# US 2022/0278382 A1 · Method for inspecting self-discharge of a power storage device, and method for producing the power storage device

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0278382 A1
- Document ID: US20220278382A1
- Status: Published application
- Kind: A1
- Application number: 17/541,261
- Filed: 2021-12-03
- Published: 2022-09-01
- Earliest claimed: 2021-02-26
- Assignees: Prime Planet Energy & Solutions, Inc.
- Applicants: Prime Planet Energy & Solutions, Inc.
- Inventors: Toshinori OKURA; Ruri TANAKA
- Web page: https://patentgrep.com/patent/US20220278382A1

## CPC

- H01M 10/48: Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte (constructional details of current conducting connections for detecting conditions inside cells or batteries, e.g. details of voltage sensing terminals, H01M50/569)
- H02J 7/875: {Charging or discharging for charge maintenance, battery initiation or rejuvenation}
- G01R 31/386: {using test-loads}
- G01R 31/3865: {related to manufacture, e.g. testing after manufacture}
- H01M 10/0525: Rocking-chair batteries, i.e. batteries with lithium insertion or intercalation in both electrodes; Lithium-ion batteries
- H01M 10/4285: {Testing apparatus}
- H02J 7/82: Control of state of charge [SOC]
- Y02E 60/10: Energy storage using batteries
- Y02P 70/50: Manufacturing or production processes characterised by the final manufactured product
- H01M: PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

A self-discharge inspection method for a power storage device having a property that while the power storage device is pressed under a first load and charged with a first device voltage, in which a device voltage decreases when a load is reduced from the first load, includes detecting the first device voltage of the power storage device pressed under the first load and charged, continuously applying a power-supply voltage equal to the first device voltage from an external power supply, detecting a power-supply current flowing to the power storage device, determining a self-discharge state of the power storage device based on the detected power-supply current, and reducing the load applied to the power storage device from the first load by a load reduction amount before the power-supply current stabilizes after start of the voltage continuously applying.

## Claims

### Claim 1

A method for inspecting self-discharge of a power storage device, wherein the power storage device has a property that while the power storage device is pressed under a load set to a first load and charged with a device voltage set to a first device voltage, when the load is reduced from the first load, the device voltage decreases below the first device voltage,
wherein the method comprises:
a) detecting the first device voltage of the power storage device pressed under the first load and charged with the first device voltage;
b) continuously applying a power-supply voltage equal in magnitude to the first device voltage from an external power supply to the power storage device;
c) detecting a power-supply current flowing from the external power supply to the power storage device;
d) determining a self-discharge state of the power storage device based on the detected power-supply current; and
after start of the continuously applying b), before the power-supply current stabilizes, e) reducing the load applied to the power storage device from the first load by a load reduction amount.

### Claim 2 (depends on 1)

The method for inspecting self-discharge of a power storage device according to claim 1, wherein
the reducing e) is configured to: f) reduce the load applied to the power storage device after a lapse of a predetermined first time from the start of the continuously applying b), and
the load reduction amount is a non-defective-product load reduction amount meeting the following conditions:
(i) the power storage device is a non-defective device having good self-discharge characteristics; and
(ii) when the load applied to the non-defective device is reduced from the first load by the load reduction amount after a lapse of the predetermined first time from the start of the continuous applying b), the power-supply current sharply increases due to a decrease of the device voltage caused by the load reduction, and then quickly stabilizes.

### Claim 3 (depends on 1)

The method for inspecting self-discharge of a power storage device according to claim 1, wherein
the reducing e) is configured to: g) reduce the load applied to the power storage device after a lapse of a predetermined second time from start of the continuously applying b),
the load reduction amount is a threshold load reduction amount meeting the following conditions:
(iii) the power storage device is a threshold device having a self-discharge current corresponding to a magnitude of a threshold current value; and
(vi) when the load applied to the threshold device is reduced from the first load by the load reduction amount after a lapse of the predetermined second time from the start of the continuously applying b), the power-supply current sharply increases due to a decrease of the device voltage caused by the load reduction, and then quickly stabilizes.

### Claim 4 (depends on 1)

A method for producing a power storage device, the method comprising:
h) initially charging an assembled and uncharged power storage device into a predetermined charge state to provide a previously-charged power storage device; and
i) inspecting a self-discharge state of the initially charged power storage device by the self-discharge inspection method for the power storage device according to claim 1.

### Claim 5 (depends on 2)

A method for producing a power storage device, the method comprising:
h) initially charging an assembled and uncharged power storage device into a predetermined charge state to provide a previously-charged power storage device; and
i) inspecting a self-discharge state of the initially charged power storage device by the self-discharge inspection method for the power storage device according to claim 2.

### Claim 6 (depends on 3)

A method for producing a power storage device, the method comprising:
h) initially charging an assembled and uncharged power storage device into a predetermined charge state to provide a previously-charged power storage device; and
i) inspecting a self-discharge state of the initially charged power storage device by the self-discharge inspection method for the power storage device according to claim 3.
