System and method for effort estimation
AssigneeABB Schweiz AG
InventorsRaoul JETLEY, Will Baylor SNIPES, Srini RAMASWAMY
Life of this patent
Estimating the term…
Loading patent…
AssigneeABB Schweiz AG
InventorsRaoul JETLEY, Will Baylor SNIPES, Srini RAMASWAMY
Estimating the term…
A method (600) for configuring one or more components of a process plant includes receiving (602) a change request (226) and receiving (604) a system dependency graph (228) corresponding to the process plant. The method (600) further includes selecting (606) a subset of components (230) among the plurality of components based on configuration of the process plant and identifying (608) a subset of nodes (232) among the plurality of nodes by traversing a path in the system dependent graph (228). The method (600) also includes computing (610) an impact parameter (234) value based on a traversed path and computing (612) a plurality of change parameter values (236) based on the traversed path. The method (600) further includes determining (614) an effort estimate (210) based on the impact parameter (234) value and the plurality of change parameter values (236) using a machine learning technique.
A method (600) for configuring one or more components among a plurality of components of a process plant to optimize an industrial process deployed in the process plant, wherein the method is performed by a computing system, the method comprising:
A system (200) for configuring one or more components among a plurality of components of a process plant to optimize an industrial process deployed in the process plant, the system (200) comprising:
Dependencies are inferred from the claim text.