# US 2022/0266394 A1 · Processing method of npr steel rebar rod

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0266394 A1
- Document ID: US20220266394A1
- Status: Published application
- Kind: A1
- Application number: 17/634,181
- Filed: 2020-09-28
- Published: 2022-08-25
- Earliest claimed: 2019-08-21
- Assignees: Manchao HE; Min XIA
- Inventors: Manchao HE; Min XIA; Hongyan GUO; Hongchao LI
- Web page: https://patentgrep.com/patent/US20220266394A1

## CPC

- B21C 1/00: Manufacture of metal sheets, wire, rods, tubes or like semi-manufactured products by drawing
- C21D 7/10: of the whole cross-section, e.g. of concrete reinforcing bars
- B23K 31/02: relating to soldering or welding
- C21D 7/06: by shot-peening or the like
- B21B 1/163: {Rolling or cold-forming of concrete reinforcement bars or wire (reinforcement bars per se E04C5/03); Rolls therefor}
- B21B 15/0085: {Joining ends of material to continuous strip, bar or sheet}
- B21C 47/247: {Joining wire or band ends}
- B21F 1/02: Straightening
- Y02P 90/02: Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
- B21C: MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES, PROFILES OR LIKE SEMI-MANUFACTURED PRODUCTS OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- C21D: MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING (surface treatment of metallic material involving at least one process provided for in class C23 and at least one process covered by this subclass C23F17/00; unidirectional solidification of eutectic materials or unidirectional demixing of eutectoid materials C30B)
- B23K: SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B21B: ROLLING OF METAL (auxiliary operations used in connection with metal-working operations covered in B21, see B21C; bending by rolling B21D; manufacture of particular objects, e.g. screws, wheels, rings, barrels, balls, by rolling B21H; pressure welding by means of a rolling mill B23K20/04)
- B21F: WORKING OR PROCESSING OF METAL WIRE (rolling of metal wire B21B1/16; by drawing, auxiliary operations used in connection with metal-working without essentially removing material B21C)
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

A processing method of NPR steel rebar rod is disclosed. The NPR steel rebar is cold processed and has a yield strength of 800˜950 MPa, a tensile strength of 900˜1100 MPa, and a percentage elongation at maximum force of not less than 10˜40%. The processing method comprises the following steps: a I-shaped placing step L20, an uncoiling step L30, a flattening step L40, a butt welding step L50, a sandblasting step L60, a straightening step L70, a pointing step L80, a hydraulic head-pushing step L90, a cold drawn spiral ribbing step L10, a straight forward continuous wire drawing and traction step L11, a pre-straightening step L12, a fine straightening step L13, and a cutting-off step L14. The processing method can meet the automatic intelligent production requirements of NPR steel rebar, cold rolled spiral NPR steel rebar, and pre-stressed NPR steel rebar.

## Claims

### Claim 1

A processing method of NPR steel rebar rod, wherein the NPR steel rebar is cold processed and has a yield strength of 800˜950 MPa, a tensile strength of 900˜1100 MPa, and a percentage elongation at maximum force of not less than 10˜40%; the processing method comprises the following steps:
a I-shaped placing step L20: fixing one end of a coil rack, and performing head-to-tail welding of the steel rebar at a front end of the steel rebar without stopping;
an uncoiling step L30: providing a drawing force to a I-shaped de-coiler along a travel direction of steel rebar to preliminarily flatten the steel rebar, and synchronizing the I-shaped de-coiler with a wire drawing machine through intelligent control equipment to deliver the steel rebar synchronously for subsequent steps;
a flattening step L40: repeatedly bending the steel rebar to remove a stress in the steel rebar using a wheel-rolling flattening method, so as to flatten the steel rebar without scratch on its surface;
a butt welding step L50: matching a diameter of the steel rebar by controlling current using PLC numerical control technology, welding the steel rebar according to the time required for steel rebar welding and current for welding, and automatically removing burrs on a welding surface of the steel rebar after welding is completed;
a grit blasting step L60: automatically adjusting output of steel grit according to a diameter and surface requirements of the steel rebar to be processed, and processing oxide scales, and surface defects on the surface of hot-rolled NPR steel rebar inline, by using intelligent numerical control technology and communicating with a master control equipment;
a straightening step L70: after grit blasting, straightening the steel rebar by a straightening machine to make the steel bars more straight;
a pointing step L80: correcting or removing surface shape defects including “waterline” or “ellipse” of a head part of the steel rebar by using a pointing process, during each start of head threading process in the production line;
a hydraulic head-pushing step L90: pushing the head part of the steel rebar to pass through a spiral mold, and setting a length of the head part of the steel rebar passing through the spiral mold according to requirements of the wire drawing machine;
a cold drawn spiral ribbing step L10: forming spiral ribs on the steel rebar by means of roller die cold rolling;
a straight forward continuous wire drawing and traction step L11: pulling forward the raw material continually in a straight line, and repeatedly and alternately gripping and stretching the steel rebar forward by a rebar gripping device;
a pre-straightening step L12: eliminating an internal stress of the steel rebar using a method of multi-wheeled crossed 360-degree curve rolling and straightening, without damaging the spiral ribs of the steel rebar during the pre-straightening process;
a fine straightening step L13: performing fine straightening on the basis of pre-straightening, using a method of multi-wheel crossed or horizontal straightening; and
a cutting-off step L14: cutting off the NPR steel rebar rod inline with an adjustable cutting length within 4˜12 meters per rod.

### Claim 2 (depends on 1)

The processing method according to claim 1, wherein after the cutting-off step L14, the method further comprises:
a tidying-up step L15: tidying up the steel rebars using a rolling rack, pushing the steel rebars to a position limiting device through a spiral conveying shaft, and then pushing the steel rebars by a screw device to a conveying trough for tidying up;
an intelligent conveying step L16: according to the data command given by a central master controller and information data including the number of rebars, conveying distance, conveying residence time, delivering the steel rebars to a correct position for bundling;
an intelligent bundling step L17: bundling the steel rebars using a tying machine, wherein the steel rebar bundles pass through a closed wire way system and stop at a preset tying position to be bundled;
a conveying step L18: according to a data command of conveying distance and conveying residence time given by a central master controller, conveying the steel rebars to an unloading position; and
an intelligent unloading step L19: issuing, by the central master controller, instructions to control the unloading position according to a length of the steel rebars, dragging the steel rebars to a designated position and putting them into a finished product storage hopper.

### Claim 3 (depends on 1)

The processing method according to claim 1, wherein before the I-shaped placing step L20, the method further comprises:
intelligent master control step L01: connecting an intelligent master control system to a remote computer server through an optical fiber network cable, realizing remote one-key automatic start and stop through the server, and checking running status and production information of production line equipment through the server.
