Method and elevator arrangement
AssigneeKone Corporation
InventorsMarkku HAAPANIEMI, Matti RASANEN, Sami SAARELA, Anssi VENHO, Janne MIKKONEN, Otto LANZ, Tarvo VIITA-AHO, Petri KERE
Life of this patent
Estimating the term…
Loading patent…
AssigneeKone Corporation
InventorsMarkku HAAPANIEMI, Matti RASANEN, Sami SAARELA, Anssi VENHO, Janne MIKKONEN, Otto LANZ, Tarvo VIITA-AHO, Petri KERE
Estimating the term…
The invention relates to a method for managing flow of people and goods within a building under construction, comprising providing one or more elevator control systems for automatically controlling movement of elevator cars; providing a first passenger elevator, the first passenger elevator comprising a first passenger elevator car for transporting people, the first passenger elevator car being vertically movable in an elevator hoistway formed inside the building under construction, vertical movement of the car being automatically controlled by an elevator control system, the first passenger elevator car comprising an interior delimited by floor, walls, ceiling and at least one automatic door; and providing a goods elevator, the goods elevator comprising a goods elevator car for transporting goods, the goods elevator car being vertically movable beside the first passenger elevator car in an elevator hoistway formed inside the building under construction, vertical movement of the goods elevator car being automatically controlled by an elevator control system, the goods elevator car comprising at least a transport platform; using the first passenger elevator to transport passengers between floors of the building under construction; and using the goods elevator to transport goods between floors of the building under construction. The invention also relates to an arrangement for managing flow of people and goods within a building under construction, which arrangement implements the method.
A method for managing flow of people and goods within a building under construction, comprising
An arrangement for managing flow of people and goods within a building under construction, comprising
Dependencies are inferred from the claim text.