# US 2022/0065532 A1 · Metallurgical furnace

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0065532 A1
- Document ID: US20220065532A1
- Status: Published application
- Kind: A1
- Application number: 17/418,763
- Filed: 2019-12-04
- Published: 2022-03-03
- Earliest claimed: 2019-03-11
- Assignees: Refractory Intellectual Property GmbH & Co. KG
- Applicants: Refractory Intellectual Property GmbH & Co. KG
- Inventors: Bojan Zivanovic
- Web page: https://patentgrep.com/patent/US20220065532A1

## CPC

- F27B 3/14: Arrangements of linings
- C21B 7/06: Linings for furnaces
- C22B 5/02: Dry methods {smelting of sulfides or formation of mattes}
- C22B 15/0028: {Smelting or converting}
- F27D 1/004: {Linings or walls comprising means for securing bricks}
- F27D 1/12: incorporating cooling arrangements
- F27D 9/00: Cooling of furnaces or of charges therein (casings, linings, walls or roofs incorporating cooling arrangements F27D1/12)
- F27D 2009/0062: {made from copper or copper alloy}
- Y02P 10/20: Recycling
- F27B: FURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- C21B: MANUFACTURE OF IRON OR STEEL (preliminary treatment of ferrous ores or scrap C22B1/00)
- C22B: PRODUCTION AND REFINING OF METALS (electrolytic C25); PRETREATMENT OF RAW MATERIALS
- F27D: DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

The invention relates to a metallurgic furnace, in particular a metallurgic furnace for receiving a molten metal.

## Claims

### Claim 1

A metallurgical furnace (1) comprising the following features:
1.1 a furnace wall (2) enclosing a furnace chamber (3);
1.2 the furnace wall (3) comprises at least one cooling element (4), wherein the cooling element (4) comprises the following features:
1.2.1 a metal element (5) comprising a side (6) facing the furnace chamber (3);
1.2.2 a masonry (10) arranged opposite the side (6) of the metal element (5) facing the furnace chamber (3) and at a distance from this side (6) of the metal element (5);
1.2.3 the masonry (10) comprises refractory bricks (11) arranged in several layers (11.1, 11.2, 11.3, 11.4, 11.5) one above the other;
1.2.4 metal rails (9) extending through the masonry (10);
1.2.5 guide means (7, 7.1, 7.2; 9.3, 9.4) by means of which the metal rails (9) are vertically guidable fastened to the metal element (5).

### Claim 2 (depends on 1)

Furnace (1) according to claim 1, wherein the masonry (10) is erected without mortar.

### Claim 3 (depends on 1)

Furnace (1) according to claim 1, wherein the metal rails (9) run along the side (6) of the metal element (5) facing the furnace chamber (3).

### Claim 4 (depends on 1)

Furnace (1) according to claim 1, wherein the metal rails (9) run at a constant distance from the metal element (5) along the side (6) of the metal element (5) facing the furnace chamber (3).

### Claim 5 (depends on 1)

Furnace (1) according to claim 1, wherein the metal rails (9) run horizontally.

### Claim 6 (depends on 1)

Furnace (1) according to claim 1, wherein the metal rails (9) run in grooves (15, 16, 17, 18, 19, 20, 21, 22) formed in the refractory bricks (11) of the masonry (10).

### Claim 7 (depends on 6)

Furnace (1) according to claim 6, wherein the grooves (15, 16, 17, 18, 19, 20, 21, 22) are formed on the bottom side, the top side or both on the bottom side and the top side of the refractory bricks (11).

### Claim 8 (depends on 1)

Furnace (1) according to claim 1, wherein the masonry (10) has a side (13) facing the side (6) of the metal element (5) facing the furnace chamber (3), and wherein the metal rails (9) have sections (9.2) projecting beyond said side (13) of the masonry (10).

### Claim 9 (depends on 8)

Furnace (1) according to claim 8, wherein the sections (9.2) extend at least along the predominant length of the masonry (10).

### Claim 10 (depends on 1)

Furnace (1) according to claim 1, wherein the guide means (7, 7.1, 7.2; 9.3, 9.4) are designed as rail guide.

### Claim 11 (depends on 10)

Furnace (1) according to claim 10, wherein the rail guide (7, 7.1, 7.2; 9.3, 9.4) comprises guide rails (7) on which the metal rails (9) are vertically guidable arranged.

### Claim 12 (depends on 11)

Furnace (1) according to claim 11, wherein the guide rails (7) are arranged on the side of the metal element (5) facing the furnace chamber (3).

### Claim 13 (depends on 1)

Furnace (1) according to claim 1, wherein a sealing means is arranged between the metal element (5) and the masonry (10).

### Claim 14 (depends on 1)

Furnace (1) according to claim 1, wherein the furnace chamber (3) is designed to receive a molten metal.

### Claim 15 (depends on 1)

Furnace (1) according to claim 1, which is designed for obtaining copper by the flash smelting method.