# US 2022/0049516 A1 · Modular manufacture, delivery, and assembly of nuclear reactor building systems

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0049516 A1
- Document ID: US20220049516A1
- Status: Published application
- Kind: A1
- Application number: 17/234,581
- Filed: 2021-04-19
- Published: 2022-02-17
- Earliest claimed: 2020-08-17
- Assignees: TerraPower, LLC; GE-Hitachi Nuclear Energy Americas LLC
- Applicants: TerraPower, LLC; GE-Hitachi Nuclear Energy Americas LLC
- Inventors: Derek Bass; Michael F. Dimitri; Brian C. Johnson; Calen Kaneko; Tatjana Kirby; Christopher A. Martin; Sean Mosier; Philip M. Schloss; Nathan Smith; Mark R. Werner
- Web page: https://patentgrep.com/patent/US20220049516A1

## CPC

- G21C 3/08: provided with external means to promote heat-transfer, e.g. fins, baffles
- G21C 13/00: Pressure vessels; Containment vessels; Containment in general (for chemical or physical processes B01J3/00; pressure vessels in general F16J12/00)
- G21C 3/322: Means to influence the coolant flow through or around the bundles
- G21C 3/328: Relative disposition of the elements in the bundle lattice
- G21C 3/338: Helicoidal spacer elements
- G21C 3/3432: {Grids designed to influence the coolant, i.e. coolant mixing function}
- G21C 13/028: Seals, e.g. for pressure vessels or containment vessels
- G21C 13/087: Metallic vessels
- G21C 13/093: Concrete vessels
- G21C 13/10: Means for preventing contamination in the event of leakage, {e.g. double wall}
- G21C 15/18: Emergency cooling arrangements; Removing shut-down heat
- G21C 21/02: Manufacture of fuel elements or breeder elements contained in non-active casings
- G21C 3/16: Details of the construction within the casing
- G21C 19/06: Magazines for holding fuel elements or control elements
- G21C 21/00: Apparatus or processes specially adapted to the manufacture of reactors or parts thereof (in general section B, e.g. B23)
- Y02E 30/00: Energy generation of nuclear origin
- Y02E 30/30: Nuclear fission reactors
- G21C: NUCLEAR REACTORS (fusion reactors, hybrid fission-fusion reactors G21B; nuclear explosives G21J)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

A nuclear reactor is constructed in sub-modules and super modules which are manufactured, packaged, and shipped to a construction site. At least some of the modules are packaged in suitable shielding containers or portions of containers, which may be steel. The modules are assembled on-site, and some of the modules remain within their respective shipping containers after assembly. One or more of the shipping containers may be used as concrete forms to support the pouring of concrete in between selected modules. The concrete may be used for structural support, shielding, or both.

## Claims

### Claim 1

A method of constructing a nuclear reactor, comprising:
receiving a first nuclear reactor component in a first steel container;
receiving a second nuclear reactor component in a second steel container;
placing the second steel container in proximity to the first steel container; and
pouring concrete between the second steel container and the first steel container, the second steel container and the first steel container used as forms to contain poured concrete.

### Claim 2 (depends on 1)

The method as in claim 1, wherein the first nuclear reactor component remains within the first steel container during operation of the nuclear reactor.

### Claim 3 (depends on 1)

The method of claim 1, further comprising attaching one or more form ties between the first steel container and the second steel container.

### Claim 4 (depends on 1)

The method of claim 1, further comprising excavating earth to create a subgrade region.

### Claim 5 (depends on 4)

The method of claim 4, further comprising placing the first steel container in the subgrade region.

### Claim 6 (depends on 5)

The method of claim 5, further comprising the step of connecting the first steel container to the second steel container and wherein placing the first steel container in the subgrade region is performed after the step of connecting the first steel container to the second steel container.

### Claim 7 (depends on 6)

The method of claim 6, wherein the step of connecting the first steel container to the second steel container comprises welding form ties between the first steel container and the second steel container.

### Claim 8 (depends on 6)

The method of claim 6, wherein the step of connecting the first steel container to the second steel container comprises coupling the containers with one or more fluid conduits.

### Claim 9

A method of constructing a nuclear reactor, comprising:
fabricating one or more sub-modules in a manufacturing facility, the one or more sub-modules comprising a skid and a shielding;
assembling one or more sub-modules into one or more super modules using temporary connections at the manufacturing facility;
disassembling the super modules; and
transporting the sub-modules to an installation site.

### Claim 10 (depends on 9)

The method of claim 9, further comprising:
at the installation site:
assembling two or more sub-modules using permanent connections;
installing concrete form ties between the two or more sub-modules;
welding the two or more sub-modules together to create a super module;
pouring concrete between the two or more sub-modules; and
installing the super module in place.

### Claim 11 (depends on 10)

The method of claim 10, wherein the one or more sub-modules include one or more of a compressor module, a tank module, and a charcoal bed module.

### Claim 12 (depends on 9)

The method of claim 9, wherein the shielding is made up of multiple pieces and further comprising the step of, at the installation site: welding the multiple pieces of shielding to the sub-module.

### Claim 13 (depends on 9)

The method of claim 9, wherein transporting the sub-modules to the installation site comprises shipping the sub-modules by truck.

### Claim 14 (depends on 9)

The method of claim 9, wherein a first submodule of the one or more submodules has a steel container permanently formed around the first submodule, the steel container having a preformed aperture.

### Claim 15 (depends on 14)

The method of claim 14, wherein the first submodule comprises a pipe coupled to the preformed aperture.

### Claim 16

A construction method, comprising:
fabricating, at a manufacturing facility, a first sub-module, the first sub-module positioned within a first container;
fabricating, at the manufacturing facility, a second sub-module, the second sub-module positioned within a second container;
shipping the first sub-module and the second sub-module to a construction site;
placing the first sub-module and the second sub-module in place, the first container and the second container remaining in place;
coupling the first container and the second container together; and
placing concrete between the first container and the second container.

### Claim 17 (depends on 16)

The construction method as in claim 16, wherein the first container is a steel container.

### Claim 18 (depends on 16)

The construction method as in claim 16, wherein the first container has a pre-formed opening to provide a pathway through the first container.

### Claim 19 (depends on 16)

The construction method as in claim 16, further comprising connecting form ties in between the first container and the second container.

### Claim 20 (depends on 16)

The construction method as in claim 16, wherein coupling the first container and the second container together comprises fluidically coupling the first container and the second container together.