# US 2022/0277238 A1 · Method of adjusting work unit price according to work progress speed of crowdsourcing-based project

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0277238 A1
- Document ID: US20220277238A1
- Status: Published application
- Kind: A1
- Application number: 17/749,576
- Filed: 2022-05-20
- Published: 2022-09-01
- Earliest claimed: 2019-11-21
- Assignees: Crowdworks, Inc.
- Applicants: Crowdworks Inc.
- Inventors: Min Woo PARK; Jeong Sik JANG
- Web page: https://patentgrep.com/patent/US20220277238A1

## CPC

- G06Q 10/06312: {Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling}
- G06Q 10/06315: {Needs-based resource requirements planning or analysis}
- G06Q 10/0631: Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q 10/06334: {using forecasting or predicting}
- G06Q 10/101: Collaborative creation, e.g. joint development of products or services
- G06Q 10/103: {Workflow collaboration or project management}
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

Disclosed is a method of adjusting a work unit price according to a work progress speed of a crowdsourcing-based project. The method includes setting a desired work progress speed of the project based on a predetermined work scale of the project and a target work completion period of the project before a project is opened, measuring an actual work progress speed at each predetermined period after the project is opened, and automatically adjusting the work unit price at the respective predetermined period by comparing the desired work progress speed with the actual work progress speed.

## Claims

### Claim 1

A method for adjusting a work unit price according to a work progress speed of a crowdsourcing-based project, the method performed by a computer comprising:
before the crowdsourcing-based project (hereinafter referred to as a “project”) is opened, setting a desired work progress speed of the project based on a predetermined work scale of the project and a target work completion period of the project;
after the project is opened, measuring an actual work progress speed at each predetermined period; and
automatically adjusting the work unit price at the respective predetermined period by comparing the desired work progress speed with the actual work progress speed,
wherein the comparing of the desired work progress speed with the actual work progress speed is performed based on a value “a×b” obtained by multiplying a value ‘a’ from dividing the number of works performed by workers during the predetermined period by the predetermined period, and a value ‘b’ from dividing the predetermined period by the target work completion period of the project,
wherein the adjusting of the work unit price includes:
increasing the work unit price when the actual work progress speed is slower than the desired work progress speed; and
decreasing the work unit price when the actual work progress speed is faster than the desired work progress speed,
wherein the adjusting of the work unit price further includes:
determining an increment or a decrement, by which the work unit price is adjusted, by applying a weight to a unit increment or a unit decrement depending on a difference between the desired work progress speed and the actual work progress speed.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
generating relationship data between the increment or the decrement of the work unit price and the actual work progress speed by analyzing a change in the actual work progress speed according to the increment or the decrement, after the automatically adjusting of the work unit price,

### Claim 3 (depends on 2)

The method of claim 2, wherein, at a first time point of the project, the weight is set to an initial value and is applied when the work unit price is adjusted.

### Claim 4 (depends on 2)

The method of claim 2, wherein, at a second time point after the first time point of the project, the weight is set to an optimal value based on the relationship data and is applied when the work unit price is adjusted.

### Claim 5 (depends on 1)

The method of claim 1, wherein the desired work progress speed is a value obtained by dividing the work scale of the project by the target work completion period of the project.

### Claim 6 (depends on 1)

The method of claim 1, wherein the adjusting of the work unit price includes:
when the actual work progress speed is identical to the desired work progress speed, maintaining the work unit price.

### Claim 7 (depends on 1)

The method of claim 1, further comprising:
setting a start unit price of the work unit price in advance before the project is opened.

### Claim 8 (depends on 1)

The method of claim 1, further comprising:
setting a change range of the work unit price including a minimum value and a maximum value of the work unit price in advance.

### Claim 9 (depends on 1)

The method of claim 1, wherein the measuring of the actual work progress speed at the respective predetermined period after the project is opened includes:
after a predetermined time expires after the project is opened, measuring the actual work progress speed at the respective predetermined period.

### Claim 10

A computer-readable recording medium storing a program in combination with a computer being a piece of hardware to execute a method of adjusting a work unit price according to a work progress speed of a crowdsourcing-based project, on a basis of the program, the method comprising:
before the crowdsourcing-based project (hereinafter referred to as a “project”) is opened, setting a desired work progress speed of the project based on a predetermined work scale of the project and a target work completion period of the project;
after the project is opened, measuring an actual work progress speed at each predetermined period; and
automatically adjusting the work unit price at the respective predetermined period by comparing the desired work progress speed with the actual work progress speed,
wherein the comparing of the desired work progress speed with the actual work progress speed is performed based on a value “a×b” obtained by multiplying a value ‘a’ from dividing the number of works performed by workers during the predetermined period by the predetermined period, and a value ‘b’ from dividing the predetermined period by the target work completion period of the project,
wherein the adjusting of the work unit price includes:
increasing the work unit price when the actual work progress speed is slower than the desired work progress speed; and
decreasing the work unit price when the actual work progress speed is faster than the desired work progress speed,
wherein the adjusting of the work unit price further includes:
determining an increment or a decrement, by which the work unit price is adjusted, by applying a weight to a unit increment or a unit decrement depending on a difference between the desired work progress speed and the actual work progress speed; and
on the basis of the program, the method further comprising:
generating relationship data between the increment or the decrement of the work unit price and the actual work progress speed by analyzing a change in the actual work progress speed according to the increment or the decrement, after the automatically adjusting of the work unit price,
wherein, at a first time point of the project, the weight is set to an initial value and is applied when the work unit price is adjusted, and
wherein, at a second time point after the first time point of the project, the weight is set to an optimal value based on the relationship data and is applied when the work unit price is adjusted.

### Claim 11 (depends on 10)

The recoding medium of claim 10, wherein the desired work progress speed is a value obtained by dividing the work scale of the project by the target work completion period of the project.

### Claim 12 (depends on 10)

The recoding medium of claim 10, wherein the adjusting of the work unit price includes:
when the actual work progress speed is identical to the desired work progress speed, maintaining the work unit price.

### Claim 13 (depends on 10)

The recoding medium of claim 10, further comprising:
setting a start unit price of the work unit price in advance before the project is opened.

### Claim 14 (depends on 10)

The recoding medium of claim 10, further comprising:
setting a change range of the work unit price including a minimum value and a maximum value of the work unit price in advance.

### Claim 15 (depends on 10)

The recoding medium of claim 10, wherein the measuring of the actual work progress speed at the respective predetermined period after the project is opened includes:
after a predetermined time expires after the project is opened, measuring the actual work progress speed at the respective predetermined period.