# US 2022/0035429 A1 · Method and system for intelligent power distribution management

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2022/0035429 A1
- Document ID: US20220035429A1
- Status: Published application
- Kind: A1
- Application number: 16/943,757
- Filed: 2020-07-30
- Published: 2022-02-03
- Earliest claimed: 2020-07-30
- Assignees: EMC IP Holding Company LLC
- Applicants: EMC IP Holding Company LLC
- Inventors: Santosh Kumar Sahu; Sathish Kumar Ponnusamy; Suren Kumar J; Vinod Durairaj
- Web page: https://patentgrep.com/patent/US20220035429A1

## CPC

- G06F 1/28: Supervision thereof, e.g. detecting power-supply failure by out of limits supervision
- G06F 1/30: Means for acting in the event of power-supply failure or interruption, e.g. power-supply fluctuations (for resetting only G06F1/24)
- G06F 1/3209: Monitoring remote activity, e.g. over telephone lines or network connections
- G06F 1/3215: Monitoring of peripheral devices
- G06F 1/3234: Power saving characterised by the action undertaken
- G06F 1/325: {Power saving in peripheral device}
- G06F 11/3031: {where the computing system component is a motherboard or an expansion card}
- G06F 11/3058: {Monitoring arrangements for monitoring environmental properties or parameters of the computing system or of the computing system component, e.g. monitoring of power, currents, temperature, humidity, position, vibrations (thermal management in cooling arrangements of a computing system G06F1/206)}
- G06F 11/3062: {where the monitored property is the power consumption (power management in a computing system G06F1/3203)}
- G06F 11/3433: {for load management (allocation of a server based on load conditions G06F9/505; load rebalancing G06F9/5083; redistributing the load in a network by a load balancer H04L67/1029)}
- Y02D 10/00: Energy efficient computing, e.g. low power processors, power management or thermal management
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- Y02D: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE

## Abstract

A method and system for intelligent power distribution management. Specifically, the disclosed method and system propose allocating (and deallocating) reserve or supplemental electrical power to host devices dynamically based on intelligent analyses of host device telemetry including, but not limited to, workload criticality, workload computing resource utilization, hardware configuration metadata, various operational parameters describing host device state, and measurements (as well as other information) pertinent to electrical power usage.

## Claims

### Claim 1

A method for intelligent power distribution management, comprising:
identifying a set of power-hungry devices;
generating, in order of workload criticality for workloads supported thereon, a host priority list ranking the set of power-hungry devices; and
allocating, based on the host priority list, reserve electrical power to a set of top-ranked power-hungry devices.

### Claim 2 (depends on 1)

The method of claim 1, wherein each power-hungry device, of the set of power-hungry devices, represents a host device exhibiting electrical power usage nearing an electrical power usage limit imposed thereon.

### Claim 3 (depends on 1)

The method of claim 1, further comprising:
prior to identifying the set of power-hungry devices:
identifying a set of power-cache devices; and
obtaining monitoring telemetry for the set of power-cache devices,
wherein the set of power-hungry devices is identified from the set of power-cache devices based on a first portion of the monitoring telemetry.

### Claim 4 (depends on 3)

The method of claim 3, wherein each power-cache device, of the set of power-cache devices, represents a host device whereon a power-cache feature is enabled, wherein an enabled power-cache feature identifies the host device as eligible for reserve electrical power allocation.

### Claim 5 (depends on 3)

The method of claim 3, wherein the first portion of the monitoring telemetry comprises measurements and other information pertinent to electrical power usage.

### Claim 6 (depends on 3)

The method of claim 3, wherein the host priority list is generated based on a second portion of the monitoring telemetry, wherein the second portion of the monitoring telemetry comprises the workload criticality for workloads supported thereon, computing resource utilizations by workloads supported thereon, hardware configuration metadata describing hardware configurations installed thereon, and measurements and other operational parameters describing current states thereof.

### Claim 7 (depends on 6)

The method of claim 6, wherein the host priority list is further generated through processing of the second portion of the monitoring telemetry using ensemble machine learning algorithms.

### Claim 8 (depends on 3)

The method of claim 3, further comprising:
prior to identifying the set of power-cache devices:
identifying, from a plurality of host devices, a set of power-cap devices,
wherein the set of power-cache devices is identified from the set of power-cap devices,
wherein each power-cap device, of the set of power-cap devices, represents a host device whereon a power-cap feature is enabled, wherein an enabled power-cap feature imposes an electrical power usage limit on the host device.

### Claim 9 (depends on 1)

The method of claim 1, further comprising:
after allocating the reserve electrical power to the set of top-ranked power-hungry devices:
obtaining monitoring telemetry for the set of top-ranked power-hungry devices;
making a determination, based on the monitoring telemetry, that at least one top-ranked power-hungry device, of the set of top-ranked power-hungry devices, is no longer power-hungry; and
deallocating, based on the determination, the reserve electrical power from, which had been allocated to, the at least one top-ranked power-hungry device.

### Claim 10 (depends on 9)

The method of claim 9, wherein the monitoring telemetry comprises measurements and other information pertinent to electrical power usage, wherein the at least one top-ranked power-hungry device is determined as no longer power-hungry based on the electrical power usage falling below a threshold from an electrical power usage limit imposed on the at least one top-ranked power-hungry device.

### Claim 11

A non-transitory computer readable medium (CRM) comprising computer readable program code, which when executed by a computer processor, enables the computer processor to:
identify a set of power-hungry devices;
generate, in order of workload criticality for workloads supported thereon, a host priority list ranking the set of power-hungry devices; and
allocate, based on the host priority list, reserve electrical power to a set of top-ranked power-hungry devices.

### Claim 12 (depends on 11)

The non-transitory CRM of claim 11, wherein each power-hungry device, of the set of power-hungry devices, represents a host device exhibiting electrical power usage nearing an electrical power usage limit imposed thereon.

### Claim 13 (depends on 11)

The non-transitory CRM of claim 11, comprising computer readable program code, which when executed by the computer processor, further enables the computer processor to:
prior to identifying the set of power-hungry devices:
identify a set of power-cache devices; and
obtain monitoring telemetry for the set of power-cache devices,
wherein the set of power-hungry devices is identified from the set of power-cache devices based on a first portion of the monitoring telemetry.

### Claim 14 (depends on 13)

The non-transitory CRM of claim 13, wherein each power-cache device, of the set of power-cache devices, represents a host device whereon a power-cache feature is enabled, wherein an enabled power-cache feature identifies the host device as eligible for reserve electrical power allocation.

### Claim 15 (depends on 13)

The non-transitory CRM of claim 13, wherein the first portion of the monitoring telemetry comprises measurements and other information pertinent to electrical power usage.

### Claim 16 (depends on 13)

The non-transitory CRM of claim 13, wherein the host priority list is generated based on a second portion of the monitoring telemetry, wherein the second portion of the monitoring telemetry comprises the workload criticality for workloads supported thereon, computing resource utilizations by workloads supported thereon, hardware configuration metadata describing hardware configurations installed thereon, and measurements and other operational parameters describing current states thereof.

### Claim 17 (depends on 16)

The non-transitory CRM of claim 16, wherein the host priority list is further generated through processing of the second portion of the monitoring telemetry using ensemble machine learning algorithms.

### Claim 18 (depends on 13)

The non-transitory CRM of claim 13, comprising computer readable program code, which when executed by the computer processor, further enables the computer processor to:
prior to identifying the set of power-cache devices:
identify, from a plurality of host devices, a set of power-cap devices,
wherein the set of power-cache devices is identified from the set of power-cap devices,
wherein each power-cap device, of the set of power-cap devices, represents a host device whereon a power-cap feature is enabled, wherein an enabled power-cap feature imposes an electrical power usage limit on the host device.

### Claim 19 (depends on 11)

The non-transitory CRM of claim 11, comprising computer readable program code, which when executed by the computer processor, further enables the computer processor to:
after allocating the reserve electrical power to the set of top-ranked power-hungry devices:
obtain monitoring telemetry for the set of top-ranked power-hungry devices;
make a determination, based on the monitoring telemetry, that at least one top-ranked power-hungry device, of the set of top-ranked power-hungry devices, is no longer power-hungry; and
deallocate, based on the determination, the reserve electrical power from, which had been allocated to, the at least one top-ranked power-hungry device.

### Claim 20 (depends on 19)

The non-transitory CRM of claim 19, wherein the monitoring telemetry comprises measurements and other information pertinent to electrical power usage, wherein the at least one top-ranked power-hungry device is determined as no longer power-hungry based on the electrical power usage falling below a threshold from an electrical power usage limit imposed on the at least one top-ranked power-hungry device.