# US 2022/0277268 A1 · Project management apparatus, project management method, and recording medium

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0277268 A1
- Document ID: US20220277268A1
- Status: Published application
- Kind: A1
- Application number: 17/637,454
- Filed: 2019-10-01
- Published: 2022-09-01
- Earliest claimed: 2019-10-01
- Assignees: Jgc Corporation
- Applicants: Jgc Corporation
- Inventors: Kazuyuki KOJIMA; Hiroki OHARA; Ming YU; Erio OOSATO
- Web page: https://patentgrep.com/patent/US20220277268A1

## CPC

- G06Q 10/06311: {Scheduling, planning or task assignment for a person or group}
- G06Q 10/103: {Workflow collaboration or project management}
- G06F 30/10: Geometric CAD
- G06Q 10/063116: {Schedule adjustment for a person or group}
- G06Q 10/06312: {Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling}
- G06Q 10/067: Enterprise or organisation modelling
- G06Q 10/0674: {using process simulation}
- G06Q 50/08: Construction
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

Provided is a project management apparatus configured to manage a project of constructing a construction object, the project management apparatus including: a display control unit configured to display on a display apparatus a simulation model of the construction object a reception unit configured to receive an operation of a user; a setting unit configured to set an order of a plurality of work packages, which are work units for constructing the construction object, based on an operation of the user on the simulation model; and a generation unit configured to generate a schedule of the project based on the order.

## Claims

### Claim 1

A project management apparatus, which is configured to manage a project of constructing a construction object, the project management apparatus comprising:
a display control unit configured to display on a display apparatus a simulation model of the construction object;
a reception unit configured to receive an operation of a user;
a setting unit configured to set an order of a plurality of work packages, which are work units for constructing the construction object, based on an operation of the user on the simulation model; and
a generation unit configured to generate a schedule of the project based on the order.

### Claim 2 (depends on 1)

The project management apparatus according to claim 1, further comprising a registration unit configured to register, based on an operation of the user on the simulation model, one or more components out of a plurality of components forming the construction object in each of the plurality of work packages.

### Claim 3 (depends on 2)

The project management apparatus according to claim 2, wherein the display control unit is configured to display the simulation model on the display apparatus in such a form that the order is identifiable.

### Claim 4 (depends on 1)

The project management apparatus according to claim 1, further comprising an adjustment unit configured to adjust the schedule,
wherein the display control unit is configured to display the schedule on the display apparatus, and
wherein the adjustment unit is configured to adjust the schedule based on an operation of the user.

### Claim at position 5 (depends on 1)

The project management apparatus according to claim 1, further comprising a calculation unit configured to calculate a work volume based on the schedule.

### Claim at position 6 (depends on 1)

The project management apparatus according to claim 1, wherein the simulation model includes a 3D model of the construction object.

### Claim 7

A project management method for managing a project of constructing a construction object, the project management method comprising:
displaying on a display apparatus a simulation model of the construction object;
setting an order of a plurality of work packages, which are work units for constructing the construction object, based on an operation of a user on the simulation model; and
generating a schedule of the project based on the order.

### Claim 8

A computer-readable recording medium having recoded thereon a project management program for causing a computer to manage a project of constructing a construction object, the project management program being a program for causing a computer to execute the procedures of:
displaying on a display apparatus a simulation model of the construction object;
setting an order of a plurality of work packages, which are work units for constructing the construction object, based on an operation of a user on the simulation model; and
generating a schedule of the project based on the order.

### Claim 9 (depends on 2)

The project management apparatus according to claim 2, further comprising an adjustment unit configured to adjust the schedule,
wherein the display control unit is configured to display the schedule on the display apparatus, and
wherein the adjustment unit is configured to adjust the schedule based on an operation of the user.

### Claim 10 (depends on 3)

The project management apparatus according to claim 3, further comprising an adjustment unit configured to adjust the schedule,
wherein the display control unit is configured to display the schedule on the display apparatus, and
wherein the adjustment unit is configured to adjust the schedule based on an operation of the user.

### Claim 11 (depends on 2)

The project management apparatus according to claim 2, further comprising a calculation unit configured to calculate a work volume based on the schedule.

### Claim 12 (depends on 3)

The project management apparatus according to claim 3, further comprising a calculation unit configured to calculate a work volume based on the schedule.

### Claim 13 (depends on 4)

The project management apparatus according to claim 4, further comprising a calculation unit configured to calculate a work volume based on the schedule.

### Claim 14 (depends on 2)

The project management apparatus according to claim 2, wherein the simulation model includes a 3D model of the construction object.

### Claim 15 (depends on 3)

The project management apparatus according to claim 3, wherein the simulation model includes a 3D model of the construction object.

### Claim 16 (depends on 4)

The project management apparatus according to claim 4, wherein the simulation model includes a 3D model of the construction object.

### Claim 17 (depends on 5)

The project management apparatus according to claim 5, wherein the simulation model includes a 3D model of the construction object.