Exposure-time-based cost function for route planning
AssigneeRockwell Collins, Inc.
InventorKeith M. Allen
Life of this patent
Estimating the term…
Abstract
A system and method are disclosed. The system includes a computer readable medium having non-transitory computer readable program code embodied therein for risk-aware contingency flight re-planning. The computer readable instructions include instructions, which when executed by a computer device or processors, perform and direct the step of receiving a preplanned route, receiving a risk tolerance level from a decision maker, receiving input from a database, receiving an indication of an en route risk to the vehicle, determining an association of an exposure cost with at least one of a plurality of 4-D paths, ranking the plurality of 4-D paths based on the association of the exposure cost, and displaying a portion of the plurality of 4-D paths to the decision maker.
Claims15
A system comprising:
- A computer readable medium having non-transitory computer readable program code embodied therein for risk-aware contingency flight re-planning, the computer readable program code comprising instructions which, when executed by a computer device or processor, perform and direct the steps of:
- receiving a preplanned route, wherein the preplanned route is configured for a 3-D routing of a vehicle, and wherein the preplanned route is activated within the vehicle prior to a departure of the vehicle;
- receiving a risk tolerance level from a decision maker;
- receiving input from a threat database, a terrain database, an obstacle database, a threat lethality database, a fuel evaluator, a terrain masking evaluator, a time evaluator, and a vehicle performance database;
- receiving an indication of an en route risk to the vehicle, wherein the en route risk comprises a risk type;
- determining a plurality of 4-D paths for the vehicle to traverse, wherein each 4-D path is comprised of a plurality of 4-D states, and wherein each 4-D state selected for the 4-D path configured based on the risk tolerance level and the received input;
- determining an association of at least one of a path cost, a time cost, a threat level, an arc cost, and an extra traversal cost with at least one of the plurality of 4-D paths;
- determining an association of an exposure cost with at least one of the plurality of 4-D paths;
- ranking the plurality of 4-D paths, wherein the ranking is based on the risk tolerance level, the risk type, the association of the exposure cost, and the association of at least one of the path cost, the time cost, the threat level, the arc cost, and the extra traversal cost;
- displaying a portion of the plurality of 4-D paths to the decision maker, wherein the portion is determined by the ranking of the plurality of 4-D paths;
- receiving a path selection from the decision maker, wherein the path selection comprises designating and activating a selected 4-D path from the portion;
- and
- displaying the activated 4-D path to an operator of the vehicle.
A method for risk-aware contingency flight re-planning, comprising:
- receiving a preplanned route, wherein the preplanned route is planned for a 3-D routing of a vehicle, wherein the preplanned route is activated within the vehicle prior to a departure of the vehicle;
- receiving a risk tolerance level from a decision maker;
- receiving input from a threat database, a terrain database, an obstacle database, a threat lethality database, a fuel evaluator, a terrain masking evaluator, a time evaluator, and a vehicle performance database;
- receiving an indication of an en route risk to the vehicle, wherein the en route risk comprises a risk type;
- determining a plurality of 4-D paths for the vehicle to traverse, wherein each 4-D path comprises of a plurality of 4-D states, wherein each 4-D state is selected for the 4-D path based on the risk tolerance level and the received input;
- determining an association of at least one of a path cost, a time cost, a threat level, an arc cost, and an extra traversal cost with each of the plurality of 4-D paths;
- determining an association of an exposure cost with at least one of the plurality of 4-D paths;
- ranking the plurality of 4-D paths, wherein the ranking is based on the risk tolerance level, the risk type, the association of the exposure cost, and at least one of the association of the path cost, the time cost, the threat level, the arc cost, and the extra traversal cost;
- displaying a portion of the plurality of 4-D paths to the decision maker, wherein the portion is determined by the ranking of the plurality of 4-D paths;
- receiving a path selection from the decision maker, wherein the path selection comprises designating and activating a selected 4-D path from the portion;
- and
- displaying the activated 4-D path to an operator of the vehicle.
Dependencies are inferred from the claim text.