Estimate active-adjacent borehole interference severity
AssigneeHalliburton Energy Services, Inc.
InventorsWilliam Owen Alexander Ruhle, Dinesh Ananda Shetty, Srividhya Sridhar, Shahab Jamali
Life of this patent
Estimating the term…
Loading patent…
AssigneeHalliburton Energy Services, Inc.
InventorsWilliam Owen Alexander Ruhle, Dinesh Ananda Shetty, Srividhya Sridhar, Shahab Jamali
Estimating the term…
This disclosure presents processes to determine whether a leak-off event is occurring during the treatment stage of an active borehole. The leak-off event data, such as the severity or magnitude of the potential leak-off, can be communicated to other systems to adjust the treatment stage, the fluid composition, the fluid pressure, or the fluid flow rate. Diverter material can be added to the fluid. The monitoring of the leak-off event can occur over a time interval, such as the time of the treatment stage and periodic adjustments to the treatment stage can be implemented. The leak-off event can be identified when a fluid pressure slope indicates an overall increase in pressure in an adjacent borehole or if the amount of fluid entering an adjacent borehole exceeds a leak-off threshold.
A method, comprising:
A system that includes an active borehole of a reservoir undergoing at least one treatment stage where pumped fluid is pumped into the active borehole, comprising:
A computer program product having a series of operating instructions stored on a non-transitory computer-readable medium that directs a data processing apparatus when executed thereby to perform operations to determine a leak-off event, the operations comprising:
Dependencies are inferred from the claim text.