# US 2022/0250277 A1 · Production plant and method for producing concrete tubbing in a tunnel lining system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0250277 A1
- Document ID: US20220250277A1
- Status: Published application
- Kind: A1
- Application number: 17/599,075
- Filed: 2020-04-07
- Published: 2022-08-11
- Earliest claimed: 2019-04-07
- Assignees: Herrenknecht AG
- Applicants: Herrenknecht AG
- Inventors: Stefan MEDEL
- Web page: https://patentgrep.com/patent/US20220250277A1

## CPC

- B28B 5/04: in moulds moved in succession past one or more shaping stations (on turn-tables B28B5/06)
- B25J 5/04: wherein the guideway is also moved, e.g. travelling crane bridge type
- B25J 9/0009: {Constructional details, e.g. manipulator supports, bases}
- B25J 11/00: Manipulators not otherwise provided for
- B28B 7/0014: {Fastening means for mould parts, e.g. for attaching mould walls on mould tables; Mould clamps (clamping means specially adapted for counteracting a pressure being applied on a slip or on the moulded article in the mould B28B1/266)}
- B28B 7/0044: {the sidewalls of the mould being only tilted away from the sidewalls of the moulded article, e.g. moulds with hingedly mounted sidewalls}
- B28B 7/386: {Cleaning}
- B28B 11/245: {Curing concrete articles (B28B11/242 takes precedence)}
- B28B 15/00: General arrangement or layout of plant {; Industrial outlines or plant installations}
- B28B 15/002: {Mobile plants, e.g. on vehicles or on boats}
- B28B 17/0081: {Process control}
- E21D 11/086: {Methods of making concrete lining segments}
- B28B: SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER (foundry moulding B22C; working stone or stone-like material B28D; shaping of substances in a plastic state, in general B29C; making layered products not composed wholly of these substances B32B)
- B25J: MANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES ({manipulators specially adapted for use in surgery A61B34/70; manipulators used in cleaning hollow articles B08B9/04}; manipulators associated with rolling mills B21B39/20; manipulators associated with forging machines B21J13/10; {manipulators associated with picking-up and placing mechanisms B23P19/007}; means for holding wheels or parts thereof B60B30/00; {vehicles with ground-engaging propulsion means, e.g. walking members B62D57/02, B62D57/032; devices for picking-up and depositing articles or materials between conveyors B65G47/90, B65G47/91; manipulators with gripping or holding means for transferring packages B65H67/065}; cranes B66C; {manipulators used in the protection or supervision of pipe-line installations F17D5/00; walking equipment adapted for nuclear steam-generators F22B37/006}; manipulators specially adapted for, or associated with, nuclear reactors G21C; {apparatus used for handling wafers during manufacture or treatment of semiconductor H10P72/50})
- E21D: SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS (soil-conditioning or soil-stabilising materials C09K17/00; drilling or cutting machines for mining or quarrying E21C; safety devices, transport, rescue, ventilation or drainage E21F)

## Abstract

The invention relates to a production plant for producing concrete tubbing (500) for a tunnel lining system having at least one formwork (10) for producing the concrete tubbing (500), wherein the production plant is designed either as a carousel system, which has at least one production line (200) with at least two work stations (210, 220, 230, 240, 250, 260) and with at least one transport route (110) between the at least two work stations (210, 220, 230, 240, 250, 260), each for executing at least one operation step in the production of the concrete tubbing (500), or as a stationary plant with at least two stationary formworks (10), wherein the operation steps necessary for producing the concrete tubbing (500) are each executed on the formworks (10), and with at least one curing station (300), for curing a concrete filled in the formwork (10) for producing the concrete tubbing (500). At least one robot (140) is provided to execute the at least one operation step on one of the at least two work stations (210, 220, 230, 240, 250, 260) or two formworks (10) are provided. At least one route (120) is provided which extends at least partially along or transverse to the at least one production line (200) or along or transverse to the formwork (10). At least one travel element (130) is provided on which the at least one robot (140) is arranged with a base (131) and with which the at least one robot (140) can be moved at least partially along or transverse to the at least one production line (200) or formwork (10).

## Claims

### Claim at position 1

1-25. (canceled)

### Claim 26

A production plant for producing concrete tubbing of a tunnel lining system, having at least one formwork for producing the concrete tubbing, wherein the production plant is one of:
a carousel plant using at least one operating step for producing the concrete tubbing with at least one production line having at least two workstations and having at least one transport route between the at least two workstations, or;
a stationary plant with at least two stationary formworks, wherein the required operating steps for producing the concrete tubbing are carried out on the formworks, and having at least one curing station for curing concrete filled into the formwork, comprising:
at least one robot for carrying out the at least one operating step at one of the at least two workstations or at least two formworks, wherein at least one travel route at least partially extends along or transversely to the at least one production line, or one of along or transversely to the formwork; and,
one travel element on which the at least one robot is disposed on a base, wherein the at least one robot is at least partially displaceable one of along or transversely to the at least one production line or formwork.

### Claim 27 (depends on 26)

The production plant as claimed in claim 26, wherein the base of the at least one robot on the at least one travel element is movable along the travel element into the workstation.

### Claim 28 (depends on 26)

The production plant as claimed in claim 26 wherein the travel route is one of on pillars, above the workstation or the formwork, or is disposed next to the workstation or the formwork.

### Claim 29 (depends on 26)

The production plant as claimed in claim 26, wherein the travel route comprises at least one track on at least one at least one of along or transversely to the at least one production line or formwork.

### Claim 30 (depends on 29)

The production plant as claimed in claim 29, wherein the travel element comprises a least one crossbeam, wherein at least one of;
the crossbeam ends are displaceable on a track; or,
the base of the at least one robot is disposed on the crossbeam to be displaceable across the workstation.

### Claim 31 (depends on 26)

The production plant as claimed in claim 26 wherein the robot comprises a tool wherein the tool is movable and pivotable in the space of the workstation.

### Claim 32 (depends on 31)

The production plant as claimed in claim 31, wherein the tool (150) is replaceable on the robot.

### Claim 33 (depends on 32)

The production plant as claimed in claim 32, wherein the replaceable tool is contained in a storage space which is one of displaceable by the robot, situated on the workstation, or in the region of the formwork.

### Claim 34 (depends on 31)

The production plant as claimed in claim 31 wherein the tool is at least one of a torque driver, a brush, a roller, a measurement verification element, a nozzle, a scanner, a gripper, or a camera.

### Claim 35

The production plant as claimed in 26 wherein the at least one workstation is at least one of a station for opening or closing the formwork, or a cover of the formwork; a station for retrieving the concrete tubbing; a station for cleaning the formwork; a station for preparing the formwork for subsequently introducing concrete; a station for equipping the formwork with at least one element of the concrete tubbing; a station for verifying the measurements of the formwork; a station for filling the formwork with concrete; or a station for treating the surface of the introduced concrete of the concrete tubbing.

### Claim 36 (depends on 35)

The production plant as claimed in claim 35, wherein the at least one element is at least one of a seal, a protective liner, a reinforcement element, a sensor including a temperature sensor, a dewatering element, a plastic element, or an erector anchor.

### Claim 37 (depends on 26)

The production plant as claimed in claim 26 wherein at least two production lines are disposed in parallel and comprise at least two parallel workstations.

### Claim 38 (depends on 37)

The production plant as claimed in claim 37, wherein the robot is displaceable between the at least two parallel workstations of the at least two parallel production lines.

### Claim 39 (depends on 26)

The production plant as claimed in claim 26 wherein at least one production plant for making reinforcements for the tubbings is disposed upstream, and the tubbings are temporarily stored in a store.

### Claim 40 (depends on 26)

The production plant as claimed in claim 26 wherein the at least one workstation is of modular construction.

### Claim 41 (depends on 26)

The production plant as claimed in claim 26 wherein the curing station is constructed from individual curing chambers comprising a standard ISO container.

### Claim 42 (depends on 26)

The production plant as claimed in claim 26 wherein the curing station comprises a plurality of planes disposed on top of one another.

### Claim 43 (depends on 26)

A method for producing concrete tubbing of a tunnel lining system having at least one formwork, including a production plant as claimed in claim 26, the method comprising the following steps:
1. disposing at a precise position, formwork at least one of a location or in a respective workstation along at least one production line of the production plant;
2. identifying optionally at least one of the type of formwork in the workstation, or at the location;
3. picking up optionally the tool required for carrying out an operating step by the robot;
4. displacing a base of the robot along at least one of travel route or a crossbeam for X/Y-alignment with a position required for carrying out the operating step at one of the workstation or at the location;
5. carrying out and completing the operating step by the robot using a suitable tool;
6. checking optionally the completion of the operating step by the robot using a suitable tool;
7. repeating optionally steps 3 to 6 for carrying out a further operating step at one of the workstation or the location;
8. transporting the formwork to one of the next workstation or curing station;
9. repeating optionally steps 3 to 8 for carrying out an operating step at one of the next workstation or at the next formwork at the next location.

### Claim 44 (depends on 43)

The method as claimed in claim 43 wherein the tool is at least one of a torque driver, a brush, a roller, a measurement verification element, a nozzle, a scanner, a gripper, or a camera.

### Claim 45 (depends on 43)

The method as claimed in claim 43 wherein the at least one workstation is at least one of: a station for opening or closing at least one of the formwork or a cover of the formwork; a station for retrieving the concrete tubbing; a station for cleaning the formwork; a station for preparing the formwork for subsequently introducing concrete; a station for equipping the formwork with at least one element of the concrete tubbing; a station for verifying the measurements of the formwork; a station for filling the formwork with concrete; or a station for treating the surface of the introduced concrete of the concrete tubbing.

### Claim 46 (depends on 43)

The method as claimed in claim 43 wherein the replaceable tool is at least one of retrieved from or deposited in a storage space which is one of displaceable by the robot or situated on the workstation.

### Claim 47 (depends on 43)

The method as claimed in claim 43 including an operating step, comprising;
one of opening or closing one of the formwork or the cover of the formwork;
retrieving the concrete tubbing;
cleaning the formwork;
preparing the formwork for subsequently introducing concrete;
equipping the formwork with at least one element of the concrete tubbing;
verifying the measurements of the formwork;
filling the formwork with concrete; or,
treating the surface of the introduced concrete of the concrete tubbing.

### Claim 48 (depends on 47)

The method as claimed in claim 47 wherein the at least one element is at least one of a seal, a protective liner, a reinforcement element, a sensor, including a temperature sensor, a dewatering element, a plastic element, or an erector anchor.

### Claim 49 (depends on 43)

The method as claimed in claim 43 wherein the tool is at least one of a torque driver, a brush, a roller, a measurement verification element, a nozzle, a scanner, a gripper, or a camera.