High-rise building settling reinforcing and lifting correcting construction method
AssigneeBeijing Hengxiang Hongye Foundation Reinforcement Technology Co., Ltd.
InventorsXuedong Cui, Jiguang Wu, Tengyue Cui
Life of this patent
Estimating the term…
Loading patent…
AssigneeBeijing Hengxiang Hongye Foundation Reinforcement Technology Co., Ltd.
InventorsXuedong Cui, Jiguang Wu, Tengyue Cui
Estimating the term…
A high-rise building settling reinforcing and lifting correcting construction method, comprising: drilling holes vertically downward around a foundation slab of a building, forming multiple curtain wall holes sunk into foundation soil at intervals; injecting slurry into the curtain wall holes, slurry ranges meshing and overlapping with each other, forming a curtain wall, the curtain wall enclosing foundation soil under the foundation slab of the building, separating foundation soil inside and outside the range of the building; providing multiple vertical reinforcement slurry injection holes on the foundation slab and injecting slurry, fully reinforcing soil near the foundation slab, forming a reinforcement body; drilling a hole downward, forming a lifting hole, pressure-injecting slurry into a bottom part of the lifting hole, the foundation soil is continuously filled and compressed, creating a lifting force, and the building gradually rising to a determined lift height.
A high-rise building settling reinforcing and lifting correcting construction method, comprising:
Dependencies are inferred from the claim text.