target parameter comprises a channel parameter;
wherein the channel parameter comprises information about a relationship between time domain resources occupied by E PDSCHs, wherein E is a positive integer greater than or equal to 2.

### Claim 61 (depends on 31)

The method of claim 31, wherein the predetermined condition comprises:
in a case where HARQ-ACK information of PDSCH1 is located in a first feedback time unit and HARQ-ACK information of PDSCH2 is located in a feedback time unit earlier than the first feedback time unit, a start position of PDSCH2 is not later than a start position of PDSCH1, wherein PDSCH1 and PDSCH2 belong to the E PDSCHs, and the E PDSCHs belong to one serving cell;
in a case where an end position of PDCCH4 is later than an end position of PDCCH3, a start position of PDSCH4 is not earlier than an end position of PDSCH3, wherein the PDCCH3 schedules the PDSCH3, the PDCCH4 schedules the PDSCH4, the PDSCH3 and the PDSCH4 belong to the E PDSCHs, and the E PDSCHs correspond to E HARQ-ACK processes of one serving cell.

### Claim 62 (depends on 59)

The communication node of claim 59, wherein the target parameter further comprises the HARQ-ACK parameter, the HARQ-ACK parameter comprises a downlink assignment index (DAI) for determining a bit sequence of HARQ-ACK information and a number of bits of HARQ-ACK information, and the determining the target parameter according to the CORESET group information comprises:
DAIs corresponding to different values of the CORESET group information are counted in a uniform manner;
a processing sequence of DAIs in multiple PDCCHs corresponding to different values of the CORESET group information is determined according to a predetermined rule;
wherein the DAI comprises the C-DAI and the T-DAI;
wherein the predetermined rule comprises the processing sequence of the DAIs in the PDCCHs corresponding to the different values of the CORESET group information is determined in ascending order of the values of the CORESET group information; wherein
the multiple PDCCHs correspond to a same value of the following information: a PDCCH monitoring occasion, a serving cell where a PDSCH scheduled by a PDCCH is located, a time unit where HARQ-ACK information corresponding to a PDCCH is located, a HARQ-ACK bit set containing HARQ-ACK information corresponding to a PDCCH, and a HARQ-ACK feedback resource where HARQ-ACK information corresponding to a PDCCH is located.

### Claim 63 (depends on 59)

The communication node of claim 59, wherein the target parameter further comprises the HARQ-ACK parameter, the HARQ-ACK parameter comprises a downlink assignment index (DAI) for determining a bit sequence of HARQ-ACK information and a number of bits of HARQ-ACK information, and a processing sequence of DAIs comprises:
first, DAIs in PDCCHs corresponding to a same PDCCH monitoring occasion and a same serving cell are processed in ascending order of CORESET group information;
second, DAIs in PDCCHs corresponding to a same PDCCH monitoring occasion are processed in ascending order of serving cells; and
third, DAIs in PDCCHs are processed in ascending order of PDCCH monitoring occasions,
wherein HARQ-ACK information corresponding to the PDCCHs is comprised in one HARQ-ACK bit set.

### Claim 64 (depends on 59)

The communication node of claim 59, wherein the target parameter further comprises the HARQ-ACK parameter, the HARQ-ACK parameter comprises an uplink feedback resource where a HARQ-ACK is located; and
the target parameter is determined according to the CORESET group information in the following manner:
the uplink feedback resource is determined according to uplink feedback resource information indicated in a PDCCH, wherein the PDCCH comprises a PDCCH satisfying a predetermined feature among multiple PDCCHs corresponding to multiple groups of HARQ-ACK information, and the uplink feedback resource comprises the multiple groups of HARQ-ACK information, wherein
an acquisition parameter of the PDCCH satisfying the predetermined feature comprises the CORESET group information; or in a case where a predetermined condition is satisfied, an acquisition parameter of the PDCCH satisfying the predetermined feature comprises the CORESET group information;
wherein the PDCCH satisfying the predetermined feature comprises a PDCCH having a largest index among the multiple PDCCHs, wherein an acquisition parameter of indexes of the multiple PDCCHs comprises the CORESET group information, a PDCCH monitoring occasion index, and a serving cell index corresponding to the PDCCH;
wherein the acquisition parameter of the indexes of the multiple PDCCHs comprises the CORESET group information, the PDCCH monitoring occasion index, and the serving cell index corresponding to the PDCCH in the following manner:
first, PDCCHs corresponding to a same PDCCH monitoring occasion and a same serving cell are indexed in ascending order of the CORESET group information;
second, PDCCHs corresponding to a same PDCCH monitoring occasion are indexed in ascending order of serving cells; and
third, PDCCHs are indexed in ascending order of PDCCH monitoring occasions.

### Claim 65 (depends on 59)

The communication node of claim 59, wherein when the at least one program is executed by the at least one processor, the at least one processor further performs the following steps:
in a case where one feedback resource comprises HARQ-ACK information of C downlink channels and C is greater than 1, determining, according to a time domain resource index of the PDSCH, the following:
a position where the HARQ-ACK information of the C downlink channels is located in HARQ-ACK information comprised in one HARQ-ACK bit set in one feedback resource; and
a processing sequence of DAIs corresponding to the C downlink channels,
wherein C is a positive integer greater than 1, and the C downlink channels correspond to one combination value of a second-type information set, wherein
the second-type information set comprises the following information: a PDCCH monitoring occasion, a serving cell where a PDSCH is located, a time unit where a HARQ-ACK is located, a feedback resource where a HARQ-ACK is located, and a HARQ-ACK bit set containing a HARQ-ACK.

### Claim 66 (depends on 59)

The communication node of claim 59, wherein the channel parameter further comprises:
a maximum number of received PDSCHs in one type of candidate PDSCHs.

### Claim 67 (depends on 59)

The communication node of claim 59, wherein the target parameter is determined according to the N types of information in at least one of the following manners:
a predetermined condition needs to be satisfied between the time domain resources occupied by the E PDSCHs if the E PDSCHs correspond to a same value of CORESET group information; or
the predetermined condition does not need to be satisfied between time domain resources occupied by the E PDSCHs if the E PDSCHs correspond to different values of CORESET group information.

### Claim 68 (depends on 67)

The communication node of claim 67, wherein the predetermined condition comprises:
a time domain resource intersection between E PDSCHs is empty, wherein the E PDSCHs correspond to one or more HARQ-ACK processes of one serving cell.

### Claim 69 (depends on 67)

The communication node of claim 67, wherein the predetermined condition comprises:
in a case where HARQ-ACK information of PDSCH1 is located in a first feedback time unit and HARQ-ACK information of PDSCH2 is located in a feedback time unit earlier than the first feedback time unit, a start position of PDSCH2 is not later than a start position of PDSCH1, wherein PDSCH1 and PDSCH2 belong to the E PDSCHs, and the E PDSCHs belong to one serving cell;
in a case where an end position of PDCCH4 is later than an end position of PDCCH3, a start position of PDSCH4 is not earlier than an end position of PDSCH3, wherein the PDCCH3 schedules the PDSCH3, the PDCCH4 schedules the PDSCH4, the PDSCH3 and the PDSCH4 belong to the E PDSCHs, and the E PDSCHs correspond to E HARQ-ACK processes of one serving cell.
